A Development of Explicit Algorithm for Stress-Erection Analysis of STRARCH System (스트라치 시스템의 긴장응력해석을 위한 명시적 해석법의 개발)

  • Lee, Kyoung-Soo;Han, Sang-Eul
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.5
    • /
    • pp.513-520
    • /
    • 2011
  • In this paper, the advanced explicit algorithm is proposed to simulate the stress-erection process analysis of Strarch system. The Strarch(Stressed-Arch) system is a unique and innovative structural system and member prestress comprising prefabricated plane truss frames which are erected by a post-tensioning stress-erection procedure. The flexible bottom chord which have sleeve and gap detail are closed by the reaction force of prestressing tendon. The prestress imposing to the tendon will make the Strarch system to be erected. This post tensioning process is called as "stress-erection process". During the stress-erection process, the plastic rigid body rotation is occurred to the flexible top chord by the excessive amount of plastic strain, and the structural characteristic becomes to be unstable. In this study, the large deformational beam-column element with plastic hinge is used to model the flexible top chord, and the advanced Dynamic Relaxation method(DRM) are applied to the unstable problem of stress-erection process of Strarch system. Finally, the verification of proposed explicit algorithm is evaluated by analysing the stress-erection of real project of Strarch system.

Prototype of Block Tracing System for Pre-Erection Area using PDA and GPS (PDA 및 GPS를 이용한 옥외 작업장 블록 위치 추적 시스템 개발)

  • Shin, Jong-Gye;Lee, Jang-Hyun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.43 no.1 s.145
    • /
    • pp.87-95
    • /
    • 2006
  • There are hundreds of ship blocks which are under the block assembly, painting, and outfitting assembly works in the pre-erection shops of shipyard. Generally, each block is planned to be processed in a pre-erection shop according to the block type by the long-term production-scheduling before six months. However, many blocks can't be processed in the planned time and the planned shop since the before and after block-processing changes or delays the planned sequential works in pre-erection shops. Therefore, it is essential to monitor the current location of each block and work in process to cope with the changed situation of pre-erection shops. Present study integrates PDA, GPS, and CDMA not only to chase the location of each block but also to exchange the pre-erection work order and the work report between the production-scheduling server and the production managers in the pre-erection shops. This study shows a prototype for the block tracing and process monitoring in the pre-erection shops.

The Erection Method of Starter Segment for Cable Stayed Bridge using Asymmetric System and Cable (케이블과 비대칭 구조를 이용한 사장교 주두부 시공 방법)

  • Cho, Seo-Kyung;Yoon, Tae-Seob;Jeong, Seung-Wook;Lee, Jea-Chan;Eo, Jun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.1031-1038
    • /
    • 2002
  • In this paper the erection method of the Seohae Bridge starter is presented. The erection method of starter for cable stayed bridge was changed from conventional bracket supported erection to heavy lifting supported directly by stays. There was the need to reduce the erection time drastically. The cost saving was obtained as a bonus.

  • PDF

Development of the Pre-erection Block Arrangement System for Deckhouse (선실 PE장 정반배치 계획수립 시스템 개발)

  • Ha, Seung-Jin;Kim, Ji-On;Choi, Tae-Hoon
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2007.09a
    • /
    • pp.79-88
    • /
    • 2007
  • In this study, we improved the layout of deckhouse pre-erection area where erects the blocks and developed the pre-erection block arrangement system for the improvement of productivity and effectiveness. The major operating point of the pre-erection area is to fabricate as many as possible that has restrict area and working plate. The developed system has information management module, scheduling module, schedule control module, statistics module, and information integrate module. The heuristic algorithm is issued and evaluated with real data. And genetic algorithm is used for the evaluation of issued it.

  • PDF

Erection Process Planning & Scheduling using Genetic Algorithm (유전 알고리즘을 이용한 탑재 공정과 일정 계획)

  • J.W. Lee;H.J. Kim
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.32 no.1
    • /
    • pp.9-16
    • /
    • 1995
  • The erection process planning is to decide erection strategy and sequence that satisfies dock duration. The erection scheduling is to decide erection date of each block. The load profile varies according to scheduling and it is related to building cost. It must be possible to simulate the various combinations of process plan and schedule for optimal planning. To develop the process planning system for optimal planning, the system that generate the sequence of erection automatically and the load leveling system are required. This paper suggests the method that generates the erection sequence. The load leveling should be done to all the ships in the same dock batch to get reliable results. In this case since the search space is very large, efficient optimization method is needed Our research achieved the load leveling system using Genetic Algorithm. This system made it possible to simulate various process plans to which schedule is considered.

  • PDF

A Study on Spatial Scheduling in the P.E. Stage (선행 탑재장에서의 공간일정계획에 관안 연구)

  • Koo Chung-kon;Yoon Duck-Young;Bae Tae-Kyu;Cho Min-Ch
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.61-66
    • /
    • 2004
  • In this paper an effort is made to develop an innovative spatial arrangement concept pertaining to ship building industry. The spatial scheduling is the problem that concentrates on effective planning of available space and arrangements of blocks and in a priority manner. In order to create an effective spatial scheduling. a database providing the priority has to be available to make the erection sequence. Such a system works hand in hand with erection sequence generator program The erection sequence program works on the conventional network analysis method which uses a typical parent-children idea for the calculation of the ENT(possible earliest network start time) and LNT(possible latest network start time). This program works in a cyclic manner taking turns by calculating the ENT in upward trace and LNT on the return trace thereby generating the entire erection sequence diagram for the requisite problem The generated database serves as an input data for spatial scheduling problem. When the system works it takes into consideration the entire system based on heuristic concepts as mentioned. There system uses the spatial aspects such as the available area of the P. E area and plan area of the corresponding blocks and its priority of erection from the erection sequence generator program develops the spatial scheduling arrangement. In this paper using all these concepts an innovative spatial schedule development system developed.

