• Title/Summary/Keyword: Cost analysis

Search Result 11,842, Processing Time 0.036 seconds

The Effects of Slab Size on Pavement Life Cycle Cost

  • Parsons, Timothy A.;Hall, Jim W.Jr
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.49-54
    • /
    • 2006
  • The purpose of this study was to determine the effect of expansion joint spacing (slab size) on the life cycle costs of owning Portland Cement Concrete (PCC) airfield pavements. Previous research has shown that slab size has a statistically significant impact on pavement performance. A probabilistic life cycle cost analysis was performed to determine if the effect of slab size on pavement performance would affect the total cost of ownership of PCC pavements. Data from 48 Pavement Condition Index (PCI) inspections of military and civilian airfields were used to develop probability-of-distress-by-condition curves, which were then used to develop probabilistic cost-of-repair-by-condition curves. A present worth life cycle cost analysis was then performed for various slab sizes, using construction costs, rehabilitation costs, and maintenance costs. Maintenance costs were determined by assuming a condition deterioration rate appropriate for each slab size and applying the cost-by-condition curves. The probabilistic cost-of-repair-by-condition curves indicated that smaller slabs are more expensive to repair on a unit cost basis. Life cycle cost analysis showed that larger slabs have a higher total cost of ownership than smaller slabs due to a faster rate of deterioration.

  • PDF

ASSESSMENT OF ACTIVITY-BASED PYROPROCESS COSTS FOR AN ENGINEERING-SCALE FACILITY IN KOREA

  • KIM, SUNGKI;KO, WONIL;BANG, SUNGSIG
    • Nuclear Engineering and Technology
    • /
    • v.47 no.7
    • /
    • pp.849-858
    • /
    • 2015
  • This study set the pyroprocess facility at an engineering scale as a cost object, and presented the cost consumed during the unit processes of the pyroprocess. For the cost calculation, the activity based costing (ABC) method was used instead of the engineering cost estimation method, which calculates the cost based on the conceptual design of the pyroprocess facility. The calculation results demonstrate that the pyroprocess facility's unit process cost is $194/kgHM for pretreatment, $298/kgHM for electrochemical reduction, $226/kgHM for electrorefining, and $299/kgHM for electrowinning. An analysis demonstrated that the share of each unit process cost among the total pyroprocess cost is as follows: 19% for pretreatment, 29% for electrochemical reduction, 22% for electrorefining, and 30% for electrowinning. The total unit cost of the pyroprocess was calculated at $1,017/kgHM. In the end, electrochemical reduction and the electrowinning process took up most of the cost, and the individual costs for these two processes was found to be similar. This is because significant raw material cost is required for the electrochemical reduction process, which uses platinum as an anode electrode. In addition, significant raw material costs are required, such as for $Li_3PO_4$, which is used a lot during the salt purification process.

The Cost Monitoring of Construction Projects through Earned Value Analysis

  • Waris, Muhammad;Khamidi, Mohd Faris;Idrus, Arazi
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.42-45
    • /
    • 2012
  • In construction industry, the term 'procurement' is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators such as cost monitoring is an ongoing process and its importance cannot be undermined during the project life cycle. It can be monitored by using traditional approach of direct reporting of actual cost against budget. However, the comparison of budget versus actual spending does not indicate the worth of the work which is completed at any given time. This approach does not represent the true cost performance of the project. Because of these limitations, this paper discusses the applications of Earned Value Analysis (EVA) for cost monitoring of construction projects in Malaysia. Besides traditional approach, EVA is a three-dimensional approach that compares three cost indicators i.e. the budgeted value of work scheduled with the earned value of physical work completed and the actual cost of work completed. Therefore, cost monitoring by EVA is an objective measure of actual work performed. This paper uses a case study, an example application of EVA as a cost monitoring tool. This case study reaffirms the benefits of using EVA for project cash flow analysis and forecasting.

