• Title/Summary/Keyword: Contingency Plan

Search Result 67, Processing Time 0.026 seconds

A Study on Emergency Response Plan for Manless Light Rail Transit(LRT) (무인 경량전철 운영을 위한 비상대응 계획 수립에 관한 연구)

  • Park, Min-Kyu;Shin, Jong-Hyun;Kim, Yeon-Woong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.915-923
    • /
    • 2011
  • Our country is promoting the introduction of new means of transportation due to insufficient supply according to the existing demand of road traffic. Among them, manless light railroad transit is settled down as the most definite alternative. However, new traffic systems such as manless light railroad have certain difference between characteristics of hardware and software and subway system. Therefore, there will be many differences compared to the existing contingency system when accidents occur. Railway management organization has to establish railway contingency plan and acquire permission from the minister of the Ministry of Land, Transport, and Maritime Affairs. However, as commercial transportation is available, a new traffic system also should establish contingency plan. Therefore, the establishment of systematic contingency plan is suggested in order to analyze characteristics of manless light railroad in the beginning of introduction and to make contingency response available.

  • PDF

A Study on Estimating the Contingency Cost of Small Construct Project (소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구)

  • 송진우;표영민;박성호;이상범
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

Planning for Construction and Expanding of Distribution Substation Considering Contingency (상정사고를 고려한 배전용 변전소 신,증설 계획 수립)

  • Choi, Sang-Bong;Kim, Dae-Kyeong;Jeong, Seong-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.7
    • /
    • pp.303-308
    • /
    • 2001
  • This paper presents algorithm to plan construction and expanding of substation considering contingency accidents by proposing utilization factor according to configuration of substation bank system. In this paper, firstly, proper sphere of supply area by each district which could be standardized with respect to its supply capacity is established under assumption of long term load forecasting. Secondly, goal of utilization ratio based on configuration of substation bank was set to keep reliability by remaining sound bank when it happen to one bank accidents. Finally, it is set up for optimal construction and expanding of substation considering economy and reliability simultaneously about substation to exceed these ratio. To verify proposed algorithm, at first, after adopting a part of Kangnam area in Seoul as area for testing, it is divided into several regions for this area according to power branches of power utility. Secondly, by deriving correlation factor between load demand and economic indicators in these region respectively, the regional load forecasting was performed with economic growth and city plan scenario. Finally, based on the predicted load demand by region and land use data which is identified from air-photographic, the load demand by district was predicted. Also, planning for substation considering contingency is formulated to expand taking into account computing utilization factor which is based on configuration of substation bank respectively.

  • PDF

A Study of Improving Apartment Estate Management Method in Relation to Expanding of Reconstruction Period by Law (재건축연한 증가에 따른 공동주택 관리방법 개선에 관한 연구 (장기수선계획 및 장기수선충당금 실태조사를 중심으로))

  • Park Byong-Gyu;Cho Tae-Jea
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.141-148
    • /
    • 2005
  • This study as a demand of reconstruction allows the longevity of the multi complex, analyze the problems and solutions for a long term maintenance planning scheme, and how to save contingency fund to utilize. The major role of the multi complex housing market reflects Positively on our valuable society, provides a better life of environment on top of longevity and for the superior living duality. For a achievement and improvement existing long term maintenance Plan and contingency fund system should be considered as follows. First, shall be expanded more units of house as smaller group. Second, advice from expert shall be reconsidered, eliminated, and protected reorganizing an informal reconstruction planning comparatively legal procedure must be renegotiated and pursued. Third, the fund which saved for the contingency has to clarified as tax free item by government. It's not only mistreated as a limitation of personal asset but also treated as national source Despite of rather compulsive and constructive method must be noticed by whoever owns for, more positive follows, promotion and directing must be able to guide its understanding and adherence of importance and inevitability.

