• Title/Summary/Keyword: Dam construction upstream

Search Result 79, Processing Time 0.032 seconds

Zooplankton and Phytoplankton Dynamics with the Construction of River Mouth Dam in Kum River Estuary, Korea

  • Kim, Say-Wa;Han, Myung-Soo;Lee, Kyung;Choi, Young-Kil;Yoo, Kwang-Il
    • Korean Journal of Ecology and Environment
    • /
    • v.35 no.2 s.98
    • /
    • pp.141-144
    • /
    • 2002
  • The construction of river mouth dam has prevented seawater from backwarding to upstream in Kum river estuary since 1990. Field observation on environmental factors, and zooplankton and phytoplankton dynamics have been carried out three times with two month interval in the summer and autumn in 2000 at three selected stations in Kum river estuary. Blockade of seawater flowing backward to upstream caused sharp contrast of zooplankton fauna and phytoplankton flora between upstream and downstream of the river mouth dam. Freshwater cladocerans i.e., Bosmina longisrostris and Daphnia galeata dominated in the upstream, and marine copepods of Acartia omorii and Paracalanus crassirostris occurred abundantly in downstream of the dam. Freshwater diatoms did not distributed in the downstream of the dam except Melosira varians, while marine diatom of Cylidrotheca closterium occurred in benthic waters bath in upstream and downstream of the dam. The construction of the river mouth dam seems to play an ecological role to blockade the input of marine organism into the upstream in Kum river estuary.

The Influence of Gunwi Dam Construction on Community Fluctuations of Benthic Macroinvertebrates (군위댐 건설 공사가 저서성대형무척추동물 군집 변동에 미치는 영향)

  • Kwon, Hyeok-Yeong;Lee, Mi-Jin;Park, Jinyoung;Lee, Jong-Eun
    • Journal of Environmental Science International
    • /
    • v.23 no.5
    • /
    • pp.807-817
    • /
    • 2014
  • Benthic macroinvertebrates were seasonally sampled from upstream and downstream of the Gunwi Dam construction site from 2006 to 2012. Totally 148 and 165 species were collected at the upstream and downstream sampling sites, respectively. At the upstream area after dam construction, there was no significant change of the numbers of non-insect taxa, but at the downstream area, the non-insect taxon numbers were increased gradually. The individual ratio of Ephemeroptera and Diptera had higher value than the other taxa in both of up and downstream. The trichopteran individual ratios were increased in upstream sites, but decreased in downstream sites from 2010. Also, non-insects and coleopteran individual ratios were decreased in upstream, but increased in downstream after completion of dam construction. The annual range of fluctuation in community indices narrowed after construction. According to a functional feeding group analysis, the individual ratios of FC (Filtering Collector) were increased, and GC (Gathering Collector) and SC (Scraper) were decreased in upstream sites annually. In contrast, the annual individual ratios of FC were decreased, and GC and SC were increased in the downstream sites.

An alternative upstream method for the Zhelamuqing tailings impoundment construction of a Copper Mine in China

  • Wei, Zuoan;Chen, Yulong;Yin, Guangzhi;Yang, Yonghao;Shu, Weimin
    • Geomechanics and Engineering
    • /
    • v.19 no.5
    • /
    • pp.383-392
    • /
    • 2019
  • How to safely and economically dispose mining tailings is a challenge to mine operators. This paper presents an alternative upstream method for tailings dam construction, termed as the template construction method (TCM), which has been successfully implemented at Zhelamuqing tailings impoundment since 2004. By the beginning of 2015, the tailings dam wall had reached 95 m in height for the 46 upstream raises, with the total height of the dam including the starter dyke being 128 m. The proposed TCM is relatively simple and cost-effective and provides a good way for constructing rapidly raising tailings dam based on this case.

