• Title/Summary/Keyword: Design-build

Search Result 1,994, Processing Time 0.038 seconds

Case Analysis of Program Outcomes Depending on Teaching Methods in Engineering Design Course (공학설계 교과목에서 교수-학습 방법에 따른 학습성과 분석 사례)

  • Kim, In-sook;Kang, Tae-wook
    • Journal of Engineering Education Research
    • /
    • v.19 no.2
    • /
    • pp.8-13
    • /
    • 2016
  • This paper is concerned with the development case of CEA(Course-Embedded Assessment) design tool for engineering education accreditation operations department for CEA system implemented. Each university or programs are already devoting efforts to build research and CEA system for CEA applied to. In order to effectively apply the CEA studies for each program it is required and particularly, the preferred way to build an operating system is considered a difficult situation of the course unit. Therefore, this case study and to propose a method and procedures required to assessment the design basis for curriculum and program assessment unit in terms of the applicability of CEA, proposes a virtual application results. The information proposed in this case study is determined that could be used in the design for the outcomes and assessment of a variety of programs as one of the steps to build the CEA systems.

Trueness of 3D printed partial denture frameworks: build orientations and support structure density parameters

  • Hussein, Mostafa Omran;Hussein, Lamis Ahmed
    • The Journal of Advanced Prosthodontics
    • /
    • v.14 no.3
    • /
    • pp.150-161
    • /
    • 2022
  • PURPOSE. The purpose of the study was to assess the influence of build orientations and density of support structures on the trueness of the 3D printed removable partial denture (RPD) frameworks. MATERIALS AND METHODS. A maxillary Kennedy class III and mandibular class I casts were 3D scanned and used to design and produce two 3D virtual models of RPD frameworks. Using digital light processing (DLP) 3D printing, 47 RPD frameworks were fabricated at 3 different build orientations (100, 135 and 150-degree angles) and 2 support structure densities. All frameworks were scanned and 3D compared to the original virtual RPD models by metrology software to check 3D deviations quantitatively and qualitatively. The accuracy data were statistically analyzed using one-way ANOVA for build orientation comparison and independent sample t-test for structure density comparison at (α = .05). Points study analysis targeting RPD components and representative color maps were also studied. RESULTS. The build orientation of 135-degree angle of the maxillary frameworks showed the lowest deviation at the clasp arms of tooth 26 of the 135-degree angle group. The mandibular frameworks with 150-degree angle build orientation showed the least deviation at the rest on tooth 44 and the arm of the I-bar clasp of tooth 45. No significant difference was seen between different support structure densities. CONCLUSION. Build orientation had an influence on the accuracy of the frameworks, especially at a 135-degree angle of maxillary design and 150-degree of mandibular design. The difference in the support's density structure revealed no considerable effect on the accuracy.

Improvement Directions for Life Cycle Cost Analysis and Evaluation in the Design-Build and Alternative Bidding Projects (설계.시공일괄입찰공사 및 대안입찰공사의 생애주기비용 분석 및 평가체계 개선방향)

  • Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.97-102
    • /
    • 2008
  • The report of the Korean Board of Audit and Inspection(BAI) on May 2007 indicates the problems of Life Cycle Cost (LCC) analysis and evaluation in the Design-Build(Turn-Key) and alternative bidding system. The point which the report indicates is that the cost estimation system for LCC analysis has nothing in common each other and there's no consistency among the repair cycle and ratio per facilities parts. For solving these problems, BAI demands the establishment of the guidelines for LCC analysis and evaluation from the competent authority Korean Ministry of Construction And Transportation(MOCT). The objective of this study is to develop the improvement directions for LCC analysis and evaluation which are suitable to the public construction projects especially for the Design-Build and alternative bidding system in Korea. For this study, the LCC related raws and regulations, LCC analysis guidelines of public cooperations, actual condition of LCC analysis and evaluation which include, the elements of LCC, the estimation rules of the initial cost and the maintenance cost, the analysis standards of time value of money, etc. are investigated to provide the improvement directions for LCC analysis and evaluation.

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.

Chloride Diffusion Coefficient from NT BUILD 443 (NT BUILD 443에 의한 염소이온 확산계수 고찰)

  • Kim, Ki-Hyun;Cha, Soo-Won;Jang, Sung-Yup
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.295-296
    • /
    • 2009
  • It is often the case with the durability design to use diffusion coefficient obtained from experimental test. From the analytic solution considering the starting time of exposure, it is confirmed that the diffusion coefficient from NT BUILD 443 underestimates real reference value.

