• Title/Summary/Keyword: General Construction Company

Search Result 112, Processing Time 0.027 seconds

An Empirical study on the Prevention of Crash Accident in Construction Fields - Focused on G Construction Company - (건설업의 추락사고 예방 시스템 구축을 위한 실증적 연구 -G 건설사를 중심으로-)

  • Jo, Jae-Hwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.33-38
    • /
    • 2012
  • Construction companies with the highest proportion in death crash has been devoting much effort to prevent the crash accidents. In general, a crash-proof worker has been wearing a seatbelt. However, the G construction company had happened in industrial settings when workers fail to abide by the rules. The Carabiner, one of the composing of Safety Belt, must endure the Allowable Load. In this study, the Industrial accidents and cause of the crash analysis in G Construction company is performed by empirical research. And we have been studied the empirical research to setting up of the allowable limit for Carabiner.

Analysis on the submittal process for a small local environmental construction company: a case study (지역 소규모 환경건설회사의 제출/승인 절차 분석에 관한 사례 연구)

  • Lee, Do Gyun
    • Journal of Urban Science
    • /
    • v.6 no.2
    • /
    • pp.73-80
    • /
    • 2017
  • A submittal, as a part of three main project management processes: production control, submittals and change orders, is the transmission of information from the subcontractor to the general contractor to the owner, architect, and structural engineer, for review and approval. The purpose of the submittal process is for submittals to be approved in order to start construction. This benefits the contractor by ensuring that the finished project will meet the expectations of the owner. This paper analyzed a case study regarding the submittal process for the local-based environmental construction company, which typically works as a subcontractor and may hire other subcontractors for additional work when applicable. The aim of this study was to roughly evaluate a project management process and understand the submittal process through the study of a case involving the local company.

  • PDF

A Study of the Characteristics of Emergency Housing from Japan Prefabricated Construction Suppliers and Manufacturers Association and General Construction Companies Provided during the Great East Japan Earthquake - focusing on the Kaisei and Ohashi Complexes of Ishinomaki City - (동일본대지진 시 공급된 프리패브건축협회 및 종합건설사의 응급가설주택 특성에 관한 연구 - 이시노마키시(石巻市) 카이세이(開成)단지 및 오하시(大橋)단지를 중심으로 -)

  • Lee, Sang-Hee;Kim, Bong-Ae
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.36 no.4
    • /
    • pp.61-70
    • /
    • 2020
  • The purpose of this study is to provide data for planning future temporary housing in Korea by comparing and analyzing the characteristics of emergency housing rapidly supplied by Japan Prefabricated Construction Suppliers and Manufacturers Association(JPA) and general construction companies, according to the supply subject in times of natural disasters in Japan. Literature reviews and on-site field investigations are conducted as research methods during the period of August 4th~9th, 2019. As subjects of study, the characteristics of two housing complex built in Ishinomaki City with different supply subjects were compared and analyzed. As a result of this study, Japan has a clear distinction of terms for emergency housing, which are divided into rental and construction types. With the close cooperation between the government, local governments and construction companies, providing a prompt systematic supply is possible. The characteristics of emergency housing are differ depending on supply subjects. The emergency housing of JPA has diversity of plane, two rooms facing south, and fast construction time, while the emergency housing of the general construction company has a flexible spatial transformation and excellence of materials.

A Comparative Study on Prediction Performance of the Bankruptcy Prediction Models for General Contractors in Korea Construction Industry

  • Seung-Kyu Yoo;Jae-Kyu Choi;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.432-438
    • /
    • 2011
  • The purpose of the present thesis is to develop bankruptcy prediction models capable of being applied to the Korean construction industry and to deduce an optimal model through comparative evaluation of final developed models. A study population was selected as general contractors in the Korean construction industry. In order to ease the sample securing and reliability of data, it was limited to general contractors receiving external audit from the government. The study samples are divided into a bankrupt company group and a non-bankrupt company group. The bankruptcy, insolvency, declaration of insolvency, workout and corporate reorganization were used as selection criteria of a bankrupt company. A company that is not included in the selection criteria of the bankrupt company group was selected as a non-bankrupt company. Accordingly, the study sample is composed of a total of 112 samples and is composed of 48 bankrupt companies and 64 non-bankrupt companies. A financial ratio was used as early predictors for development of an estimation model. A total of 90 financial ratios were used and were divided into growth, profitability, productivity and added value. The MDA (Multivariate Discriminant Analysis) model and BLRA (Binary Logistic Regression Analysis) model were used for development of bankruptcy prediction models. The MDA model is an analysis method often used in the past bankruptcy prediction literature, and the BLRA is an analysis method capable of avoiding equal variance assumption. The stepwise (MDA) and forward stepwise method (BLRA) were used for selection of predictor variables in case of model construction. Twenty two variables were finally used in MDA and BLRA models according to timing of bankruptcy. The ROC-Curve Analysis and Classification Analysis were used for analysis of prediction performance of estimation models. The correct classification rate of an individual bankruptcy prediction model is as follows: 1) one year ago before the event of bankruptcy (MDA: 83.04%, BLRA: 93.75%); 2) two years ago before the event of bankruptcy (MDA: 77.68%, BLRA: 78.57%); 3) 3 years ago before the event of bankruptcy (MDA: 84.82%, BLRA: 91.96%). The AUC (Area Under Curve) of an individual bankruptcy prediction model is as follows. : 1) one year ago before the event of bankruptcy (MDA: 0.933, BLRA: 0.978); 2) two years ago before the event of bankruptcy (MDA: 0.852, BLRA: 0.875); 3) 3 years ago before the event of bankruptcy (MDA: 0.938, BLRA: 0.975). As a result of the present research, accuracy of the BLRA model is higher than the MDA model and its prediction performance is improved.

