Evaluation of flood control capacity of agricultural reservoirs during flood season (홍수기 농업용 저수지의 홍수조절용량의 평가)

  • Jang, Ik Geun;Lee, Jae Yong;Lee, Jeong Beom;Kim, Jin Soo
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.56 no.4
    • /
    • pp.69-75
    • /
    • 2014
  • We investigated flood control capacity of 484 agricultural reservoirs with storage capacity of over 1 million $m^3$ in South Korea. In general, agricultural reservoir secures flood control capacity by setting up limited water level during flood season from late June to mid-September. The flood control capacity of an agricultural reservoir during flood season can be divided into stable flood control capacity during non-flood season, stable flood control capacity associated with limited water level, and unstable flood control capacity associated with limited water level. In general, the flood control capacity significantly (P < 0.001) increased with reservoir capacity irrespective of type of spillway. The unstable flood control capacity accounted for about 20 % of reservoir capacity in the uncontrolled reservoirs. The study reservoirs showed flood control capacity of 0.60-65 billion (B) $m^3$ and stable flood control capacity of 0.43-47 B $m^3$, depending on the upper and lower limited water levels during the flood season. The stable flood control capacity of the gated reservoirs (0.29-0.33 B $m^3$) was about two times than that of reservoirs with uncontrolled spillways (0.14 B $m^3$). The ratios of stable flood control capacity to reservoir capacity for agricultural reservoirs range from 21 to 23 %, similar to that for Daecheong multipurpose dam. Moreover, the reservoirs with over 100 mm ratio of flood control capacity to watershed area accounted for 38 % of total gated reservoirs. The results indicate that many agricultural reservoirs may contribute to controlling flood in the small watersheds during the flood season.

Reservoir Operation at Flood Time by Transformed Reservoir Flood(TRF) Reservoir Operation Method(ROM) (저수지 홍수변환법에 의한 홍수시 저수지 운영)

  • Gwon, O-Ik;Sim, Myeong-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.1
    • /
    • pp.105-113
    • /
    • 1998
  • Reservoir operation during flood period can be divided into two parts: One is for an operating policy during flood period to consider water conservation and flood control, and the other is for flood time on a random water level at flood forecasting, This study is concerned with reservoir operation and discusses general reservoir operation at flood time. Flood control has problems such as the uncertainty of hydrologic models. technical limitations and some constraints. Therefore, we may prepare the quantitative flood control methods based on the assured flood control storage for reservoir operation. Transformed Reservoir Flood(TRF) Reservoir Operation Method(ROM) is a procedure which determines the adequate releases with considering dam safety for flood inflows over non-damaging discharge. Based on the TRF ROM which was explained in our published paper. the study discusses the TRF ROM with additional investigations and the general reservoir operation rules at flood time.

  • PDF

Improvement for Reservoir Operation Module of Flood Forecasting-Warning Systems in Han River (한강 홍수예경보시스템의 저수지 운영모듈 개선)

  • Kwon, Oh-Ig;Kim, Sung;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.6
    • /
    • pp.685-695
    • /
    • 1999
  • On the premise of flood control procedure, flood forecasting-warning, system(FFWS) is one of actions for disaster prevention. It makes public announcements for flood situations timely in order to mitigate damage from floodings. Multi-purpose dam which has flood control storage plays an important role in river basin at flood time. In FFWS, it is reservoir operation module that is related to reservoir operation of multi-purpose dam. This study considers the current conditions and problems in reservoir operation module of FFWS in Han River and improves reservoir operation module under limited research scope. As results, additional reservoir operation modules such as Technical ROM(Reservoir Operation Method) and ARD(Approved Release Discharge) ROM were built in FFWS. Using these newly built reservoir operation modules. Han River Flood Control Office will plan and work for flood control and flood forecasting. Firstly, it may plan for flood control by Technical ROM which is deterministic simulation model, and work for final flood control and flood forecasting by ARD ROM according to approved release discharge afterward.

