• Title/Summary/Keyword: Forecasting system

Search Result 1,534, Processing Time 0.032 seconds

Design of a Demand Forecasting System for Planning Production of Consumer Products (다품종(多品種) 소비자(消費者) 제품(製品)의 생산관리(生産管理)를 위(爲)한 수요예측모형(需要豫測模型))

  • Park, Jin-U
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.12 no.1
    • /
    • pp.55-61
    • /
    • 1986
  • Mathematical forecasting models and a practical computer based forecasting system are developed for planning production in a manufacturing and distribution network. The forecasting system works at the highest level of a hierarchical computer-based decision support system consisting of the forecasting system, an aggregate planning system and a shop floor scheduling system. The dynamics of business operations for an actual company have been considered to make this study a unique comprehensive analysis of a real world forecasting problem.

  • PDF

A Basic Study on the Flood-Flow Forecasting System Model with Integrated Optimal Operation of Multipurpose Dams (댐저수지군의 최적연계운영을 고려한 유출예측시스템모형 구축을 위한 기초적 연구)

  • 안승섭
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.37 no.3_4
    • /
    • pp.48-60
    • /
    • 1995
  • A flood - flow forecasting system model of river basins has been developed in this study. The system model consists of the data management system(the observation and telemetering system, the rainfall forecasting and data-bank system), the flood runoff simulation system, the reservoir operation simulation system, the flood forecasting simulation system, the flood warning system and the user's menu system. The Multivariate Rainfall Forecasting model, Meteorological factor regression model and Zone expected rainfall model for rainfall forecasting and the Streamflow synthesis and reservoir regulation(SSARR) model for flood runoff simulation have been adopted for the development of a new system model for flood - flow forecasting. These models are calibrated to determine the optimal parameters on the basis of observed rainfall, 7 streamfiow and other hydrological data during the past flood periods.

  • PDF

The Development of Short-term Load Forecasting System Using Ordinary Database (범용 Database를 이용한 단기전력수요예측 시스템 개발)

  • Kim Byoung Su;Ha Seong Kwan;Song Kyung Bin;Park Jeong Do
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.683-685
    • /
    • 2004
  • This paper introduces a basic design for the short-term load forecasting system using a commercial data base. The proposed system uses a hybrid load forecasting method using fuzzy linear regression for forecasting of weekends and Monday and general exponential smoothing for forecasting of weekdays. The temperature sensitive is used to improve the accuracy of the load forecasting during the summer season. MS-SQL Sever has been used a commercial data base for the proposed system and the database is operated by ADO(ActiveX Data Objects) and RDO(Remote Data Object). Database has been constructed by altering the historical load data for the past 38 years. The weather iDormation is included in the database. The developed short-term load forecasting system is developed as a user friendly system based on GUI(Graphical User interface) using MFC(Microsoft Foundation Class). Test results show that the developed system efficiently performs short-term load forecasting.

  • PDF

Agent Oriented Business Forecasting

  • Shen, Zhiqi;Gay, Robert
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2001.01a
    • /
    • pp.156-163
    • /
    • 2001
  • Business forecasting is vital to the success of business. There has been an increasing demand for building business forecasting software system to assist human being to do forecasting. However, the uncertain and complex nature makes is a challenging work to analyze, design and implement software solutions for business forecasting. Traditional forecasting systems in which their models are trained based on small collection of historical data could not meet such challenges at the information explosion over the Internet. This paper presents an agent oriented business forecasting approach for building intelligent business forecasting software systems with high reusability. Although agents have been applied successfully to many application domains. little work has been reported to use the emerging agent oriented technology of this paper is that it explores how agent can be used to help human to manage various business forecasting processes in the whole business forecasting life cycle.

  • PDF

The 24 Hourly Load Forecasting of the Election Day Using the Load Variation Rate (부하변동율을 이용한 선거일의 24시간 수요예측)

  • Song, Kyung-Bin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.6
    • /
    • pp.1041-1045
    • /
    • 2010
  • Short-term electric load forecasting of power systems is essential for the power system stability and the efficient power system operation. An accurate load forecasting scheme improves the power system security and saves some economic losses in power system operations. Due to scarcity of the historical same type of holiday load data, most big electric load forecasting errors occur on load forecasting for the holidays. The fuzzy linear regression model has showed good accuracy for the load forecasting of the holidays. However, it is not good enough to forecast the load of the election day. The concept of the load variation rate for the load forecasting of the election day is introduced. The proposed algorithm shows its good accuracy in that the average percentage error for the short-term 24 hourly loads forecasting of the election days is 2.27%. The accuracy of the proposed 24 hourly loads forecasting of the election days is compared with the fuzzy linear regression method. The proposed method gives much better forecasting accuracy with overall average error of 2.27%, which improved about average error of 2% as compared to the fuzzy linear regression method.