Cost Analysis of Electrokinetic Process for Desalination of Saline Agricultural Land (염류집적 농경지 탈염을 위한 전기역학적 처리공정의 비용산출)

  • Kim, Do-Hyung;Choi, Jeong-Hee;Jo, Sung-Ung;Baek, Ki-Tae
    • Journal of Soil and Groundwater Environment
    • /
    • v.17 no.4
    • /
    • pp.91-97
    • /
    • 2012
  • In this study, cost analysis of electrokinetic (EK) restoration process for desalination of saline agricultural land was performed for field application based on a pilot scale field application. For reasonable cost analysis, EK process was classified into three major parts: system design, installation and operation. Cost of system installation consists of materials and installation for electrode/electric wire, power supply and data monitoring, drainage system, etc. Operation cost was calculated based on electrical consumption and water charges for EK process. Total cost for EK process was 2,943,013 won for $1000m^2$ in greenhouse area. Cost for system installation was 2,553,786 won, that is, 87% of total cost, while cost for system operation was 389,229 won, that is, 13% of total cost.

A Conceptual Model of Web-based VE Cost Model Analysis System (웹 기반 VE Cost모델 분석 시스템의 개념적 모형)

  • Lee, Chang-Hong;Oh, Chi-Don;Park, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.416-419
    • /
    • 2007
  • In the case of domestic, related information of expenses in order to draw up cost model at the early stage haven't been stored systematically; moreover, similar projects which were accomplished in the past time have lacked data about actual results connected itself. Accordingly, a reliable object hasn't been selected because validity of cost comparing a main function is difficult to dearly decide. Consequently, This study Cost model who can procures and shares and utilizes, studies that is achieved past Cost information of similarity project and achieves in phase zero for target choice of VE activity to systematic and efficient analysis wishes to present conceptional pattern of available Web-Based VE 'Cost model analysis system (Cost Model Analysis System: CMAS)'.

  • PDF

A Study on the design of hospital budget variance analysis model reflecting efficiency and an attainable target cost (효율성과 목표원가를 반영한 병원예산 원가차이 분석 모형 설계)

  • O, Dongil
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.2
    • /
    • pp.696-706
    • /
    • 2013
  • This study aims to develop DEA model which can look into budget cost variance analysis tool based on standard cost using 68 hospital's input and output data. For accomplishing this purpose, by introducing new DEA model which can get an attainable target cost, we can decompose an actual cost difference into several meaningful sub variances. Also based on the 2008 general hospital data, this model can make variance analysis between actual cost and target cost. Total variance can be divided into technical inefficiency variance, price inefficiency variance, allocation inefficiency variance. This study introduces that by using target budget cost concept, traditional actual cost variance can be divided into a technical variance, price variance, budget variance. Finally, we can get result which confirms there does not exist favorable size effects on efficiency and cost management in running a general hospital.

Cost and Profit Efficiency of Banks: Stochastic Frontier Analysis vs Data Envelopment Analysis

  • Baten, Md. Azizul;Kasim, Maznah Mat;Rahman, Md. Mafizur
    • Asia-Pacific Journal of Business
    • /
    • v.6 no.2
    • /
    • pp.1-17
    • /
    • 2015
  • This study compares the most widely used parametric and non-parametric techniques to measure cost and profit efficiency of banks, namely the Stochastic Frontier Analysis (SFA) and Data Envelopment Analysis (DEA). We formulate the specification form of both stochastic cost and profit frontier models and constant return to scale Cost DEA and Profit DEA models and provide an empirical assessment of the cost and profit frontiers based on a panel dataset of National Commercial Banks (NCBs) and Private Banks (PBs) in Bangladesh over the 2001-2010 period. The cost inefficiency and profit efficiency are slightly higher for PBs than NCBs in case of both SFA and DEA. The coefficients of advance and off-balance sheet items are significant that positively influence the banks in stochastic cost frontier model while the advance, other earning assets, price of borrowed fund are significant and negative effects on the banks in stochastic profit frontier model. The average cost inefficiency and average profit efficiency are recorded with 16.3% and 91% respectively. The highest and lowest cost inefficiency are observed for Janata Bank and United Commercial Bank Limited whilst the highest and lowest profit efficiency are recorded for Eastern Bank Limited and Janata Bank respectively. The average technical and allocative efficiency are 68.8% and 35.9%, respectively in case of CRS cost-DEA model whereas they are 70.3% and 31.8% in case of CRS profit-DEA model. The average cost inefficiency is recorded 6.3% by SFA whereas it is 24.5% by DEA. The average profit efficiency is found 91% by SFA while it is 22.1% by DEA, and SFA method shows better bank efficiency than DEA.

