A comparison of the performance characteristics of large 2 MW and 3 MW wind turbines on existing onshore wind farms

  • Bilgili, Mehmet;Ekinci, Firat;Demirdelen, Tugce
    • Wind and Structures
    • /
    • v.32 no.2
    • /
    • pp.81-87
    • /
    • 2021
  • The aim of the current study is to compare the performance of large 2 MW and 3 MW wind turbines operating on existing onshore wind farms using Blade Element Momentum (BEM) theory and Angular Momentum (AM) theory and illustrate the performance characteristic curves of the turbines as a function of wind speed (U∞). To achieve this, the measurement data obtained from two different Wind Energy Power Plants (WEPPs) located in the Hatay region of Turkey was used. Two different horizontal-axis wind turbines with capacities of 2 MW and 3 MW were selected for evaluation and comparison. The hub-height wind speed (UD), turbine power output (P), atmospheric air temperature (Tatm) and turbine rotational speed (Ω) data were used in the evaluation of the turbine performance characteristics. Curves of turbine power output (P), axial flow induction factor (a), turbine rotational speed (Ω), turbine power coefficient (CP), blade tip speed ratio (λ), thrust force coefficient (CT) and thrust force (T) as a function of U∞ were obtained for the 2 MW and 3 MW wind turbines and these characteristic curves were compared. Results revealed that, for the same wind speed conditions, the higher-capacity wind turbine (3 MW) was operating at higher turbine power coefficient rates, while rotating at lower rotational speed ratios than the lower-capacity wind turbine (2 MW).

Reliability Evaluation with Wind Turbine Generators and an Energy Storage System for the Jeju Island Power System (제주도 계통에서의 풍력발전기 및 ESS를 고려한 신뢰도 평가)

  • Oh, Ungjin;Lee, Yeonchan;Lim, Jintaek;Choi, Jaeseok;Yoon, Yongbeum;Chang, Byunghoon;Cho, Sungmin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.1
    • /
    • pp.1-7
    • /
    • 2015
  • This paper proposes probabilistic reliability evaluation model of power system considering Wind Turbine Generator(WTG) integrated with Energy Storage System(ESS). Monte carlo sample state duration simulation method is used for the evaluation. Because the power output from WTG units usually fluctuates randomly, the power cannot be counted on to continuously satisfy the system load. Although the power output at any time is not controllable, the power output can be utilized by ESS. The ESS may make to smooth the fluctuation of the WTG power output. The detail process of power system reliability evaluation considering ESS cooperated WTG is presented using case study of Jeju island power system in the paper.

Critical Characteristics Estimation of a Large-Scale HTS Wind Turbine Generator Using a Performance Evaluation System

  • Kim, Taewon;Woo, Sang-Kyun;Kim, Changhyun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.3
    • /
    • pp.229-233
    • /
    • 2019
  • Large-scale High Temperature Superconducting (HTS) wind power generators suffer from high electromagnetic force and high torque due to their high current density and low rotational speed. Therefore, the torque and Lorentz force of HTS wind power generators should be carefully investigated. In this paper, we proposed a Performance Evaluation System (PES) to physically test the structural stability of HTS coils with high torque before fabricating the generator. The PES is composed of the part of a pole-pair of the HTS generator for estimating the characteristic of the HTS coil. The 10 MW HTS generator and PES were analyzed using a 3D finite element method software. The performance of the HTS coil was evaluated by comparing the magnetic field distributions, the output power, and torque values of the 10 MW HTS generator and the PES. The magnetic flux densities, output power, and torque values of the HTS coils in the PES were the same as a pole-pair of the 10 MW HTS generator. Therefore, the PES-based evaluation method proposed in this paper can be used to estimate the critical characteristics of the HTS generator under high magnetic field and high torque before manufacturing the HTS wind turbines. These results will be used effectively to research and manufacture large-scale HTS wind turbine generators.

Reliability Evaluation of Power system considering Wind Turbine Generators and Multi-Energy Storage System In JeJu Island (풍력발전원과 다개 ESS를 고려한 제주도 계통에서의 신뢰도 평가)

  • Oh, Ungjin;Lim, Jintaek;Lee, Yeonchan;Phuong, Do Nguyen Duy;Choi, Jaeseok;Yoon, Yongbeum;Chang, Byunghoon;Cho, Sungmin
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.473-474
    • /
    • 2015
  • This paper proposes probabilistic reliability evaluation model of power system considering Wind Turbine Generator(WTG) integrated with Energy Storage System(ESS). Monte carlo sample state duration simulation method is used for the evaluation. The power output from WTG units usually fluctuates randomly. Therefore, the power cannot be counted on to continuously satisfy the system load. Although the power output at any time is not controllable, the power output can be utilized when needed if ESS is available. The ESS may make to smooth the fluctuation of the WTG power output. The detail process of power system reliability evaluation considering Multi-ESS cooperated WTG is presented using case study of Jeju island power system in the paper.

