• 제목/요약/키워드: Crew Productivity

검색결과 31건 처리시간 0.019초

특수 플랜트 철근콘크리트 공종의 작업조 생산성 및 영향요인 분석 (Analysis of the Crew Productivity and Influence Factor for Special-Plant Reinforce Concrete)

  • 허영기;임진호;안영철;오재훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.42-43
    • /
    • 2014
  • Few studies on crew productivity has been conducted, although the data is significant for time and cost estimation. Crew productivity data was collected for over 9 months from a nuclear power plant and analysed in order to identify factors driving the productivity. It was revealed that the crew productivity of form work, rebar work and concrete pouring work was 45.64(㎡/crew·day), 2.93(t/crew·day), 110.25(㎡/crew·day) on average respectively. Moreover, 'nightwork', 'No. of workers per crew' and 'total work amount' were identified as drivers.

  • PDF

Quantitative Analysis on Factors Affecting Crew Productivity : Crew Size

  • 허영기
    • 한국건설관리학회논문집
    • /
    • 제5권3호
    • /
    • pp.146-152
    • /
    • 2004
  • Consideration of factors driving crew productivities is imperative for accurate construction time estimation. Their impacts need to be well understood by estimators. There have been, however, little studies that quantified relationships between crew productivities and factors. This paper quantifies impacts of $^{\circ}A$ECrew size $^{\circ}\phi$ on crew productivities, for three highway concrete bridge activities, namely Column, Cap, and Deck, based on data compiled from 17 on-going highway projects in Texas State, USA. It was found that, for Bridge Deck operation, an increase of one crew-worker of formwork and rebarwork by one, leads to an increase of the productivity (cy/crew day) by 2.5 and 2.9, respectively. For the other activities, larger crew sizes did not lead to better crew productivities.

특수 플랜트 형틀공종의 생산성 및 영향요인 분석 (Analysis of the Productivity and Influence Factor for Special-Plant Formwork)

  • 허영기;임진호;오재훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.90-91
    • /
    • 2013
  • In the field of nuclear power construction, management and the systematic construction is very necessary. For more efficiently managing, analysis of influence factors and productivity is indispensable now. On this research, we collected the data from the nuclear power plant which is located in Korea. We analyzed the productivity and influence factors. As a result, productivity was 0.75(㎡/man·hour).On one hand, the productivity should be personnel, weather and whether there is a night duty or not. On the other hand, work crew depends upon operators, formwork amount, the presence or absence of night duty.

  • PDF

IPA를 이용한 도로교량 골조공사의 작업조 생산성 관리요인의 중요도 및 실행도 분석 (Analysis of Major Management Factors Affecting Crew Productivity in Road Bridge Construction Site Using IPA)

  • 허영기;이상호
    • 한국건설관리학회논문집
    • /
    • 제20권3호
    • /
    • pp.39-45
    • /
    • 2019
  • 건설현장의 생산성은 견실성 및 생산활동의 효율성 평가을 위한 매우 중요한 지표이며, 건설 현장작업은 모두 작업조를 중심으로 수행됨으로 작업조의 생산성 관리는 특히 중요하다. 문헌연구 및 전문가 인터뷰를 통해 도출된 27개의 관리요인들로 설문조사를 실시하였으며 32부를 회수하여 분석하였다. 대분류항목의 실행도 및 중요도를 분석한 결과, '장비'와 '건설인력' 항목이 도로교량 공사의 작업조 생산성에 매우 중요한 것으로 나타났으며, 실행도는 중요도에 비해 비교적 미비한 것으로 밝혀졌다. 또한 소분류 항목 27개를 분석한 결과, 지속적인 관심을 가져야 하는 항목으로는 '적기의 장비조달', '효율적 작업조 구성', '작업자의 숙련도', '현장통제 및 감독능력'이 중요도에 비해 실행도가 낮음으로 보다 더 향상시킬 필요가 있는 관리 요인들로는 '장비 가동성능', '설계도서의 정확성', '시공상세도의 정확성', '작업지시 및 승인 시기', '작업지시의 정확성' 등인 것으로 밝혀졌다. 본 연구의 결과는 앞으로 도로공사의 구조체 공사에서 작업조 생산성 향상을 위해 유용하게 사용될 수 있을 것으로 사료된다.

The Development of Probabilistic Time and Cost Data: Focus on field conditions and labor productivity

  • Hyun, Chang-Taek;Hong, Tae-Hoon;Ji, Soung-Min;Yu, Jun-Hyeok;An, Soo-Bae
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권1호
    • /
    • pp.37-43
    • /
    • 2011
  • Labor productivity is a significant factor associated with controlling time, cost, and quality. Many researchers have developed models to define methods of measuring the relationship between productivity and various parameters such as the size of working area, maximum working hours, and the crew composition. Most of the previous research has focused on estimating productivity; however, this research concentrates on estimating labor productivity and developing time and cost data for repetitive concrete pouring activity. In Korea, "Standard Estimating" only entails the average productivity data of the construction industry, and it is difficult to predict the time and cost spent on any particular project. As a result, errors occur in estimating duration and cost for individual activities or projects. To address these issues, this research sought to collect data, measure productivity, and develop time and cost data using labor productivity based on field conditions from the collected data. A probabilistic approach is also proposed to develop data. A case study is performed to validate this process using actual data collected from construction sites. It is possible that the result will be used as the EVMS baseline of cost management and schedule management.

