• Title/Summary/Keyword: Expected cost rate per unit time

Search Result 51, Processing Time 0.029 seconds

Preventive maintenance policy following the expiration of replacement-repair warranty (교체-수리보증이 종료된 이후의 예방보전정책)

  • Jung, Ki-Mun
    • Journal of Applied Reliability
    • /
    • v.12 no.2
    • /
    • pp.57-66
    • /
    • 2012
  • In this paper, we consider the periodic preventive maintenance model for a repairable system following the expiration of replacement-repair warranty. Under this preventive maintenance model, we derive the expressions for the expected cycle length, the expected total cost and the expected cost rate per unit time. Also, we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for Weibull distribution case.

Replacement Model Based on Cost and Downtime

  • Jung, Ki-Mun;Han, Sung-Sil;Lim, Jae-Hak
    • Journal of the Korean Data and Information Science Society
    • /
    • v.14 no.4
    • /
    • pp.889-901
    • /
    • 2003
  • In this paper, we consider the optimal replacement policies following the expiration of the combination warranty. The combination warranty can be divided into the renewing combination warranty and the non-renewing combination warranty. The criterion used to determine the optimal replacement period is the overall value function based on the expected cost and the expected downtime. Thus, we obtain the expected cost rate per unit time and the expected downtime per unit time for our model. And then the overall value function suggested by Jiagn and Ji(2002) is applied to obtain the optimal replacement period. The numerical examples are presented for illustrative purpose.

  • PDF

Optimal Periodic Preventive Maintenance with Improvement Factor (개선지수를 고려한 주기적 예방보전의 최적화에 관한 연구)

  • Jae-Hak Lim
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.3
    • /
    • pp.193-204
    • /
    • 2003
  • In this paper, we consider a periodic preventive maintenance(PM) policy in which each PM reduces the hazard rate but remains the pattern of hazard rate unchanged. And the system undergoes only minimal repairs at failures between PM's. The expected cost rate per unit time is obtained. The optimal number N of PM and the optimal period x, which minimize the expected cost rate per unit time are discussed. Explicit solutions for the optimal periodic PM are given for the Weibull distribution case.

Optimal replacement strategy under repair warranty with age-dependent minimal repair cost

  • Jung, K.M.
    • International Journal of Reliability and Applications
    • /
    • v.12 no.2
    • /
    • pp.117-122
    • /
    • 2011
  • In this paper, we suggest the optimal replacement policy following the expiration of repair warranty when the cost of minimal repair depends on the age of system. To do so, we first explain the replacement model under repair warranty. And then the optimal replacement policy following the expiration of repair warranty is discussed from the user's point of view. The criterion used to determine the optimality of the replacement model is the expected cost rate per unit time, which is obtained from the expected cycle length and the expected total cost for our replacement model. The numerical examples are given for illustrative purpose.

  • PDF

주기적 예방보전의 최적정책에 관한 연구

  • Na Myeong Hwan;Son Yeong Suk;Kim Mun Ju
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.115-120
    • /
    • 2005
  • This paper introduces models for preventive maintenance policies and considers periodic preventive maintenance policy with minimal repair when the failure of system occurs. It is assumed that minimal repairs do not change the failure rate of the system. The failure rate under prevention maintenance received an effect by a previously prevention maintenance and the slope of failure rate increases the model where it considered. Also the start point of failure rate under prevention maintenance considers the degradation of system and that it increases quotient, it assumed. Per unit time it bought an expectation cost from under this prevention maintenance policy. We obtain the optimal period time and the number for the periodic preventive maintenance by using Nakagawa's Algorithm, which minimizes the expected cost rate per unit time. Finally, it suppose that the failure time of a system has a Weibull distribution as an example and we obtain an expected cost rate per unit time the optimal period time and the number when cost of replacement and cost of minimal repair change.

