• Title/Summary/Keyword: Form Work

Search Result 2,602, Processing Time 0.038 seconds

Requirement Analysis for Development of SMART Beam Form (SMART 보 거푸집 개발을 위한 요구조건 분석)

  • Kim, Taekoo;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.70-71
    • /
    • 2014
  • The structural work is the main process of building construction which influence on the time, cost, safety and quality. The form work is one of the main process which has from 20 to 30 percentage of structural work. Especially the form work for beams is complex and need more manpower compared with form work for column or slab. When the existing forms such as plywood form, steel framed wooden form and aluminum form, is used for form work of beam, it would result in the cost overrun caused by needs of lots of manpower and resources. Therefore, the aim of this study is analysis of the requirement for development of SMART beam form. The result of this study shall be used for the development of SMART form work system.

  • PDF

Work Time of Basement Composite Wall Form Assembly by Work Time Analysis (작업분석을 통한 합벽거푸집 구성 요소별 작업소요시간에 관한 연구)

  • Heo, Kyoung-Moo;Kim, Myoung-Hyun;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.9-13
    • /
    • 2009
  • Recently, construction in downtown is often done closely at the adjacent building. In this case, underground construction need to Basement Composite Wall(BCW) construction. However, generally, during the construction process of BCW form works have many problems that are narrow working space and inefficient time consuming. Despite of these problems, there was no quantitative research for the work time of BCM assembly. Therefore, in this study, work time of CBW form assembly in underground construction is identified by the work analysis. The results of this study reveal that buttress work of basement form take lots of time in the entire work process of Basement Composite Wall form assembly.

  • PDF

A Study of Construction Methods for Quality and Productivity Enhancement of Form Works in the Bearing Wall Systems (벽식구조 거푸집공사의 품질 및 생산성향상을 위한 공법개선 연구)

  • Lee Jung-Ho;Joo Jin-Kyu;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.523-526
    • /
    • 2002
  • In the bearing wall systems, a form work has a lot of room that saves cost because it takes a substantial proportion of construction cost. Therefore the systemic and efficient methods are required in the form work. This study focuses on methods that enhance the quality and the productivity of form work and presents the kicker form as an alternative plan to simplify the form work through being modular and automatical it. Work sampling method is used for productivity measurement. It is expected that it will reduce the work process and improve the Qualify and the podructivity of construction.

  • PDF

A Study on the Productivity of Form Work by using Work Analysis Method (작업측정기법을 이용한 거푸집 공사의 생산성에 관한 연구)

  • Jung, Hea-kyang;Yun, Yer-Wan;Yang, Keek-young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.131-137
    • /
    • 2005
  • Lately Construction industry has been depressing by hard construction market circumstance. Construction company, especial at this time, makes more rationalize the management of inside Company and Construction field. In this study we are to present the method of calculation reasonable duration at Reinforced Concrete Work. For the study first make up a question at field workers, then sampling the Form workers based the question. Second, We are using Work Analysis Method analysing the worker's work-method and Time. And then using the result of analysis, measure the Productivity of Form work. The productivity of Form work is used the basic data of duration at Reinforced Concrete Work

A Study on the Measure of Productivity of Form Work (거푸집 공사의 생산성 측정에 관한 연구)

  • Jung Hea-kyang;Yun Yer-Wan;Yang Keek-young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.149-155
    • /
    • 2005
  • Lately Construction industry depressed by hard construction market condition. So Construction company, especial at this time, make more rationalize the management of inside Company and Construction field. So in this study we are to present the method of calculation reasonable duration at Reinforced Concrete Work. For the study first make up a question at field workers, then sampling the Form workers based the question. Second, We are using Work Analysis Method analysing the worker's work-method and Time. And then using the result of analysis, measure the Productivity of Form work. The productivity of Form work is used the basic data of duration at Reinforced Concrete Work

  • PDF

An experimental study on adhesion of concrete form release agent (콘크리트 거푸집 박리제의 부착력에 대한 실험적 연구)

  • Seo, Hyun-Jae;Park, Jong-Pil;Nam, Sun-Hwa;Gong, Min-Ho;Sng, Jae-Young;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.77-78
    • /
    • 2018
  • Form-work is a must for construction work. In order to secure the best condition of the form surface and to increase the number of times, the form releasing agent is applied during the process of the form-work. The base oil of the form release agent which has been used already uses the oil which directly or indirectly affects the natural environment and the concrete. In this study, the basic study on the form release agent for concrete was carried out only for the effect of adhesion. The adhesive force of the tile is measured by the mortar to determine the change of the releasing agent and the adhesive strength.