A Study of Measuring Forecasting Accuracy Under Rromotion System (인위적인 수요창출 하에서 서비스부품의 수요예측의 정확도)

  • Rhee, Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.10-21
    • /
    • 2010
  • Promotion system can be used as strategical management weapon to enhance the sales power. Planned order system has some similarities with promotion system to create purchasing power and to supply the service parts with low price on purpose. The only difference is whether it is prearranged event or not. The effectiveness of forecasting has increased with normal state of ordering process. However, the accuracy of forecasting has diminished with irregular state of ordering, such as demand occurrences by unexpected climate change or intended planned order by the company. A planned order system is examined through the process of computing the effectiveness on the basis of forecasting in this paper. And it is suggested that how to increase the accuracy of forecasting capability under the planned order system.

Development of a Weekly Load Forecasting Expert System (주간수요예측 전문가 시스템 개발)

  • Hwang, Kap-Ju;Kim, Kwang-Ho;Kim, Sung-Hak
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.4
    • /
    • pp.365-370
    • /
    • 1999
  • This paper describes the Weekly Load Forecasting Expert System(Named WLoFy) which was developed and implemented for Korea Electric Power Corporation(KEPCO). WLoFy was designed to provide user oriented features with a graphical user interface to improve the user interaction. The various forecasting models such as exponential smoothing, multiple regression, artificial nerual networks, rult-based model, and relative coefficient model also have been included in WLofy to increase the forecasting accuracy. The simulation based on historical data shows that the weekly forecasting results form WLoFy is an improvement when compared to the results from the conventional methods. Especially the forecasting accuracy on special days has been improved remakably.

  • PDF

A Study on the Development of Water Quality Forecasting System in Upstream of Paldangdam (팔당댐 상류의 수질예보시스템 개발에 관한 연구)

  • Choi, Nam-Jeong;Seo, Il-Won;Kim, Young-Han;Lee, Myong-Eun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.1387-1391
    • /
    • 2007
  • In this study, water quality prediction that is necessary to water quality forecasting system is performed using 2-D river analysis models RMA-2 and RAM4. RAM4 is suitable to water quality forecasting system cause it is possible to put in the pollutants as a mass type boundary condition. Instant injections of pollutants at Yongdamdaegyo Bridge in Namhangang River are simulated and the behavior of pollutant cloud is observed. The effects of water quality accident to Paldang 2 water intake plants in Paldangho Lake is analyzed with time variation. And extra flow simulation is performed for mitigation of pollution. Several cases of water quality forecasting system at home and abroad are investigated and the direction of water quality forecasting system is presented.

  • PDF

Renewable Power Generation Forecasting Method for Distribution System: A Review (배전시스템 운영계획을 위한 신재생에너지원 발전량 예측 방법)

  • Cho, Jintae;Kim, Hongjoo;Ryu, Hosung;Cho, Youngpyo
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.1
    • /
    • pp.21-29
    • /
    • 2022
  • Power generated from renewable energy has continuously increased recently. As the distributed generation begins to interconnect in the distribution system, an accurate generation forecasting has become important in efficient distribution planning. This paper explained method and current state of distributed power generation forecasting models. This paper presented selecting input and output variables for the forecasting model. In addition, this paper analyzed input variables and forecasting models that can use as mid-to long-term distributed power generation forecasting.

A Quality Forecasting System in Glass Melting Processes using Genetic Algorithms (유전 알고리즘을 이용한 유리 용해 공정에서의 불량예측 시스템)

  • Jung, Ho-Sang;Jeong, Bong-Ju
    • IE interfaces
    • /
    • v.13 no.1
    • /
    • pp.78-91
    • /
    • 2000
  • This paper presents a computerized quality forecasting system for glass manufacturing. In forecasting the molten glass quality, we are concerned with three major issues : (1) to find the reasonable time lags between a set of process conditions and the quality measurement of glass products, (2) to find the most significant process variables affecting the quality, and (3) to construct the appropriate causal forecasting models using genetic algorithms. The experimental results show the proposed model results in better forecasting than linear regression model. The suggested forecasting model was implemented successfully and is being currently used in a real manufacturing line.

  • PDF