• Title/Summary/Keyword: Direct Load Control

Search Result 289, Processing Time 0.033 seconds

A Configuration of DLC(Direct Load Control) Using Internet Communication and Load Control Method (인터넷을 이용한 DLC(Direct Load Control)의 구성 및 부하제어기법)

  • Lee, Jae-Kyung;Kim, In-Soo;Kim, Hyeong-Jung;Lee, Seoung-Yoon
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.60-64
    • /
    • 2001
  • Recent recovery of the Korean economy drives a rapid increase in utility consumption and requires more stable utility supply and maintenance. However, power location security hardship, reinforcement of international environmental regulation and a huge cost of power plant construction have increased the burden laid on the stable supply. In addition, an efficient and flexible load management is required more than any era since an increment of the rate of increase in cooling load is expected. Therefore, according as the necessity of direct load control for cooling load during the summer in Korea was on the rise, direct load control systems by Internet communication method are constructed at five commercial buildings. Based on practical load control, this study proposes various application modes and communication methods prior to extension diffusion of direct load control hereafter.

  • PDF

An New Load Allocation Algorithms of Direct Load Control (직접부하제어 시스템의 새로운 부하 배분 알고리즘)

  • Kim, Jeong-Uk
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.2
    • /
    • pp.407-410
    • /
    • 2010
  • This paper presents an advanced load allocation algorithm in Direct Load Control(DLC) system. It is important to aggregate a various demand side resource which is surely controllable at the peak power time for a successful DLC system. Previous load allocation algorithm appropriate for DLC system is based on interchanged information, but, this algorithm can not derive optimal solutions. In this paper, we develop the optimal algorithm and the new load allocation algorithm in polynomial time. The simulation results show that the proposed heuristic algorithm for DLC system is very effective.

The Development of Intelligent Direct Load Control System

  • Choi, Sang Yule
    • International journal of advanced smart convergence
    • /
    • v.4 no.2
    • /
    • pp.103-108
    • /
    • 2015
  • The electric utility has the responsibility of reducing the impact of peaks on electricity demand and related costs. Therefore, they have introduced Direct Load Control System (DLCS) to automate the external control of shedding customer load that it controls. Since the number of customer load participating in the DLC program are keep increasing, DLCS operators a re facing difficulty in monitoring and controlling customer load. The existing DLCS needs constant operator intervention, e.g., whenever the load is about to exceed a predefined amount, it needs operator's intervention to control the on/off status of the load. Therefore, DLCS operators need the state-of-the-art DLCS, which can control automatically the on/off status of the customer load without intervention as much as possible. This paper presents an intelligent DLCS using the active database. The proposed DLCS is applying the active database to DLCS which can avoid operator's intervention as much as possible. To demonstrate the validity of the proposed system, variable production rules and intelligent demand controller are presented.

Direct Load Control Algorithm Based Locational and Electric Load Characteristics (지역적 특성과 부하특성을 고려한 직접부하제어 알고리즘)

  • Shin, Ho-Sung;Song, Kyung-Bin;Moon, Jong-Fil;Kim, Jae-Chul;Nam, Bong-Woo
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.264-265
    • /
    • 2006
  • This paper presents direct load control algorithm based locational and electric load characteristics. Direct load control is defined that demand-side management program activities that can interrupt consumer load at the time of annual peak load by direct control of the utility system operator by interruption power supply to individual appliances or equipment on consumer premises. Korean power system is divided into 14-areas considering branches operating in KEPCO, and electric loads are classified into 19 load groups considering interruption costs in this paper. The purpose of proposed method is to decrease social losses by controlling electric loads mainly whose interruption costs are low. It is expected that the proposed algorithm can be used as the countermeasure for the emergency state of the electric power dispatch in a operation point of view.

  • PDF

Design of Direct Load Controller for use of Demand Side (수용가용 직접부하제어장치 설계)

  • Park, J.C.;Kim, H.G.;Jeong, B.H.;Kang, B.H.;Choe, G.H.
    • Proceedings of the KIPE Conference
    • /
    • 2005.07a
    • /
    • pp.149-151
    • /
    • 2005
  • Recently, power supply-demand instability due to the dramatic increase in power usage suchas air-conditioning load at summertime has brought forecasts of decrease in power supply capability. Therefore improving the load factor through systematic load management, in other words, Direct Load Control became necessary. Direct Load Control(DLC) system is kind of a load management program for stabilization of electric power supply-demand. It's purpose is limiting the demand of the demand side selected at peak load or other time periods. The paper presented a Design of Direct Load Controller for control the amount of power demand in demand side. The proposed Controller is cheaper and has ability of storing more power data than pre-existing device.