  • PDF

Affecting Water Supply Capacity Followed by Allocating Flood Control Volume in Heightening Reservoir (홍수조절용량 설정에 따른 증고저수지의 용수공급능력 변화)

  • Noh, Jae-Kyoung
    • KCID journal
    • /
    • v.17 no.2
    • /
    • pp.57-70
    • /
    • 2010
  • This study was performed to analyze the affect of water supply capacity followed by allocating flood control volume in heightening reservoir, of which Baekgog reservoir was selected as a case study in here. Baekgog reservoir is located in Jincheon county, Chungbuk province, of which full water level will be heightened from EL. 100. 1m to EL. 102.1m, and total storage from 21.75M $m^3$ to 26.67M $m^3$. Flood inflow with 200year frequency was estimated to 997 $m^3$/s in peak flow and 22.54M $m^3$ in total volume. Reservoir flood routing was conducted to determine flood limited water levels, which was determined to have scenarios such as EL 97-98-99m in periods of 6.21.-7.20., 7.21.-8.20., and 8.21.-9.20., respectively, EL 97-97-97m, EL 98-98-98m in present reservoir, and EL 99-100-101m, EL 99-99-99m, and EL 100-100-100m in heightened reservoir. Reservoir inflow was simulated by DAWAST model. Annual paddy irrigation requirement was estimated to 33.19M $m^3$ to 2,975ha. Instream flow was allocated to 0.14mm/d from October to April. Operation rule curve was drawn using inflow, irrigation and instream flow requirements data. In case of withdrawal limit reservoir operation using operation rule curve, reduction rates of annual irrigation supply before and after flood control by reservoir were 2.0~4.3% in present size and 1.5~3.6% in heightened size. Reliability on water supply was decreased from 77.3% to 63.6~68.2% in present size and from 81.6% to 72.7~79.5% in heightened size. And reduction rates of water storage at the end of year before and after flood control by reservoir were 7.3~16.5% in present size and 7.7~16.9% in heightened size. But water supplies were done without any water deficiency through withdrawal limit reservoir operation in spite of low flood regulating water level.

  • PDF

Determination of Flood-limited Water Levels of Agricultural Reservoirs Considering Irrigation and Flood Control (농업용 저수지의 이·치수 기능을 고려한 홍수기 제한수위 설정 기법 개발)

  • Kim, Jihye;Kwak, Jihye;Jun, Sang Min;Lee, Sunghack;Kang, Moon Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.65 no.6
    • /
    • pp.23-35
    • /
    • 2023
  • In this study, we developed a method to determine the flood-limited water levels of agricultural reservoirs, considering both their irrigation and flood control functions. Irrigation safety and flood safety indices were defined to be applied to various reservoirs, allowing for a comprehensive assessment of the irrigation and flood control properties. Seasonal flood-limited water level scenarios were established to represent the temporal characteristics of rainfall and agricultural water supply and the safety indices were analyzed according to these scenarios. The optimal scenarios were derived using a schematic solution based on Pareto front analysis. The method was applied to Obong, Yedang, and Myogok reservoirs, and the results showed that the characteristics of each reservoir were well represented in the safety indices. The irrigation safety of Obong reservoir was found to be significantly influenced by the late-stage flood-limited water level, while those of Yedang and Myogok reservoir were primarily affected by the early and mid-stage flood-limited water levels. The values of irrigation safety and flood safety indices for each scenario were plotted as points on the coordinate plane, and the optimal flood-limited water levels were selected from the Pareto front. The storage ratio of the optimal flood-limited water levels for the early, mid, and late stages were 65-70%, 70%, and 75% for Obong reservoir, 75%, 70-75%, and 65-70% for Yedang reservoir, and 75-80%, 70%, and 50% for Myogok reservoir. We expect that the method developed in this study will facilitate efficient reservoir operations.

Optimal Flood Control Volume in the Irrigation Reservoir (관개저수지의 적정 홍수조절용량 설정방법)

  • 김태철;문종필;민진우;이훈구
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.2
    • /
    • pp.81-91
    • /
    • 1998
  • Water level of irrigation reservoir during the flood season could be kept to a certain level, so called, flood control level by releasing the flood inflow in advance in order to reduce the peak discharge of next coming flood and the damage of inundation. Concept of restriction intensity of water supply was introduced to evaluate the influence of flood control volume on the irrigation water supply. Restriction intensity can be calculated by multiplying the ratio of restriction to the days of restriction which are obtained from the operation rule curve and daily water level of irrigation reservoir and it has the dimension of % day. The method of restriction intensity was applied to the Yedang irrigation reservoir with the observed data of 30 years to review whether the present flood control volume is reasonable or not, and suggest the optimal flood control volume, if possible.