  • PDF

Evaluation of Structural Behaviour of High Performance Permanent Form with Stainless Steel Fiber

  • Sim Jong Sung;Oh Hong Seob;Ju Min Kwan;Shih Hyun Yang;Han Jeong Jin;Sohn Yushin
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.05a
    • /
    • pp.499-502
    • /
    • 2005
  • Nowadays, the stripping work of form has generated some problems such as increasing total constructing cost result from delayed work schedule by the stripping work of form and environmental issues by wasting the debonded form. According to recent research for form work, it has studied about permanent form to solve economic and environmental problem which is commented above. In this study, high performance permanent form method was developed and tested by adopting COM and TEN specimens adopted on the Compression and Tensile section then the structural behaviour was investigated. In the test result, the specimen adopted the form showed better structural performance than control specimen in the point of ductility, failure mode and ultimate load.

  • PDF

Benefit/Cost Analysis of Form Work Methods for Composite Basement Wall in Building Constructions (건축물의 합성 지하옹벽 거푸집에 대한 편익·비용 분석 연구)

  • Kim, Jae Yeob;Kim, Gwang-Hee;Ahn, Sung-Hoon;Lee, Ji-Young
    • KIEAE Journal
    • /
    • v.8 no.1
    • /
    • pp.99-104
    • /
    • 2008
  • This study surveys the types of form works used for constructing composite basement walls found in domestic construction sites. Based on expert surveys, the research provides criteria for selecting a form work type and cost-benefit analysis for different types of form works. In selecting a form work type, safety was considered the most important factor. It is induced from the survey that a successful construction requires a form work type that could solidly bear the lateral pressure of concrete rather than other types that cut back the cost and shorten the construction period. In the cost-benefit analysis, the benefit was the highest in 'euro-form+soldier system', and the cost was most competent in 'rib-lath+soldier system'. In considering benefit and cost together, 'euro-form+soldier system' was judged to be the best option. This is likely to be attributed to the following reasons: site workers are familiar with euro-forms because it is the most widely used; and, soldier system is more reliable in bearing lateral pressure compared to steel pipes.

A Study on the Risk Rate of Work Type According to the Fatal Accident Cases and the Work Strength in Construction Work (중대재해사례와 직업강도를 고려한 건축공사 위험성 평가)

  • Lee, Jong-Bin;Go, Seong-Seok;Jang, Seong-Rok
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.102-107
    • /
    • 2006
  • Construction accidents have not decreased in spite of much effort such as new work methods, education and research related to safety works. Specially, many fatal accidents happened in construction works which involve the apartment, building, school, church, hotel, hospital, bank work and the other works. These accidents are mainly caused by unanticipated risk factors. From these reasons, this study researched fatal accidents which happened in construction works during last 13 years($1992{\sim}2004$) and analyzed the input workers and a work period of construction work. According to the input workers and a work period, the results are as following. During 13years($1992{\sim}2004$), the fatal accidents, related to the construction work, were happened to the 1,977 cases. These results were occupied the 21.32% of the total industry accidents. According to the result of the construction, the fatal accident rate of a concrete form work was the highest rate of 16.24% (321 cases) and a temporary work, a steel frame work was the each rate of 12.39%(245 cases), 10.07%(199 cases). Comparing to other work types, the fatal accident rate of those three work types(concrete form work, temporary work, steel work) was represented highly. We surveyed input workers and work period of construction work site. From the result of survey, input workers of a concrete form work were occupied with 13,720. The risk rate of the work type, which was considered input workers and work period, was represented 0.3622(a steel frame work), 0.1142(a temporary work), 0.0782(a tower crane) and 0.0772(a concrete work).

A Study on the Public's Perception on Accordance with Change of Exhibition Space in an Art museum after 1990's - The Formal Form of Exibition Space and the Informal Form of Exhibition space in Glytothek Munchen - (1990년대 이후 미술관 전시공간 형태의 변화에 따른 관람자의 작품인지에 관한 연구 - 글립토텍을 중심으로 한 정형전시공간과 비정형편시공간 -)

  • Lee, Jung-A;Moon, Jung-Mook
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2008.05a
    • /
    • pp.74-77
    • /
    • 2008
  • In the relationship between exhibition space and art work in art museum, the Pluralism on the late of the 20th century made the new form of exhibition space to be appeared on the stage. Even if formal exhibition space that emphasized itself as a non-spatial background is currently being continued, the informal form of exhibition space is coming to the new art museums, especially after 1990's. This study is to understand how the advent of new designed the informal form of exhibition space in the Glytothek museum(the formal form of exhibition space) design a new paradigm In the relation between the exhibition space and art work in conjunction with public's perception. To do this, it is made clear that the Glytothek museum(the formal form of exhibition space) simply has played a role of non-spatial background. In other hands, the new designed informal form of exhibition space that is mainly presented after 1990's begins to Interrupt the public's perception of art work, changing it's meaning through a spatiality.

  • PDF