  • PDF

Evaluation of Power Performance by Anemometer on WTGS (풍력발전기 너셀에 장착된 풍속계를 이용한 출력성능 평가)

  • Kim, Soo-Sang;Park, Se-Kwang
    • Journal of Sensor Science and Technology
    • /
    • v.21 no.4
    • /
    • pp.303-310
    • /
    • 2012
  • We carried out the power performance evaluation for 1.5 MW${\times}$2 by using anemometer installed on WTGS(Wind Turbine Generator System) in the wind farm at Shi-hwa bang-a-mu-ri. In this paper, we compared and analyzed the performance of guaranteed output and measured output of WTGS which includes output curve, output coefficient, AEP(Annual Energy Product) and availability, etc.. The power performance of WTGS was optimized in the low wind speed sections(3 m/s ~ 10 m/s) and the measured output was more produced by AEP 109 % and availability 112 % than the guaranteed output. In addition, we could also cut the high cost of testing WTGS performance by using anemometer as a substitute for weather mast.

Field Testing and Performance Evaluation of 1.5 kW Darrieus Wind Turbine (1.5 kW 다리우스 풍력터빈 현장 실증 및 성능분석)

  • ALI, SAJID;JANG, CHOON-MAN
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.30 no.6
    • /
    • pp.608-613
    • /
    • 2019
  • The purpose of the present study is to analyze and evaluate the performance of a small Darrieus wind turbine installed at the Urumsil region of Deokjeok-do Island in the west of South Korea 50 km away from Incheon. This place has no government electricity so alternate resources of energy needed to be installed there. For this purpose a small Darrieus wind turbine with the capacity of 1.5 kW was developed and installed at the site. The experimental power output of the wind turbine is less than the designed power at the same values of wind speed. This power loss is mainly due to the highly unsteady nature wind of sudden changes in magnitude of wind speed and wind angle. The results of current study can be used to make a future power generation plan for Deokjeok-do and other nearby small islands.

Fault prediction of wind turbine and Generation benefit evaluation by using the SVM method (SVM방법을 이용한 풍력발전기 고장 예측 및 발전수익 평가)

  • Shin, Jun-Hyun;Lee, Yun-Seong;Kim, Sung-Yul;Kim, Jin-O
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.5
    • /
    • pp.60-67
    • /
    • 2014
  • Wind power is one of the fastest growing renewable energy sources. The blades length and tower height of wind turbine have been growing steadily in the last 10 years in order to increase the output amount of wind power energy. The amount of wind turbine energy is increased by increasing the capacity of wind turbine, but the costs of preventive, corrective and replacement maintenance are also increased accordingly. Recently, Condition Monitoring System that can repair the fault diagnose and repair of wind turbine in the real-time. However, these system have a problem that cannot predict and diagnose of the fault. In this paper, wind turbine predict methodology is proposed by using the SVM method. In the case study, correlation analysis between wind turbine fault and external environmental factors is performed by using the SVM method.

Feasibility Study on Wind Power Forecasting Using MOS Forecasting Result of KMA (기상청 MOS 예측값 적용을 통한 풍력 발전량 예측 타당성 연구)

  • Kim, Kyoung-Bo;Park, Yun-Ho;Park, Jeong-Keun;Ko, Kyung-Nam;Huh, Jong-Chul
    • Journal of the Korean Solar Energy Society
    • /
    • v.30 no.2
    • /
    • pp.46-53
    • /
    • 2010
  • In this paper the feasibility of wind power forecasting from MOS(Model Output Statistics) was evaluated at Gosan area in Jeju during February to Octoberin 2008. The observed wind data from wind turbine was compared with 24 hours and 48 hours forecasting wind data from MOS predicting. Coefficient of determination of measured wind speed from wind turbine and 24 hours forecasting from MOS was around 0.53 and 48 hours was around 0.30. These determination factors were increased to 0.65 from 0.53 and 0.35 from 0.30, respectively, when it comes to the prevailing wind direction($300^{\circ}\sim60^{\circ}$). Wind power forecasting ratio in 24 hours of MOS showed a value of 0.81 within 70% confidence interval and it also showed 0.65 in 80% confidence interval. It is suggested that the additional study of weather conditions be carried out when large error happened in MOS forecasting.

Economic Evaluation of Power Grid Interconnection between Offshore Wind Power Plants (해상풍력발전단지 간의 전력계통 연계에 관한 경제성 분석 연구)

  • Moon, Won-Sik;Jo, Ara;Kim, Jae-Chul
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.4
    • /
    • pp.339-344
    • /
    • 2014
  • An offshore wind power plant (WPP) is very expensive and different from an onshore wind power system in many ways. There has been a continuous increase in the capacity of the offshore WPPs. Therefore it is essential to analyze the feasibility and reliability of the offshore wind power to optimize their redundancy. Besides, it is very important to study a planning for grid interconnection of adjacent offshore WPPs. This paper proposes a economic evaluation method to interconnect with adjacent offshore substations in offshore wind power grid. Also, we suggest the probabilistic reliability method to calculate a probabilistic power output of the wind turbine and a cost of the expected energy not supplied that is used as the reliability index of the power system.