  • PDF

Optimal replacement policy following the expiration of payable RRNMW (유료 재생교체-비재생수리보증이 종료된 이후의 최적의 교체정책)

  • Jung, Ki-Mun
    • Journal of Applied Reliability
    • /
    • v.11 no.4
    • /
    • pp.409-417
    • /
    • 2011
  • In this paper, we consider a replacement model following the expiration of warranty. In other words, this paper proposes the optimal replacement policy for a repairable system following the expiration of payable renewing replacement-non-renewing minimal repair warranty. The expected cost rate per unit time from the user's perspective is used to determine the optimality of the replacement policy. Thus, we derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purpose.

Replacement Model after Extended Two-phase Warranty (연장된 이단계 보증 이후의 교체모형)

  • Jung, Ki Mun
    • Journal of Integrative Natural Science
    • /
    • v.14 no.4
    • /
    • pp.197-204
    • /
    • 2021
  • Under the two-phase warranty, the warranty period is divided into two intervals, one of which is for renewing replacement warranty, and the other is for minimal repair warranty. Jung[13] discusses the two types of extended two-phase warranty models. In this paper, we suggest the replacement model after the extended two-phase warranty that has been proposed by Jung[13]. To determine the optimal replacement policy, we adopt the expected cost rate per unit time. So, the expressions for the total expected cost, the expected length of the cycle and the expected cost rate per unit time from the user's point of view are derived. Also, we discuss the optimal replacement policy and the uniqueness of the solution for the optimization. Furthermore, the numerical examples are provided to illustrate the proposed the replacement model.

Preventive Maintenance Policy Following the Expiration of Extended Warranty Under Replacement-Repair Warranty (교체-수리보증 하에서 연장된 보증이 종료된 이후의 예방보전정책)

  • Jung, Ki Mun
    • Journal of Applied Reliability
    • /
    • v.14 no.2
    • /
    • pp.122-128
    • /
    • 2014
  • In this paper, we consider the periodic preventive maintenance model for a repairable system following the expiration of extended warranty under replacement-repair warranty. Under the replacement-repair warranty, the failed system is replaced or minimally repaired by the manufacturer at no cost to the user. Also, under extended warranty, the failed system is minimally repaired by the manufacturer at no cost to the user during the original extended warranty period. As a criterion of the optimality, we utilize the expected cost rate per unit time during the life cycle from the user's perspective. And then we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for Weibull distribution case.

Optimal Periodic Preventive Maintenance Schedule When Preventive Maintenance is Imperfect (예방보전이 불완전할 때 최적 주기적 예방보전 계획)

  • Kim, Dae-Kyung;Shin, Sang-Wook;Lim, Jae-Hak
    • Journal of Korean Society for Quality Management
    • /
    • v.35 no.4
    • /
    • pp.140-146
    • /
    • 2007
  • In this paper, we consider a periodic imperfect preventive maintenance(PM) policy in which the system's failure rate after each PM remains unchanged. The system undergoes only minimal repairs at failures between PMs. Exact mathematical formula of the expected cost rate per unit time is derived. Optimal number of PMs and optimal maintenance period are derived by minimizing the expected cost rate per unit time. A numerical example is provided to illustrate the proposed approach under Weibull lifetime distribution.

Preventive maintenance model with extended warranty (연장된 보증을 갖는 예방보전모형)

  • Jung, Ki Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.24 no.4
    • /
    • pp.773-781
    • /
    • 2013
  • Recently, an extended warranty of the system following the expiration of the basic warranty is becoming increasingly popular to the user. In this respect, we suggest a preventive maintenance model following the expiration of extended warranty with minimal repair warranty from the user's point of view in this paper. Under basic warranty and extended warranty, the failed system is minimally repaired by the manufacturer at no cost to the user. For the preventive maintenance model, we derive the expressions for the expected cycle length, the expected total cost and the expected cost rate per unit time. Also, we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the numerical examples are presented to illustrate the purpose when the failure time of the system has a Weibull distribution.