Dam Inflow Evaluation using Hydrograph Analysis (수문곡선 분리를 통한 댐 유입량 평가)

  • Jung, Younghun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.3
    • /
    • pp.95-105
    • /
    • 2018
  • Understanding the composition of the dam inflow can improve the efficiency of dam operation considering the seasonal characteristics. Hydrograph analysis is one of the methods to identify the characteristics of dam inflow. In addition, baseflow separation on the dam inflow can be affected by anthropogenic influences depending on dam locations. In this regard, the objectives of this study are 1) to analyze yearly and monthly baseflow contribution to the dam inflow and 2) to compare the baseflow contribution to the inflow in dams located upstream and downstream of the watershed. The result shows that the estimated baseflow index was smaller in the upstream dams compared to the downstream dams. Discharge from the upstream water infrastructure including dams and reservoirs can be a part of inflow into the downstream water infrastructure. Based on this scenario, the discharge regulated from the upstream dam could lead to overestimation of baseflow contribution to inflow into the downstream dam. We expect that the results from this study elucidate the role and function of dams and hence, contribute to the efficient operation of dams located in the upstream and the downstream of the watershed.

Assessment of Physical River Disturbances in the Namgang-dam Downstream (남강댐하류의 물리적 하천교란 평가)

  • Kim, Ki-Heung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.3
    • /
    • pp.74-86
    • /
    • 2008
  • To assessment the disturbances of the Namgang caused by dam construction, upstream area was selected for the reference reach and downstream area was selected for the comparison reach. And these reaches were surveyed and analyzed according to the assessment criteria of the river disturbances.The artificial factors of river disturbances were classified as river improvement works, dam construction and aggregate dredging. The indexes were physical factors as like epifaunal (bottom), embeddedness, velocity/depth regime, sediment deposition, channel flow status, channel alteration, frequency of riffles, bank stability, vegetative protection, riparian zone etc.The assessment results showed 46% of the assessment criteria which was serious status in dam downstream area and 89.5% of it which was excellent status in dam upstream.Finally, the results showed that physical river environment in downstream area was disturbed by the discharge control and the interception of sediment discharge by dam, consequently this disturbance give rise to impact of ecosystem in river.

Prediction of Water Level at Downstream Site by Using Water Level Data at Upstream Gaging Station (상류 수위관측소 자료를 활용한 하류 지점 수위 예측)

  • Hong, Won Pyo;Song, Chang Geun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.28-33
    • /
    • 2020
  • Recently, the overseas construction market has been actively promoted for about 10 years, and overseas dam construction has been continuously performed. For the economic and safe construction of the dam, it is important to prepare the main dam construction plan considering the design frequency of the diversion tunnel and the cofferdam. In this respect, the prediction of river level during the rainy season is significant. Since most of the overseas dam construction sites are located in areas with poor infrastructure, the most efficient and economic method to predict the water level in dam construction is to use the upstream water level. In this study, a linear regression model, which is one of the simplest statistical methods, was proposed and examined to predict the downstream level from the upstream level. The Pyeongchang River basin, which has the characteristics of the upper stream (mountain stream), was selected as the target site and the observed water level in Pyeongchang and Panwoon gaging station were used. A regression equation was developed using the water level data set from August 22th to 27th, 2017, and its applicability was tested using the water level data set from August 28th to September 1st, 2018. The dependent variable was selected as the "level difference between two stations," and the independent variable was selected as "the level of water level in Pyeongchang station two hours ago" and the "water level change rate in Pyeongchang station (m/hr)". In addition, the accuracy of the developed equation was checked by using the regression statistics of Root Mean Square Error (RMSE), Adjusted Coefficient of Determination (ACD), and Nach Sutcliffe efficiency Coefficient (NSEC). As a result, the statistical value of the linear regression model was very high, so the downstream water level prediction using the upstream water level was examined in a highly reliable way. In addition, the results of the application of the water level change rate (m/hr) to the regression equation show that although the increase of the statistical value is not large, it is effective to reduce the water level error in the rapid level rise section. Accordingly, this is a significant advantage in estimating the evacuation water level during main dam construction to secure safety in construction site.