  • PDF

An Analysis of Safety Control Effectiveness in Construction (건설업 안전관리 효과분석에 관한 실증적 연구)

  • 갈원모;손기상;채준석
    • Journal of the Korean Society of Safety
    • /
    • v.11 no.1
    • /
    • pp.121-128
    • /
    • 1996
  • Estimating the cost of injuries and "accidents" to an organization is very important to figure out about how much well each organization has run his company and how much efficiently he has got the results using a certain amount of the expense for safety. Despite the potential usefulness to management of information as to the cost of a company's "accidents", it is not customary accounting practice to make these data available. Of the two general kinds of costs forced on a company by its occupational injuries and "accidents", the insurance cost and uninsured cost, -the former is by far the easier to find out. But actually, this uninsured cost should be figured out at each company. Authors have designed the generalized model to figure out the above problem costs to establish its efficient safety control. One construction company has been a pilot for this study. It is found that efficient safety control cost should be 1.2%~l.3% of total selling amount by analyzing actual data for three years.g actual data for three years.

  • PDF

Profession and strategy of BIM managers in Japan

  • Kaneta, Takashi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.167-175
    • /
    • 2017
  • Building Information Modeling (BIM) comes to be implemented into architectural design, construction, and maintenance in Japan in order to convert design information thoughout a construction project. However, various problems are taking place in data transaction. It is not also clear about the role and the responsibility of the architects and the enginners in charge.There is a movement to establish a BIM manager as a general coordinator concerning BIM in Singapore and other countries, though it is not yet popular in Japan. This paper deals a BIM manager as a new profession in a construction project. The function and skills necessary to a BIM manager is analyzed, and the strategy of Japanese general contractors is discussed. General contractors from Japan are operating BIM in Singapore compatible with open system of supply chain. This style is different from the one in Japan even they belong to the same company. In this paper it is analyzed based on the survey in detail.

  • PDF

The Study of Safety Awareness of Construction Workers and the Improvement of the Safety & Health Education (건설근로자의 안전 의식 실태 및 안전 보건 교육 개선에 관한 연구)

  • Yoon, Songyi;Yoo, Hyesook
    • Journal of The Korean Society of Integrative Medicine
    • /
    • v.4 no.3
    • /
    • pp.81-91
    • /
    • 2016
  • Purpose : This study is conducted to analyze the safe awarenece, its related health education and the employee's requirements in a prime supplier and its subcontractor company, suggesting the proper measure in employee education program. Method : The employees of 'S' construction company and its subcontractor are surveyed during the period of April 15 from May 15 in 2016. The 324 questionnaires are statistically analyzed with the version 21.0 of SPSS. The general characteristics were calculated through the frequency analysis and descriptive statistics. The difference in safe consciousness between prime and subcontractor employee group was analyzed using t-test. Result : The statistics shows the employees in the prime company tend to observe the safe rules rather than the subcontractor employees(p<.005), but the latter are more conscious of safety in working environment than the former(p<.005). In addition, the subcontractor company did not provide his employees with the site for the safety-health education. Conclusion : The small-sized subcontractor company should identify its employees' requirements and supplement the lack of the safety and health education for the prevention of the industrial disasters. In details, the hand-on and practice-oriented leaning and teaching program development are suggested.

An Analysis for Work Performance of Female Field Manager of General Construction Company (일반건설업체 여성 현장관리자의 업무수행능력 분석)

  • Shin, Won-Sang;Lee, Dong-Eun;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.194-196
    • /
    • 2013
  • Recently, It is a fact that the percentage of female field managers has increased in the construction industry. Therefore, this study investigated the percentage of female construction site managers by conducting a survey of current male and female construction site managers and then analyzed the workload, work difficulty, work importance and performance level of female employees in charge of public affairs, which is the most common tasks.

  • PDF

Establishing the Education Strategy in strengthening Construction Management's ability in Large-scaled Construction Company (대형시공사의 사업관리 역량 강화를 위한 교육 전략 수립에 관한 연구)

  • Kim, Sang-Chul;Park, Chan-Jeong;Lee, Sang-Youb;Son, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.109-118
    • /
    • 2007
  • It is related to launch the CM market and to increase the profit and entire ability in company that is enforcing the ability of construction management in large-scaled construction company. According to the CM market in U.S, CM market is increased with competing to the companies, that is E&C, general contractor, design firm, specialized CM firm. Also domestic market is similar to US market. In this situation, large-scaled construction companies are filled with construction management ability for competing with foreign companies and domestic CM firms. This paper suggests how to enforce the construction management ability through education, and shows the detailed education strategy considered the fields, divisions and positions.

Analysis of offshore pipeline laid on 3D seabed configuration by Abaqus

  • Moghaddam, Ali Shaghaghi;Mohammadnia, Saeid;Sagharichiha, Mohammad
    • Ocean Systems Engineering
    • /
    • v.5 no.1
    • /
    • pp.31-40
    • /
    • 2015
  • Three dimensional (3D) non-linear finite element analysis of offshore pipeline is investigated in this work with the help of general purpose software Abaqus. The general algorithm for the finite element approach is introduced. The 3D seabed mesh, limited to a corridor along the pipeline, is extracted from survey data via Fledermous software. Moreover soil bearing capacity and coefficient of frictions, obtained from the field survey report, and are introduced into the finite element model through the interaction module. For a case of study, a 32inch pipeline with API 5L X65 material grade subjected to high pressure and high temperature loading is investigated in more details.