• Title/Summary/Keyword: Distribution Process

Search Result 7,417, Processing Time 0.044 seconds

A Study of Technology Trends for Effective Process Control under Non-Normal Distribution (비정규분포하에서의 효과적 공정관리를 위한 기술체계동향 연구)

  • Kim, Jong-Gurl;Um, Sang-Joon;Kim, Young-Sub;Ko, Jae-Kyu
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.11a
    • /
    • pp.599-610
    • /
    • 2008
  • It is an important and urgent issue to improve process capability in quality control. Process capability refers to the uniformity of the process. The variability in the process is a measure of the uniformity of output. A simple, quantitative way to express process capability, the degree of variability from target in specification is defined by process capability index(PCI). Almost process capability indices are defined under normal distribution. However, these indices can not be applied to the process of non-normal distribution including reliability. We investigate current research on the process of non-normal distribution, and advanced method and technology for developing more reliable and efficient PCI. Finally we suggest the perspective for future study.

  • PDF

The Analysis of the Purchasing Process and Distribution Management Requirements of Teaching Materials in Preschool

  • Jae-Moo LEE;Kyung-Seu CHO
    • Journal of Distribution Science
    • /
    • v.22 no.1
    • /
    • pp.115-125
    • /
    • 2024
  • Purpose: This study is to analyze the purchasing process and distribution management requirements for teaching materials that have important meaning in the practical field of preschool education. Research design, data and methodology: A structured questionnaire was used to survey 103 childcare staffs regarding the purchasing process and distribution managements. The collected data underwent Likert's 5-point scale analysis and keyword grouping. Additionally, ANOVA was conducted to examine the distribution management demands based on demographic characteristics. Results: The purchasing of teaching materials involved more offline channels than online, and the purchase decisions were predominantly made by principals rather than teachers. Although the purchasing process is similar to that of general businesses, there are difficulties in purchasing due to the disorganized distribution channels and limited accessibility to product information. Additionally, the management of inventory for teaching materials is challenging due to limited personnel and storage. Childcare staffs have requirements for classification systems, evaluation criteria, environments and policies related to teaching materials distribution. The need to introduce a teaching material evaluation and certification system to ensure quality was not high. Conclusions: Most of the respondents recognized that strict management and measures should be taken for the distribution of teaching materials. There were differences in the demand of teaching material distribution depending on the respondents' status, age, education, and experience.

The Likelihood for a Two-Dimensional Poisson Exceedance Point Process Model

  • Yun, Seok-Hoon
    • Communications for Statistical Applications and Methods
    • /
    • v.15 no.5
    • /
    • pp.793-798
    • /
    • 2008
  • Extreme value inference deals with fitting the generalized extreme value distribution model and the generalized Pareto distribution model, which are recently combined to give a single model, namely a two-dimensional non-homogeneous Poisson exceedance point process model. In this paper, we extend the two-dimensional non-homogeneous Poisson process model to include non-stationary effect or dependence on covariates and then derive the likelihood for the extended model.

Impact of Climate Change on Business Process in the Distribution Industry

  • Kim, Young-Ei
    • Journal of Distribution Science
    • /
    • v.12 no.12
    • /
    • pp.5-17
    • /
    • 2014
  • Purpose - The purpose of this study is to examine the possible ways to minimize damage by analyzing the influence that may be exerted upon the business process of the distribution industry by unexpected climate change. Research design, data, and methodology - The optimum business process is to be implemented after dividing the diversified business process of the distribution industry into the four stages of the Business Continuity Plan (BCP). Results - First, the upper-level risks that would be impacted most sensitively by climate change have been selected. Second, the impact and characteristics of the environment have been discovered. Third, weighted values by criteria item of upper-level business risks have been analyzed. Fourth, it was possible to define the business priority order based on the individual and then to adjust the Recovery Time Objective (RTO). Conclusion - In this study, the priority order has been defined quantitatively by calculating the priority order score. Further, the priority order has been determined depending on whether any targeted business unit is applicable to the items of the business nature criteria.

Integral constants of Transformed geometric Poisson process

  • Park, Jeong-Hyun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.9 no.2
    • /
    • pp.305-310
    • /
    • 1998
  • In this paper, we introduce the conditions that the P-process has the intensity function which it is a standard form of gamma distribution. And we show that the transformed geometric Poisson process which the intensity function is a standard form of gamma distribution is a alternative sign P-process

