• Title/Summary/Keyword: Freight Trains

Search Result 53, Processing Time 0.036 seconds

Additional Freight Train Schedule Generation Model (화물열차 증편일정 결정모형)

  • Kim, Young-Hoon;Rim, Suk-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.6
    • /
    • pp.3851-3857
    • /
    • 2014
  • Shippers' requests of freight trains vary with time, but generating an additional schedule of freight trains is not easy due to many considerations, such as the line capacity, operation rules, and conflicts with existing trains. On the other hand, an additional freight train schedule has been continuously requested and manually processed by domestic train operation companies using empirical method, which is time consuming. This paper proposes a model to determine the additional freight train schedule that assesses the feasibility of the added freight trains, and generates as many additional schedules as possible, while minimizing the delay of the existing schedules. The problem is presented using time-space network, modeled as multi-commodity flow problem, and solved using the column generation method. Three levels of experiment were conducted to show validity of the proposed model in the computation time.

An Optimization Model for Assignment of Freight Trains to Transshipment Tracks and Allocation of Containers to Freight Trains (화물열차 작업선배정 및 열차조성을 위한 수리모형 및 해법)

  • Kim, Kyung-Min;Kim, Dong-Hee;Park, Bum-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.5
    • /
    • pp.535-540
    • /
    • 2010
  • We present an optimization model for how to assign the freight trains to transshipment tracks and allocate the containers to the freight trains in a rail container terminal. We formulate this problem as a multi-criteria integer programming to minimize the makespan of job schedule and simultaneously to maximize the loading throughput, i.e. the number of containers to be disposed per day. We also apply our model to the instance obtained from the real-world data of the Uiwang Inner Container Depot. From the experiments, we can see an improvement of approximately 6% in makespan, which means that our model can contribute to the improvement of the disposal capacity of containers without additional expansion of facilities.

A Study on the Improvement of Release Application Characteristics of Pneumatic Brakes for Freight Train

  • Nam, Seong-Won;Kim, Hyeong-Jin
    • Journal of Mechanical Science and Technology
    • /
    • v.16 no.6
    • /
    • pp.776-784
    • /
    • 2002
  • We have performed experimental studies for the improvements of pneumatic brake systems of freight trains. Currently, most of the freight trains operated by the Korean National Railroad have either empty-load or diaphragm type brake systems. In this study, appropriate methods that the air pressure characteristics in both type of brake systems are in accordance with each other have been investigated. We have also performed running tests using a 30 car-train set to design optimum capacity of a quick release valve. The test results show that the quick release valve is considerably effective in shortening the release time of the diaphragm type brake system. In the case of a normal brake application, the diaphragm type brake system with the quick release valve reduces the release time to 34% of that of the system without the quick release valve. This release time is almost equivalent to that of the empty-load type brake system. Accordance of braking performance in different types of brake systems in a train set is expected to prevent wheel flats and to reduce maintenance costs.

Strength Analysis of Locking Parts for Adjustable Wheelset during the Gauge Changeover Operation - (궤간 가변 주행시 궤간 가변 잠금부품들에 대한 강도해석)

  • Kim, Chul-Su;Ahn, Seung-Ho;Chung, Kwang-Woo;Jang, Seung-Ho;Jang, Kook-Jin;Kim, Jung-Kyu
    • Proceedings of the KSME Conference
    • /
    • 2007.05a
    • /
    • pp.189-194
    • /
    • 2007
  • To reduce the cost and time of transport in Eurasian railroad networks such as TKR, TCR and TSR owing to the problem of different track gauges(narrow/standard/broad gauge), it is important to develop the gauge - adjustable wheelset system to adapt easily to these gauges. Moreover, freight trains having the gauge - adjustable wheelset will be run various curved tracks in railroad networks. Therefore, to assure the safety of the gauge-adjustment wheelset system, it is necessary to evaluate integrity of locking parts in the system using stress analysis. In this study, it was performed to contact stress analysis of locking parts by using FEA(finite element analysis) simulator during the gauge changeover operation and freight trains' service in the curved track, respectively.

  • PDF

A Study on the Assigning Track of Freight Trains in a Rail Container Terminal (철도 터미널 화물열차 작업선배정에 관한 연구)

  • Kim, Kyung-Min;Park, Bum-Hwan;Kim, Dong-Hee;Hong, Soon-Heum
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1209-1214
    • /
    • 2010
  • In these days, rail container service is being more important because it has relatively simple network. In addition, small lot sizes of shipment, frequent shipment, and demand for flexible service are important characteristics in rail container transportation. Efficient container operation at terminals is important in reducing transportation costs and load/unload time. This paper describes the assigning track of freight trains in the railway freight terminal. The paper addresses the operational requirements and facility restrictions to construct a mathematical model for track assignment. In addition, it suggests several types of objectives for the model.