  • PDF

A Study on Releases Determination Scheme for a Forecasted Flood (예측홍수의 방류량 결정방안에 관한 연구)

  • Kwon, Oh-Ig;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.3
    • /
    • pp.257-268
    • /
    • 1997
  • Reservoir operators and managers need to present a rational basis of determining releases for a flood event. This study divides a forecasted flood hydrograph by two parts on the basis of non-damaging discharge, which consists of one part con,trolled by non-damaging discharge and another controlled by using flood control storage of the reservoir. In case of using flood control storage, a new reservoir operation method. called TRF (Transformed Reservoir Flood) ROM, is suggested for the operating rules during a flood to consider the reservoir security as well as the operational efficiency. This paper presents an application of the methodology to the operation of a single multipurpose reservoir at the Taechong Dam during flood and the results analyzed.alyzed.

  • PDF

Analysis of Flood Control Effects of Heightening of Agricultural Reservoir Dam (농업용 저수지 증고에 따른 홍수조절효과 분석)

  • Lee, Gwan Jae;Park, Ki Wook;Jung, Young Hun;Jung, In Kyun;Jung, Kwang Wook;Jeon, Ji Hong;Lee, Ji Min;Lim, Kyoung Jae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.4
    • /
    • pp.83-93
    • /
    • 2013
  • Annual average precipitation of Korea is 1,277 mm and around 2/3 of annual precipitation and 74 % of available water resources occurred during monsoon period. In recent years, many agricultural reservoirs have been heightened to increase flood control capacity, reduce flooding damage at downstream areas, and provide sustainable environmental flow during drought period. Thus in this study, the flood control effects of heightening of reservoir banks were simulated with HEC-ResSim and HEC-RAS models. These modes were applied to Bonghak reservoir and it was found that flood control effects were 3~4.5 % with 7 -m heightening. Also, with proper operation (1 m lower of full water level) of reservoir right before the monsoon period, flooding at downstream could be prevented even with design storm of 80 -year recurrence interval. As shown in this study, heightening of agricultural reservoir provides positive effects in flood control and flood damage reduction.

Analysis of Small reservoir system by Flood control ability augmentation (치수능력 증대에 따른 저수지시스템 분석)

  • Park Ki-Bum;Lee Soon-Tak
    • Journal of Environmental Science International
    • /
    • v.14 no.11
    • /
    • pp.995-1004
    • /
    • 2005
  • As a research establish reservoir safety operation for small dam systems. This study presents hydrologic analysis conducted in the Duckdong and Bomun dam watershed based on various rainfall data and increase inflow. Especially the Duckdong dam without flood control feature are widely exposed to the risk of flooding, thus it is constructed emergency gate at present. In this study reservoir routing program was simulation for basin runoff estimating using HEC-HMS model, the model simulation the reservoir condition of emergency Sate with and without. At the reservoir analysis results is the Duckdong dam average storage decrease $20\%$ with emergency gate than without emergency gate. Also, the Bomun dam is not affected by the Duckdong flood control augmentation.

Optimal Reservoir Operation Using Goal Programming for Flood Season (Goal Programming을 이용한 홍수기 저수지 최적 운영)

  • Kim, Hye-Jin;Ahn, Jae-Hwang;Choi, Chang-Won;Yi, Jae-Eung
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.11 no.2
    • /
    • pp.147-156
    • /
    • 2011
  • The purpose of multipurpose reservoir operation in flood season is to reduce the peak flood at a control point by utilizing flood control storage or to minimize flood damage by controlling release and release time. Therefore, the most important thing in reservoir operation for flood season is to determine the optimal release and release time. In this study, goal programming is used for the optimal reservoir operation in flood season. The goal programming minimizes a sum of deviation from the target value using linear programming or nonlinear programming to obtain the optimal alternative for the problem with more than two objectives. To analyze the applicability of goal programming, the historical storm data are utilized. The goal programming is applied to the reservoir system operation as well as single reservoir operation. Chungju reservoir is selected for single reservoir operation and Andong and Imha reservoirs are selected for reservoir system operation. The result of goal programming is compared with that of HEC-5. As a result, it was found that goal programming could maintain the reservoir level within flood control level at the end of a flood season and also maintain flood discharge within a design flood at a control point for each time step. The goal programming operation is different from the real operation in the sense that all inflows are assumed to be given in advance. However, flood at a control point can be reduced by calculating the optimal release and optimal release time using suitable constraints and flood forecasting system.