  • PDF

Strategies for Advancement of response management system on marine pollution (해양오염 방제체제의 선진화 방안)

  • Kim Dae Won
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.3 no.1
    • /
    • pp.3-24
    • /
    • 2000
  • The provability of major oil spill acidents around Korean coast is very high due to increase of sea traffic and decrease of quality of ships crews and increase of the old-ship. The Strategies of establishment of a advanced response management system against this mass pollution incident are as follows;. 1. Development of Regional Contingency Plan, which is scientifically illuminated, in order to implement the National Contingency Plan efficiently. 2. Early completion of a national response capability twenty thousand tons. 3. To strengthen training and exorcise specialized in the field of marine pollution response. 4. Establishment of a system of response cooperation among neighbor countries by promoting the NOWPAP tasks etc. The response policy in the 21th century should be concentrated to promote a practicle response capability through response operation scientifically specialized and internationalized by establishing the advanced response system early.

  • PDF

A Case Study on the Feed-Back Analysis and the Reinforcement Plan using the Measurement Data of Excavation Site close to the Existing Underground Box (기존 지하 Box 근접 굴착공사 현장의 계측결과를 이용한 역해석 및 보강방안의 적용 사례)

  • Lee, Jung-Hee;Noh, Won-Seok;Jeong, Soon-Ig;Kim, Wan-Jong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.445-456
    • /
    • 2010
  • Massive underground excavation can be carried out recently due to the technical development of the excavation for retaining wall. Feed-back analysis using field measurement results is recommended to secure the stability of the construction because calculated values at stages of the design and the construction are uncertain. Reinforcement plan should be established based on the result of it. This study deals with the underground excavation site, which is under construction and is close to structure(subway) at downtown area. The result of feed-back analysis on the measurement data of displacement at multi-soil layers was reflected to make a plan for safe construction. This case study can be useful information for contingency plan on abnormal displacement which can be occurred at similar underground excavation.

  • PDF

An Expert System for Security Assessment in Distribution System (배전계토에서의 안전도 평가를 위한 전문가 시스)

  • Park, Byoung-youn;Kim, Se-Ho;Moon, Young-Hyun
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.43 no.2
    • /
    • pp.179-188
    • /
    • 1994
  • This paper deals with implementation of an expert system to obtain an optimal plan of load transfer for fault restoration with the capability of security monitoring and assessment in distribution systems. Based on the technique of load transfer tree analysis, the proposed expert system can afford to assist system operators in proposing an optimal plan of load transfer for fault restoration, In paticular, an application of the proposed ES to practical distribution systems yields an optimal load transfer plan which ensures system security by considering security assessment for contingency of feeders and main transformers in the knowledge based sense.

A Study on the Contingency Planning Methods under the Analysis of Oil Spill Potential -Application to the Port of Busan- (유류오염 포텐셜 해석을 통한 방제대책 수립방법에 관한 연구 -부산항을 중심으로-)

  • Jeon, Yong-Ho;Ryu, Cheong-Ro;Hwang, Chang-Su
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2003.10a
    • /
    • pp.297-302
    • /
    • 2003
  • This study was carried out to check the contingency planning methods under the analysis of oil spill potential and make a guide line to apply the results to the port of Busan. The expected spilled oil drift patterns are considered with the most probable scenarios under the base of the oil spill potential. The results obtained from this study are as follows: (1) Analysis method of oil spill potent was proposed and the applicability was proved by the application example to the port of Busan to make the contingency plan. (2) Responsible oil spill contingency planning methods / flow are suggested considered environmental factors and the oil spill potential. (3) The coastal waters of Busan was consist of rocky flat, man-made solid shore and beach shore. Marine traffic have high density of oil tanker and cargo ship. Also, oil tanker ship are examined in the small ships to be less than 3000t to supply oil to the ship moored / anchored as well as the large amount of oil tank / basin are located along the coast of Busan port. These systems are introduced to make in put data to the analysis of oil spill potential. (4) According to the analysis of historical records of oil spill accident in Busan, the frequency of accidents by cargo ship rank highest and 45% of accidents is caused by carelessness. about 65% of total accidents shows a small spill accident of less than $10k{\ell}$.

  • PDF