  • PDF

A Study on the Additional Train Scheduling Method (열차 증편방법에 관한 연구)

  • Kim, Young-Hoon;Rim, Suk-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.4
    • /
    • pp.313-319
    • /
    • 2014
  • Additional train scheduling is often required to increase the capacity of transporting passengers or freight. In most previous studies on scheduling additional trains, operation time of the added train is designated first; and then the train operation feasibility is examined. However, it is often difficult to apply this approach to domestic trains because the density of the railroad network in Korea is high and various types of trains are in use. Moreover, for freight trains, it is even more challenging because the delay is accumulated due to lower priority whenever a freight train and a passenger train contend for a common segment of rail. In this paper, we address the additional train scheduling problem which entails finding a feasible schedule for an additional train having a fixed departure time or departure time windows. The problem is modeled as a mixed integer programming and a column generation technique is used to solve it.

Experimental Study on the Pressure Characteristics of Pneumatic Brake for Freight Train (화물열차의 공기제동 압력 특성에 관한 실험적 연구)

  • Nam, Seong-Won;Moon, Kyung-Ho;Lee, Dong-Hyung
    • Proceedings of the KSME Conference
    • /
    • 2000.04b
    • /
    • pp.593-598
    • /
    • 2000
  • Experimental study is conducted to clarify the pneumatic characteristics of brake system for freight train. Empty-load and diaphragm brake systems are mainly installed in the freight trains owned by KNR(Korean National Railroad). Experimental train set is composed of sixteen freight train and one diesel locomotive that are now in use. From the experimental results, in case of commercial brake, empty-load brake system responds to the brake command more slowly than the diaphragm brake system. But, in case of release command, the response time of diaphragm brake system is shorter than that of empty-load one. In the emergency brake test, the decreasing rate of brake pipe pressure of tenth car is almost same that of decreasing rate of commercial brake service.

  • PDF

Experimental Study on the Improvement of Release Application Characteristics of Pneumatic Brakes for Freight Train (화물열차의 공기제동 완해성능 향상에 관한 실험적 연구)

  • Nam, Seong-Won;Mun, Gyeong-Ho;Lee, Dong-Hyeong
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.25 no.12
    • /
    • pp.1739-1747
    • /
    • 2001
  • Experimental study has been conducted to clarify the pneumatic characteristics of brake system for freight train and enhance the performance of diaphragm valve. Empty-load and diaphragm valves are installed in pneumatic brake system for freight trains of KNR (Korean National Railroad). Experiments are conducted by using freight train and diesel locomotive in operation. From the experimental results. new quick release valve shortens release time after brake application. In case of normal brake application, the release time is shortened to 34% of the original diaphragm valve. Reducing the release time of pneumatic brake system will be helpful to assure brake-release application and save maintenance efforts like wheel grinding.

A Study on the Equalization of Pneumatic Brake-Release Performance between Various Freight Cars (이종(異種) 화물열차의 제동-완해 공기압성능 균등화에 관한 연구)

  • Nam, Seong-Won;Moon, Kyung-Ho;Lee, Dong-Hyung
    • Proceedings of the KSME Conference
    • /
    • 2001.06b
    • /
    • pp.525-532
    • /
    • 2001
  • Experimental study has been conducted to clarify the pneumatic characteristics of brake system for freight train and enhance the performance of diaphragm valve. Empty-load and diaphragm brake systems are mainly used in the freight trains of KNR (Korean National Railroad). The train set is composed of thirty freight cars and diesel locomotive. From the experimental results, new quick release valve shortens release time after brake application. In case of normal brake application, the release time is short by 34% of that of original diaphragm control valve. It will be expected to assure brake-release application and reduce maintenance efforts.

  • PDF

A Study on the Applying of Balancing Control and Safety Monitoring Technology of Cargo on the Freight Train (화물열차 적재화물의 균형제어 및 안전모니터링기술 적용 연구)

  • Han, Seong-Ho;Han, Young-Jae;Lee, Suk;Kim, Young-Hoon
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.66 no.4
    • /
    • pp.224-228
    • /
    • 2017
  • Recently, in order to improve the efficiency of freight transportation on existing lines, a new freight train model is needed to develop urgently. The weight balance of the cargo for the freight vehicle is very important for the stability of the running train and the safe transportation of the cargo. For achieving the cargo weight balance, we proposed a Cargo Balancing Control(CBC) system on the Freight vehicle equipped in between under frame of car body and bogie system. The Cargo Safety Monitoring(CSM) system was designed to supervise status of the Cargo on freight train. The monitoring system can display real time status data from sensors and various signals effectively. We suggested that this paper is a very useful approach for keeping the safety of running freight trains on existing lines.