  • PDF

3D PLM(Product Life cycle Management) & CPC(Collaborative Product Commerce)

  • Choi, Woo-Suk
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.597-614
    • /
    • 2001
  • Level 0: The Marekting Buzzword : □Confusion between DMU and Visualization □Having a Mobile Data Viewer/Analyser is Anyway a Prerequisite Level 1: Digital Pre-Assembly (DPA): □Building Digital Prototype before Physical Build □Usually a job for Packaging or Prototype Teams □Usually no time Left to take Feed-back into account before Actual Build Level 2: Design in Context: □All Designers within Car Maker do Local DMU before DPA Level 3: Design in Extended Context □Design in Context Expanded to Suppliers(omitted)

  • PDF

THE KEY SUCCESS VEHICLES FOR FAST-TRACK IN PUBLIC DESIGNBUILD PROJECTS

  • Kyu-Man Cho;Kyo-Jin Koo;Chang-Taek Hyun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1094-1099
    • /
    • 2005
  • Nowadays the Design-Build Delivery Method in public sector has been remarkably grown up in applying owing to its merits such as shortening construction duration. The Fast-Track is the wide-using method for accelerating schedule at Design-Build projects. But the public agency is in trouble to execute Fast-Track because of the lack of guideline for its process. As a result, in some cases applying Fast-Track methods, cost and construction duration are increased more than cases of non-Fast-Track projects. In this study, through the questionnaire surveys to professionals having actual implementation experiences as a construction manager, owner or general contractor, key success vehicles of Fast-Track are induced.

  • PDF

A PCM PERFORMANCE EVALUATION SYSTEM FOR DESIGN/BUILD PROJECTS

  • Wen-der Yu ;Yin-shung Hsin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.397-402
    • /
    • 2005
  • Professional Construction Management (PCM) services have become more and more popular in Taiwan in the past decade. However, disputes between PCM consultant and the client on the performance of PCM services are also increasing. The evaluation of PCM performance is a tough task due to the lack of "physical product", such as the drawings finished by the architect. This paper is intended to propose a PCM performance evaluation system (PPES) based on Balanced Scorecard (BSC). A case study of PCM consultancy for a real world design/build project is conducted to demonstrate the applicability of the proposed BSC framework

  • PDF

THE RECENT TREND OF BUILD-UP PRINTED CIRCUIT BOARD TECHNOLOGIES

  • Takagi, Kiyoshi
    • Journal of the Korean institute of surface engineering
    • /
    • v.32 no.3
    • /
    • pp.289-296
    • /
    • 1999
  • The integration of the LSI has been greatly improved and the circuit patters on the LSI are becoming finer line and pitch. The high-density electronic packaging technology is improved. In order to realize the high-density packaging technology, the density of the circuit wiring of the printed circuit boards have also been more dense. The build-up process multilayer printed circuit board technology have a lot of vias, possibilities of the finer conductor wirings and have a freedom of capabilities of wiring design. The build-up process printed circuit boards have the wiring rules which are the pattern width: $100-20\mu\textrm{m}$, the via hole diameter: $100-50\mu\textrm{m}$. There three kinds of build-up processes as far materials and hole drilling. In this paper, the recent technology trends of the build-up printed circuit board technologies are described.

  • PDF

Evaluation of Low Power and High Speed CMOS Current Comparators

  • Rahman, Labonnah Farzana;Reaz, Mamun Bin Ibne;Marufuzzaman, Mohammad;Mashur, Mujahidun Bin;Badal, Md. Torikul Islam
    • Transactions on Electrical and Electronic Materials
    • /
    • v.17 no.6
    • /
    • pp.317-328
    • /
    • 2016
  • Over the past few decades, CMOS current comparators have been used in a wide range of applications, including analogue circuits, MVL (multiple-valued logic) circuits, and various electronic products. A current comparator is generally used in an ADC (analog-to-digital) converter of sensors and similar devices, and several techniques and approaches have been implemented to design the current comparator to improve performance. To this end, this paper presents a bibliographical survey of recently-published research on different current comparator topologies for low-power and high-speed applications. Moreover, several aspects of the CMOS current comparator are discussed regarding the design implementation, parameters, and performance comparison in terms of the power dissipation and operational speed. This review will serve as a comparative study and reference for researchers working on CMOS current comparators in low-power and high-speed applications.