  • PDF

Re-engineering Distribution Using Web-based B2B Technology

  • Kim, Gyeung-min
    • Journal of Distribution Research
    • /
    • v.6 no.1
    • /
    • pp.22-35
    • /
    • 2001
  • The focus of Business Process Re-engineering (BPR) has been extended to inter-business process that cuts across independent companies. Combined with Supply Chain Management (SCM), inter-business process reengineering (IBPR) focuses on synchronization of business activities among trading partners to achieve performance improvements in inventory management and cycle time. This paper reviews the business process reengineering movement from the historical perspective and presents a case of inter-business process reengineering using the latest internet-based Business-to- Business (B2B) technology based on Collaborative Planning, Forecasting, and Replenishment (CPFR). The case demonstrates how CPFR technology reengineers the distribution process between Heineken USA and its distributors. As world's first implementor of web-based collaborative planning system, Heineken USA reduces cycle time from determining the customer need to delivery of the need by 50% and increases sales revenue by 10%. B2B commerce on the internet is predicted to grow from $90 billion in 1999 to $2.0 trillion in 2003. This paper provides the management with the bench-marking case on inter-business process reengineering using B2B e-commerce technology.

  • PDF

M/PH/1 QUEUE WITH DETERMINISTIC IMPATIENCE TIME

  • Kim, Jerim;Kim, Jeongsim
    • Communications of the Korean Mathematical Society
    • /
    • v.28 no.2
    • /
    • pp.383-396
    • /
    • 2013
  • We consider an M/PH/1 queue with deterministic impatience time. An exact analytical expression for the stationary distribution of the workload is derived. By modifying the workload process and using Markovian structure of the phase-type distribution for service times, we are able to construct a new Markov process. The stationary distribution of the new Markov process allows us to find the stationary distribution of the workload. By using the stationary distribution of the workload, we obtain performance measures such as the loss probability, the waiting time distribution and the queue size distribution.

A Robust Process Capability Index based on EDF Expected Loss (EDF 기대손실에 기초한 로버스트 공정능력지수)

  • 임태진;송현석
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.1
    • /
    • pp.109-122
    • /
    • 2003
  • This paper presents a robust process capability index(PCI) based on the expected loss derived from the empirical distribution function(EDF). We propose the EDF expected loss in order to develop a PCI that does not depends on the underlying process distribution. The EDF expected loss depends only on the sample data, so the PCI based on it is robust and it does nor require complex calculations. The inverted normal loss function(INLF) is employed in order to overcome the drawback of the quadratic loss which may Increase unboundedly outside the specification limits. A comprehensive simulation study was performed under various process distributions, in order to compare the accuracy and the precision of the proposed PCI with those of the PCI based on the expected loss derived from the normal distribution. The proposed PCI turned out to be more accurate than the normal PCI in most cases, especially when the process distribution has high kurtosis or skewness. It is expected that the proposed PCI can be utilized In real processes where the true distribution family may not be known.

Bootstrap Estimation for the Process Incapability Index $C_{pp}$

  • Han, Jeong-Hye;Cho, Joong-Jae;Lim, Chun-Sung
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 1998.11a
    • /
    • pp.309-315
    • /
    • 1998
  • Process Capability can be expressed with a process index which indicates the incapability of a process to meet its specifications. This index is regarded as a process capability index(PCI) or more precisely as a process incapability index(PII). It is obtained from a simple transformation of a PCI. Greenwich and Jahr-Schaffrath(1995) considered the PII $C_{pp}$ which could be obtained from the transformation to the PCI, $C_{pm}$, and they provided the asymptotic distribution for $C_{pp}$ which was useful unless the process characteristic was normally distributed. However, some statistical inferences based on the asymptotic distribution need a large sample size. There are some processes which process engineers could not help obtaining sufficiently a large sample size. Thus, we have derived its corresponding bootstrap asymptotic distribution since bootstrapping would be a helpful technique for the PII, $C_{pp}$ which was nonparametric or free from assumptions of the distribution of the characteristic X. Moreover, we have constructed six bootstrap confidence intervals used in reducing bias of estimations based on the bootstrap asymptotic distribution and simulated their performances for $C_{pp}$,

  • PDF

Estimate of Current Density Distribution in Electroforming Process Using Finite Element Analysis (유한요소해석을 이용한 전주공정에서의 전류밀도 분포 예측)

  • 강대철;김헌영;전병희
    • Transactions of Materials Processing
    • /
    • v.13 no.3
    • /
    • pp.279-284
    • /
    • 2004
  • Electroforming is the highly specialized use of electrodeposition for the manufacture of metal parts and basically a specialized form of electroplating. So, we can apply electrochemical system analysis for electroforming process. Electrochemical systems are concerned with the interplay between electricity and chemistry, namely the measurements of electrical quantities, such as current density, potential, and charge, and their relationship to chemical parameters. This paper based on the basic equations of electrics and electrochemical kinetics, was employed for a theoretical explanation of the current density distribution on electroforming process. We calculated current density distribution and potential distribution on cathode. Also, calculated current density distribution of vertical direction. It was shown that current density is related with distance of between anode and cathode and mass transfer process.