• Title/Summary/Keyword: Cost Estimating Model

Search Result 337, Processing Time 0.035 seconds

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

K-1 Tank Life Cycle Cost Estimate Using PRICE Model (PRICE 모델을 이용한 K1전차 수명주기 비용추정)

  • 강창호;강성진
    • Journal of the military operations research society of Korea
    • /
    • v.25 no.2
    • /
    • pp.44-61
    • /
    • 1999
  • Cost estimation has posed a significant challenge to estimators, planners, and managers in both government and military. Considerable historical evidence shows that accurate cost estimation has been difficult to achieve across a wide range of projects, including weapon systems. This paper introduces new cost estimating concept, CAIV(Cost As an Independent Variable) and a cost estimating case study using PRICE model, computer aided parametric estimating models(CAPE) for K1 tank cost estimate. CAIV concept is to set realistic but aggressive cost objectives easily in each acquisition program and to achieve cost, schedule, and performance objectives considering various managing risks with a project manager and industry teams. The Price model is one of computer aided cost estimating models and widely used in U.S. defense system analysis as a tool for CAIV. We analyze theories, inputs, outputs of the PRICE model and present a case study for K1 tank to estimate costs in requirement and concept phase, program and budgeting phase, and life cycle phase. Finally we obtain results that the Price model can be used in various phases of PPBEES depending upon available data and time.

  • PDF

A COST DATA-BASED ESTIMATING MODEL FOR FINISHES IN THE KOREAN PUBLIC OFFICE BUILDING PROJECTS

  • Joon-Oh Seo;Sang H.Park;Choong-Wan Koo;Jong-Hoon Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.685-691
    • /
    • 2009
  • Recently, public office building projects are being recognized by many construction engineers and researchers, as the critical projects in the construction industry. The project budgets have sometimes exceeded due to the lack of core knowledge, experiences, skills and experts concerned in cost planning and estimating in the pre-construction stage. It has been highlighted that planning and estimating effectively the cost of public office building projects as critical in the design stage. Within this context, some cost data books and systems, such as RSMeans cost data systems and Spon's price book, have been systematically developed and used by many construction cost managers and organizations in order to effectively estimate and use their project budgets. As a result of this research, a cost estimating model for finishes has been developed, considering the cost data used in public office building projects.

  • PDF

A Conceptual Model for Automated Cost Estimating Using Work Information Classification System of Apartment House (공동주택의 공사정보분류체계를 활용한 적산 자동화 개념 모형 개발)

  • Lee, Yang Kyu;Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.15-24
    • /
    • 2014
  • The study presents work information classification system of apartment house which can organize all construction management services throughout the planning and management of a construction such as the decomposition of the design process, the assembly of construction process and cost estimating, etc. In addition, the study suggested a way to connect work information classification system based on a relational database in working order and built a conceptual model for automated cost estimating by utilizing established data base. A conceptual model for automated cost estimating will resolve the fundamental problems of the existing cost estimating system and will be able to take advantage of scientific cost estimating system at the construction site of apartment house.

SCHEMATIC ESTIMATING MODEL FOR CONSTRUCTION PROJECTS -USING PRICIPLE COMPONENT ANALYSIS AND STRUCTURAL EQUATION METHOD

  • Young-Sil Jo;Hyun-Soo Lee;Moon-Seo Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1223-1230
    • /
    • 2009
  • In the construction industry, Case-Based Reasoning (CBR) is considered to be the most suitable approach and determining the attribute weights is an important CBR problem. In this paper, a method is proposed for determining attribute weights that are calculated with attribute relation. The basic items of consideration were qualitative and quantitative influence factors. These quantitative factors were related to the qualitative factors to develop a Cost Drivers-structural equation model which can be used to estimate construction cost by considering attribute weight. The process of determining the attribute weight-structural equation model consists o 4 phases: selecting the predominant Cost Drivers for the SEM, applying the Cost Driers in the SEM, determining and verifying the attribute weights and deriving the Cost Estimation Equation. This study develops a cost estimating technique that complements the CBR method with a Cost Drivers-structural equation model which can be actively used during the schematic estimating phases of construction.

  • PDF

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

Development of Cost Estimating Model Using Quantity Variation Analysis by Influence Variables for the Schematic Design Phase (영향변수에 따른 수량변화 분석을 이용한 기본설계단계의 개산견적 모델 개발)

  • Son, Bo-Sik;Lee, Hyun-Soo;Kim, Sung-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.155-166
    • /
    • 2007
  • The purpose of this research is to develop a conceptual model and prototype that establishes a new approach for building cost estimating in the schematic design phage. This research use the method that analyzes quantity and unit price separately to enhance schematic cost estimating through conducting literature review andi analyzing existing schematic cost estimating methods. In addition, this study proposes tile concept of cost breakdown structure including two more classifications: building element and floor compared to existing one only classified by trade. Thus, a Quantity Based Active Schematic cost Estimating(Q-BASE) model is developed founded on those two concepts. By applying proposed schematic cost estimating model, historical structure cost of residential complex building project is analyzed, and then, based on this analysis, prototype is implemented.

Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project - (건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 -)

  • Kim, Soo-Min;Cho, Jae-Ho;Lee, Jong-Sik;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.212-215
    • /
    • 2008
  • When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.

  • PDF

Development of a model for an equation for estimating construction costs based on the resource-based cost estimating system for TBM (TBM 공법의 자원기반 적산 방식에 의한 개산 공사비 예측 식 모델 개발)

  • Han, Seung-Hee;Park, Hong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.3
    • /
    • pp.1474-1480
    • /
    • 2013
  • This study attempted to estimate construction costs in accordance with the resource-based cost estimation (unit cost price) system by diameter for TBM method, and analyzed the direct cost and the total cost. Based on such figures, this study performed a regression analysis and proposed a model for an equation for estimating construction costs. model for the resource-based cost estimation (unit cost price) system classified by diameter for TBM method proposed by this study can be effectively applied to business planning, preliminary investigation, feasibility study, construction cost estimations in the early design stages.

A Standard Section-Based Approximate Cost Estimating Model on Tunnel (II) - Cost Variance Index Table and Test - (표준단면을 이용한 터널 공사비 예측모델 개발 (II) - 공사비 변동 모델 및 검증 -)

  • Cho, Jeongyeon;Kim, Sang-Kwi;Kim, Kyoungmin;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.677-684
    • /
    • 2008
  • The paper provides an approximate cost estimating model that can be used for tunnel. Based on the previous study analyzed critical factors that have impact on tunnel construction cost, this paper establishes a cost variance index table that reflects the cost impacts due to the change of the critical cost factors. An estimating procedure is described utilizing the index table. For the verification of the suggested model, the comparison of the estimated construction cost with real project cost is performed. The estimated results range from 95%~111% of the real project costs. As an approximate tunnel cost estimating model, the model can be utilized to quickly estimate tunnel construction costs based on the conceptual information at the planning stage and to efficiently make a decision on design alternatives.