  • PDF

Optimal Design of Bridge Substructure Considering Uncertainty (불확실성을 고려한 교량 하부구조 최적설계)

  • Pack, Jang-Ho;Shin, Young-Seok;Shin, Wook-Bum;Lee, Jae-Woo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.387-390
    • /
    • 2008
  • The importance of the life cycle cost analysis for construction projects of bridge has been recognized over the last decades. Accordingly, theoretical models, guidelines, and supporting softwares have been developed for the life cycle cost analysis of bridges. However, it is difficult to predict life cycle cost considering uncertainties precisely. This paper presents methodology for optimal design of substructure for a steel box bridge. Total life cycle cost for the service life is calculated as sum of initial cost, damage cost considering uncertainty, maintenance cost, repair and rehabilitation cost. The optimization method is applied to design of a bridge substructure with minimal cost, in which the objective function is set to life cycle cost and constraints are formulated on the basis of Korean Bridge Design Specification. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on the damage probabilities to consider the uncertainty of load and resistance. An advanced first-order second moment method is used as a practical tool for reliability analysis using damage probability. Maintenance cost and cycle is determined by a stochastic method and user cost includes traffic operation costs and time delay costs.

  • PDF

A Study on Re-calculation of Recycling Standard Cost through the Analysis on Standard Cost (표준원가 분석을 통한 재활용 기준비용 재산정에 관한 연구)

  • Lee, Hee-Nahm;Choi, Yoon-Jeong
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.1
    • /
    • pp.189-193
    • /
    • 2011
  • The current standard cost for recycling applied under the Extended Producer Responsibility(EPR) institution, is not coping with continuously increased number of obligatory subject items as well as a variety of variable cost changing factors regarding the recycling treatment cost caused by price fluctuation such as increased material and labor cost entirely across the society; changes in recycling treatment process following the developing technologies; and changes in the required work forces and equipments followed by the trends of automated facilities. Despite such various cost fluctuation factors, the current EPR is not coping with the trends, making the re-calculation process difficult, which causes differences between the real treatment cost for recycling. In this study, the analysis was made on main factors affecting on the related cost and the related price changing index was calculated, by conducting the influence evaluation on the standard cost factors of the current standard cost for recycling. Through theses results, more objective standard will be set for the re-calculation of standard cost for recycling to greatly contribute to setting up the midterm and long-term strategies in the future towards efficient institution.

Ratio Estimation of Indirect Cost Sector about Defense Companies by Statistic Technique (통계 기법에 의한 방산업체의 간접원가부문 비율 추정)

  • Lim, Hyeoncheol;Kim, Suhwan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.4
    • /
    • pp.246-252
    • /
    • 2017
  • In the defense acquisition, a company's goal is to maximize profits, and the government's goal is to allocate budgets efficiently. Each year, the government estimates the ratio of indirect cost sector to defense companies, and estimates the ratio to be applied when calculating cost of the defense articles next year. The defense industry environment is changing rapidly, due to the increasing trend of defense acquisition budgets, the advancement of weapon systems, the effects of the 4th industrial revolution, and so on. As a result, the cost structure of defense companies is being diversifying. The purpose of this study is to find an alternative that can enhance the rationality of the current methodology for estimating the ratio of indirect cost sector of defense companies. To do this, we conducted data analysis using the R language on the cost data of defense companies over the past six years in the Defense Integrated Cost System. First, cluster analysis was conducted on the cost characteristics of defense companies. Then, we conducted a regression analysis of the relationship between direct and indirect costs for each cluster to see how much it reflects the cost structure of defense companies in direct labor cost-based indirect cost rate estimates. Lastly a new ratio prediction model based on regularized regression analysis was developed, applied to each cluster, and analyzed to compare performance with existing prediction models. According to the results of the study, it is necessary to estimate the indirect cost ratio based on the cost character group of defense companies, and the direct labor cost based indirect cost ratio estimation partially reflects the cost structure of defense companies. In addition, the current indirect cost ratio prediction method has a larger error than the new model.