  • PDF

An Application of Direct Load Control Using Control Logic Based On Load Properties (부하특성별 제어로직을 적용한 직접 부하제어 시스템 활용)

  • Doo, Seog-Bae;Kim, Jeoung-Uk;Kim, Hyeong-Jung;Kim, Hoi-Cheol;Park, Jong-Bae;Shin, Joong-Rin
    • Proceedings of the KIEE Conference
    • /
    • 2004.07d
    • /
    • pp.2668-2670
    • /
    • 2004
  • This paper presents an advanced load control method in Direct Load Control(DLC) system. It is important to aggregate a various demand side resource which is surely controllable at the peak power time for a successful DLC system. Because the DLC system use simple On/Off control that may cause a harmful effect on a plant to reduce a peak power load, there are some restriction on deriving a voluntary participation of demand side resource. So it needs a new approach to direct load control method, and this paper describes an advanced load control method using control logic which is based on load properties. This method is easy to take account of a various characteristic of load, it can be use as a dynamic control logic which is good for adaptive control. The suggested control logic method is verified by modeling a control logic for a turbo refrigerator which affects on peak power in summer season.

  • PDF

Inspection of Status and Problems for Improvement of Direct Load Control Program (직접부하제어 사업의 개선을 위한 실태 및 문제점 도출)

  • Kim, Kyu-Ho;Choi, Seung-Kil;Song, Kyung-Bin
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.553-554
    • /
    • 2007
  • This paper proposes the method to increase the current direct load control program by inspecting the problems of the DLC program. In order to increase the number of the customers participating DLC program, a raise of the base incentive and the direct load control incentive is suggested based on the interruption cost of electric power considering the characteristics of kinds of load.

  • PDF

The Design of Direct Load Control System Using Weather Sensors (기상센서를 이용한 지능형 직접부하제어 시스템 디자인 설계)

  • Choi, Sang Yule
    • Journal of Satellite, Information and Communications
    • /
    • v.10 no.4
    • /
    • pp.113-116
    • /
    • 2015
  • The electric utility has the responsibility of reducing the impact of peaks on electricity demand and related costs. Therefore, they have introduced Direct Load Control System (DLCS) to automate the external control of shedding customer load that it controls. The existing DLCS have been operated only depend on On/Off signal from the electric utility. That kind of DLCS operating has been successfully used until now. But since the number of customer load participating in the DLC program are keep increasing, On/Off signal control from the electric utility is no longer meets the needs of many different kind of customers. Therefore, In this paper, the author suggest the design of direct load control system using weather sensors to meet the diversity of different customer needs.

A Configuration of DLC(Direct Load Control) Using TCP/Ethernet Module And Load Control Method ( I ) (TCP/Ethernet방식을 이용한 DLC(Direct Load Control)의 구성 및 부하제어기법 ( I ))

  • Kim, Hyong-Joong;Kim, In-Soo;Park, Kyu-Hyu;Cha, Yang-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.570-572
    • /
    • 2000
  • In this paper, we present the configuration of Direct Load Control System using TCP/Ethernet Module for the Load Management Europe and America has operated the DLC system by many communication system, and Taiwan, Japan has controlled the cooling load at peak hours of power system. Up to now, Many Researches for the DLC of communication method, so called, pager, power line carrier, ripple control, etc. has advanced. Now, we present new communication method for the DLC using TCP/Ethernet module which is widespread all over the world.

  • PDF

Efficient Promoting Plans of Direct Load Control Programs (직접부하제어 프로그램의 효율적 추진방안)

  • Park, Jong-Jin;Rhee, Chang-Ho;Lee, Keun-Dae
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.292-294
    • /
    • 2002
  • Load management programs was initiated in the 1970s to actively influence customer load in the United States. Generally, load management programs can be categorized into direct load control(DLC), indirect load control(IDLC), and energy storge system(ESS). The DLC allows the utilities to shed remote customer demand unilaterally Direct load control(DLC) has lately attracted considerable attention. This paper suggests efficient promoting plans of DLC, which has a lot of advantages. The importance of DLC will be increased more and more. Therefore, various studies of DLC activation plans have to be continued.

  • PDF