Numerical Analysis for Bed Changes in the Upstream Channel due to the Installation of Sediment Release Openings in the Flood Control Dam (홍수조절댐에서의 배사관 설치에 따른 상류 하천의 하상변동에 관한 수치모의 연구)

  • Ji, Un;Son, Kwang-Ik;Kim, Mun-Mo
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.4
    • /
    • pp.319-329
    • /
    • 2009
  • Sediment release openings or pipes are installed in the flood control dam constructed to reduce flood damages, which are to allow water and sediments pass through the dam and to prevent flow blockage and sedimentation in the upstream area of the dam. The Hantan River Flood Control Dam (HRFCD) has been projected for flood damage reduction and sediment release openings and ecological passages are considered for the dam design. In this study, sediment deposition due to the construction of HRFCD was analyzed using the HEC-6 model and compared with the state before the dam construction with respect to the conditions of the annual mean daily discharge and annual discharge hydrograph. According to the numerical results, although downstream water levels were changed by the dam structure, the effects of bed changes were not propagated from the dam over 2 km upstream. Also, 2D numerical models of RMA2 and SED2D were used to predict bed changes in the upstream area with and without sediment release openings. Consequently, it is presented that sediment release openings decreased maximum deposition height in the upstream channel of the dam.

Effect of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam

  • Jun, Byoung-Ho;Shin, Hyun-Suk;Yoon, Jae-Young
    • Korean Journal of Hydrosciences
    • /
    • v.5
    • /
    • pp.17-31
    • /
    • 1994
  • Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in the country. The other is the DWOPER(Dynamic Wave Operational Model) package conducted on four different scenarios: (1) before the construction of the Keumkangsan-Dam and the Peace-Dam; (2) the exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam); (3) the exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam) ; (4) the exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the Hwachun-Dam need to be modified.

  • PDF

Influence of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam (화천댐의 홍수량 및 수위에 미치는 평화댐의 영향 분석)

  • 전병호;신현석;이재철;윤용남
    • Water for future
    • /
    • v.26 no.1
    • /
    • pp.93-101
    • /
    • 1993
  • Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in this country. The other is the DWOPER (Dynamic Wave Operational Model) package developed by the U.S. NWS for the hydraulic routing. Flood routing simulations have been performed on four different scenarios:1) Before the construction of the Keumkangsan-Dam and the peace-Dam, 2) The exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam), 3) The exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam), 4) The exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the hwachun-Dam need to be modified.

  • PDF

Flood Routing Using Numerical Analysis Model (수치해석모형에 의한 홍수추적)

  • 이용직;권순국
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.31 no.1
    • /
    • pp.117-130
    • /
    • 1989
  • In this study, an implicit one-dimensional model, DWRM(Dynamic Wave Routing Model) was developed by using the four-point weighted difference method. By applying the developed model to the Keum River, the parameters were calibrated and the model applicability was tested through the comparison between observed and computed water levels. In addition, the effects of the construction of an estuary dam to the flood wave were estimated as a result of the model application. The results of the study can be summarized as follows; 1. The roughness coefficients were evaluated by comparison between observed and computed water level at Jindu, Gyuam and Ganggyeung station in 1985. The Root Mean Squares for water level differences between observed and computed values were 0.10, 0.11, 0. 29m and the differences of peak flood levels were 0.07, 0.02, 0. 07m at each station. Since the evaluated roughness coefficients were within the range of 0.029-0.041 showing the realistic value for the general condition of rivers, it can be concluded that the calibration has been completed. 2. By the application of model using the calibrated roughness coefficients, the R. M. S. for water level differences were 0.16, 0.24, 0. 24m and the differences of peak flood level were 0.17, 0.13,0.08 m at each station. The arrival time of peak flood at each station and the stage-discharge relationship at Gongju station agreed well with the observed values. Therefore, it was concluded that the model could be applied to the Keum River. 3. The model was applied under conditions before and after the construction of the estuary dam. The 50-year frequency flood which had 7, 800m$^3$/sec of peak flood was used as the upstream condition, and the spring tide and the neap tide were used as the downstream condition. As the results of the application, no change of the peak flood level was showed in the upper reaches of 19.2km upstream from the estuary dam. For areas near 9.6km upstream from the estuary dam, the change of the peak flood level under the condition before and after the construction was 0. 2m. However considering the assumptions for the boundary conditions of downstream, the change of peak flood level would be decreased.