  • PDF

The Case Study on the Erection Method of Large Span Structures (대공간 건축물 Erection 공법에 관한 사례 조사 연구)

  • Jung, Hwan-Mok;Lee, Seong-Yeun;Jee, Suck-Won
    • Journal of Korean Association for Spatial Structures
    • /
    • v.7 no.2 s.24
    • /
    • pp.97-104
    • /
    • 2007
  • Recently, the demand of the large span structures has been increasing. The large span structures include such a large scaled structures such as: the shell structure, the space frame structure, the membrane structure and the cable structure, etc. The large span structures are supposed to be confirmed and issued carefully at the initial process of the design besides the construction engineering aspects because of the structural specific cause that should solve and accomodate those large and wide space without columns. In the field of the large span structure construction, the erection construction method has been regarded as a major affected aspects on the construction cost, construction term, and stability. In the field of the large span structure construction, there are various construction method and system could be applied depends on the condition of the construction site and other circumstances such a major construction method as: the element method, the block method, the sliding method, the lift-up method and complexed method, etc. In this study, as the case study of the erection construction method of the large span structures, after survey and study that those existing large span structures construction cases which had applied and adopted the election construction method and analysis and classify into the Uoups by the size, span, ceiling height, structural system in odor to supply and suggest the data for the enhancement and development in the field of the erection construction method as a efficient structural solution of the large span structure construction.

  • PDF

Application of Sensor Technology for the Efficient Positioningand Assembling of Ship Blocks

  • Lee, Sang-Don;Eun, Seong-Bae;Jung, Jai-Jin;Song, Ha-Cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.2 no.3
    • /
    • pp.171-176
    • /
    • 2010
  • This paper proposes the application of sensor technology to assemble ship blocks efficiently. A sensor-based monitoring system is designed and implemented to improve shipbuilding productivity by reducing the labor cost for the adjustment of adequate positioning between ship blocks during pre-erection or erection stage. For the real-time remote monitoring of relative distances between two ship blocks, sensor nodes are applied to measure the distances between corresponding target points on the blocks. Highly precise positioning data can be transferred to a monitoring server via wireless network, and analyzed to support the decision making which needs to determine the next construction process; further adjustment or seam welding between the ship blocks. The developed system is expected to put to practical use, and increase the productivity during ship blocks assembly.

A Study on the Generation of the Production Material Information of a Building Block and the Simulation of the Block Erection (선체 블록의 물량 정보 생성 및 블록 탑재 시뮬레이션에 관한 연구)

  • Lee K.Y.;Roh M.I.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.11 no.2
    • /
    • pp.115-127
    • /
    • 2006
  • At the initial design stage, the generation process of the production material information of a building block and the simulation process of the block erection, which are required to perform the production planning and scheduling, have been manually performed by using 2D drawings, data of parent ships, and design experiences. To make these processes automatic, the accurate generation method of the production material information and the convenient simulation method of the block erection using the 3D CAD model, which was generated from the initial hull structural design system early developed by us, were proposed in this study. For this, a 3D CAD model for a whole hull structure was generated first, and the block division method for dividing the 3D CAD model into several building blocks was proposed. The generation method of the production material information for calculating the weight, center of gravity, painting area, joint length, etc. of a building block was proposed as well. Moreover, the simulation method of the block erection was proposed. Finally, to evaluate the efficiency of the proposed methods for the generation of the production material information and the simulation of the block erection, these methods were applied to corresponding processes of a deadweight 300,000 ton VLCC (Very Large Crude oil Carrier). As a result, it was shown that the production material information of a building block can be accurately generated and the block erection can be conveniently simulated in the initial design stage.

Generation of the Production Material Information of a Building Block and the Simulation of the Block Erection Based on the Initial Hull Structural Model (초기 신체 구조 모델을 기반으로 한 신체 블록의 물량 정보 생성 및 블록 탑재 시물레이션)

  • Roh, Myung-Il;Lee, Kyu-Yeul
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.43 no.1 s.145
    • /
    • pp.103-118
    • /
    • 2006
  • At the initial design stage, the generation process of the production material information of a building block and the simulation process of the block erection, which are required to perform the production planning and scheduling, have been manually performed using 2D drawings, based on the data of parent ships, and subjective intuition from past experience. To make these processes automatic, the accurate generation method of the production material information and the convenient simulation method of the block erection based on the initial hull structural model(3D CAD model), were developed in this study. Here, the initial hull' structural model was generated from the initial hull structural CAD system early developed by us. To evaluate the developed methods. these methods were applied to corresponding processes of a deadweight 300,OOOton VLCC. As a result. it was shown that the production material information of a building block can be accurately generated and the block erection can be conveniently simulated in the initial design stage.