PROBABILISTIC MODEL-BASED APPROACH FOR TIME AND COST DATA : REGARDING FIELD CONDITIONS AND LABOR PRODUCTIVITY

  • ChangTaek Hyun;TaeHoon Hong;SoungMin Ji;JunHyeok Yu;SooBae An
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.256-261
    • /
    • 2011
  • Labor productivity is a significant factor related to control time, cost, and quality. Many researchers have developed models to define method of measuring the relationship between productivity and various constraints such as the size of working area, maximum working hours, and the crew composition. Most of the previous research has focused on estimating productivity; however, this research concentrates on estimating labor productivity and developing time and cost data for repetitive concrete pouring activity. In Korea, "Standard Estimating" only contains the average productivity data of the construction industry, and it is difficult to predict the time and cost of any particular project; hence, there are some errors in estimating duration and cost for individual activity and project. To address these issues, this research collects data, measures productivity, and develops time and cost data using labor productivity based on field conditions from the collected data. A probabilistic approach is also proposed to develop data. A case study is performed to validate this process using actual data collected from construction sites and it is possible that the result will be used as the EVMS baseline of cost management and schedule management.

  • PDF

도로공사 대표공종의 생산성 정보 개발에 대한 연구 (A Study on the Development of Work-Crew based Daily-Productivity for Representative B.O.Q Item in Road Project)

  • 서지형;박형근
    • 한국건설관리학회논문집
    • /
    • 제12권6호
    • /
    • pp.42-53
    • /
    • 2011
  • 2004년 예정가격 산정방법으로 실적공사비 적산제도가 본격적으로 시행되면서 상대적으로 표준품셈 적산제도의 적용이 하락하였다. 그러나 2010년 하반기 예정가격 산정시 표준품셈 적산제도의 적용비중은 45%이며, 여전히 높은 적용비중을 유지하고 있다. 현행 표준품셈은 예정가격의 산정에 과도한 시간이 소요되고, 시공계획과 자원분배에 적용하기 어려운 단점이 있다. 이와 같은 단점을 개선하기 위하여 본 연구에서는 국내외 품셈의 형식을 고찰하여 이를 국내 도로분야 대표공종에 적용하여 기존 품셈을 일단위 작업조 기반 생산성 정보로 산출하여 유사한 조건하에서 일본 미국의 생산성 정보 및 현장자문을 통한 정보와 비교하였다. 본 연구를 통해 적용된 작업조기반 생산성 정보 산출 방법과 산출 정보의 효용성을 확인하고자한다. 이러한 과정을 통하여 표준품셈을 통한 작업조기반 생산성 정보 산정 방법'과 일단위 작업조 기반 생산성 정보를 제시하고자 한다.

하천공사 대표공종의 작업조 구성 및 생산성 정보 개발 (A Study on the Development of Work-Crew Based Daily-Productivity for Representative B.O.Q Item in River Conservation Project)

  • 유덕열;박형근;임형민
    • 대한토목학회논문집
    • /
    • 제33권6호
    • /
    • pp.2519-2528
    • /
    • 2013
  • 표준품셈은 공공기관 및 민간기관의 공사비를 책정하는 기본적인 자료로 이용되고 있다. 본 논문은 하천공사에서 선정된 대표공종을 대상으로 새로운 형식의 표준품셈 및 장비의 작업량 산출방식을 제안하고자 한다. 품셈에서 작업조 구성의 정보 및 1일 생산성 정보의 제공이 가능하도록 함으로써 공정계획 단계에서 품셈의 적용성을 향상시키고 장비의 작업량 산출과정을 간소화하여 사용자의 편의성을 증대할 수 있기를 기대한다. 하천공사의 경우 작업조건이라는 변수가 매우 크게 작용하기 때문에 생산성 정보 및 기계의 작업량을 일반화 하는 것은 많은 어려움이 존재하지만 지속적인 생산성 정보와 기계의 작업량 정보를 개선하여 정확도를 향상할 수 있다면 품셈을 통한 공정계획 수립 및 적산과정의 간소화가 가능할 것이다.

시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석 (Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction)

  • 하기주;최민권;이동렬;하민수;하재훈;김외곤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

공동주택 SYSTEM FORM 공사의 생산성 분석 및 향상방안 제안 (Productivity Analysis and Improvement of the System Form Construction in the Apartment Housing Project)

  • 김도형;김경래
    • 한국건설관리학회논문집
    • /
    • 제2권3호
    • /
    • pp.101-109
    • /
    • 2001
  • 벽식 구조 공동주택(고층아파트)은 수평, 수직구조체가 동일하게 연속되므로 시스템거푸집 시공이 효율적이다. 그런데 현재 많은 고층 건축물 시공현장에서 사용되고 있는 시스템 거푸집은 전용횟수의 증대와 콘크리트 품질향상의 장점을 가지고 있지만, 공장 제작되어 현장 반입된 후 2차 조립 과정중의 공기지연 및 시공초기의 인력과다투입 등으로 초기 계획공정달성에 많은 애로점을 가지고 있다. 이러한 측면에서, 각각의 노무자들이 실제 생산적인 작업에 소비하는 시간 비율과 공사지연의 정도 및 원인 등을 평가대상으로 생산성 저하의 원인을 찾아내어 개선방안을 찾아보고자 한다. 본 연구는 시스템거푸집 공정을 수행하고 있는 아파트 신축현장을 선택하여, 다양한 생산성 분석방법 중의 하나인 워크샘플링(Work Sampling)를 통하여 생산성을 분석한 후, 크루발런스스터디(Crew Balance Study)를 통하여 생산성 향상방안을 현장조립공정과 내부 폼(form)작업, 외부 폼(form)작업으로 구분하여 제시하였다.