• Title/Summary/Keyword: Gyeongbu

Search Result 117, Processing Time 0.029 seconds

A Study on technical items in the speed-up of catenary system according to a conventional railway′s electrification (기존선 전철화에 따른 전차선로의 스피드업관련 기술사항에 대한 고찰)

  • 안영훈;강창호
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.516-521
    • /
    • 2002
  • This paper was reviewed technical items of catenary system for electrification of Gyeongbu(Dongdaegu∼Busan) and Honam(Daejeon∼Mokpo) conventional Railways. The lines have adopted new technical items in order to connect to Gyeongbu high speed railway. We can use the technology and experience of Gyeongbu and Honam lines to a new catenary system design up-graded for speed-up of conventional lines and new lines construction.

  • PDF

The opening of Gyeongbu high-speed railway project phase II (between Daegu and Busan) (기획특집: 경부고속철도 2단계사업 (대구~부산)개통)

  • Rim, Hyoung-Gyu
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.6
    • /
    • pp.27-30
    • /
    • 2010
  • Gyeongbu high-speed railway project which comprises the construction of the new line with 417.5km between Seoul and Busan is one of the biggest national projects with approx. 20-trillion-won project cost. The construction was started in June 1992 and afterward phase I (between Seoul and Daegu) was opened in April 2004 and phase II (between Daegu and Busan, 169.5km) is scheduled for opening in the end of October 2010. It is assured that the opening of the entire sections of Gyeongbu high-speed railway will significantly increase productivity and efficiency by improving the land utilization with the promotion of personal and material exchanges induced by the reduction of travel time between regions. Especially, Gyeongbu high-speed railway will be the opportunity to boost speed-up of Korea railway.

  • PDF

Evaluation of Subgrade State in the Gyeongbu High Speed Railway through GPR tests and Drilling Boreholes (GPR탐사와 시추조사를 통한 경부고속철도 노반상태평가)

  • Park, Jun-O;Min, Hyeong-Gi;Jeon, Il-Sik
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.984-996
    • /
    • 2009
  • When evaluating the general subgrade states such as geology, stiffness, underground water, compaction and deformation in the Gyeongbu high speed railway, some applicable testing methods should be selected because lots of trains are currently running. The applicable methods includes not only non-destructive tests such as GPR test, electricity resistivity test, MASW proving, but also standard penetration test (SPT), core test, elastic wave tomography through drilling boreholes and measurements using settlement measuring system or inclinometer, etc. In order for evaluating the subgrade states in the Gyeongbu high speed ralway, this study performed GPR test in several sections and drilling boreholes whose locations were chosen after comparing GPR test results and track maintenance history. Furthermore, the progress of subgrade deformations was analysed by comparing previous and this time GPR test results. The results of this study shall be used to understand the general states of currently operating Gyeongbu high speed railway.

  • PDF

A Study on the Socio-economic Direct Effects of the Opening of the Gyeongbu Expressway for 50 Years (경부고속도로 개통 50년의 사회경제적 직접효과 평가 연구)

  • Yoo, Dayoung;Park, Byeonghun;Hong, Jungyeol;Choi, Yoonhyuk;Shon, Euiyoung;Park, Dongjoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.20 no.1
    • /
    • pp.119-131
    • /
    • 2021
  • This study quantitatively derived the direct socio-economic effects of the Gyeongbu Expressway, which opened in 1970, and suggested a methodological approach for more reliable results. The scenario was set when the Gyeongbu Expressway was not constructed in 1970, the opening of the Gyeongbu Expressway was delayed by 10 years, and the toll road between Seoul and Daejeon, or between Seoul and Gangneung was opened instead of the Gyeongbu Expressway as suggested by the World Bank. In addition, direct benefits were estimated by calculating and comparing the current vehicle operating costs, travel time costs, traffic accident costs, and environmental pollution costs. As a result, it was estimated that about 351 trillion won in direct benefits occurred, and it can be seen that the promotion of the construction project of the Gyeongbu Expressway at that time had a huge impact on South Korea's social economy.

Analysis of Return Current by Common Earth on Electrical Line of the Gyeongbu Line (경부선 전철화 구간에서의 공동접지에 의한 귀선전류 분석)

  • Kim, Yong-Kyu;Baek, Jong-Hyen
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.12
    • /
    • pp.4968-4974
    • /
    • 2010
  • Electrical Railroads provide electric power, which can operate vehicles, via feeder wires. And the supplied current returns to the transformer substation through lines and ground net. In domestic cases, the configuration of ground net affecting such a return current mostly uses an exclusive earth method. However, along with the introduction to Gyeongbu HSL(High Speed Line), the concept of Common Earth was applied to Electrical Railroads. In this paper, based on the return currents analyzed to be measured in the electrified sections for the operation of High Speed Rails in existing lines, we analyze the relations between earth methods and return currents in electrified sections. For analysis, we utilize the measured values of return currents measured in track circuits in Gyeongbu HSL, and predictive values of those compared to the earth methods between Gyeongbu HSL and the existing electrified sections.

Gyeongbu Highway: Political Economic Geography of Mobility and Demarcation (경부고속도로: 이동성과 구획화의 정치경제지리)

  • Choi, Byung-Doo
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.13 no.3
    • /
    • pp.312-334
    • /
    • 2010
  • This paper examines the process of Gyeongbu Highway construction from the standpoint of political economy, which was pursued by President Park Jeong-Hee in the 1960s, focusing on the politics of mobility and demarcation implied in it. As results of examination, it can be argued that Gyeongbu Highway was seen as a powerful element to promote a socio-spatial integration of population and hence to enforce an authoritative political power of the Park regime through creation of mobility; that it has had an strong impact on changing the physical landscape of national space and the spatio-temporal rhythm of everyday life by extending the 'machine space' as a non-place; that it has provided a physical infrastructure on which the period of capital circulation could be reduced through its effect of space-time compression. But Gyeongbu Highway has led serious problems such as uneven regional development, expansion of non-place or alienated place, ecological destruction and pollution. In conclusion, a sustainable politics is suggested to overcome this kind of 'tragedy of highway' and to develop the highway as a true way of political and spatial balance and integration.

  • PDF

Study on Commercial speed up and Catenary System in Gyeongbu High Speed Line (경부고속철도 운행구간의 전차선로와 표정속도 향상에 대한 연구)

  • Ahn, Young-Hoon;Choi, Jong-Bok;Park, Hyung-Woong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2306-2309
    • /
    • 2011
  • With the opening of 1st phase and 2nd phase in Gyeongbu High Speed Line, KTX(The Korea Train Express) and Sancheon(2nd generation of High Speed Train) are operating commercially on entire line. Gyeongbu High Speed Line can be separated as several sections. In this entire line, a few types of train has operating by it's own pattern. However, commercial speed of the line compared with the maximum speed of Train is rather slow. Through this study, I found the reason of the slow speed on the Catenary system and suggested a solution.

  • PDF

Estimation and Measurement of the Traction return current on the electrified Gyeongbu line.

  • Kim, Y.K.;Yang, D.C.;Han, M.S.;Ryu, C.K.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.99.5-99
    • /
    • 2001
  • This study presents a simulation of the traction return current based on $2{\times}25kV$ power supply system in order to determine the impedance bond intensity of impulse type track circuit on the electrified Gyeongbu line. The results of the simulation enables us to measure the precise intensity of catenary current that returns to the substation through KTX (Korean Train Express) operated by $2{\times}25kV$ power supply system with common earth network. The combination of $2{\times}25kV$ and common earth network established on the electrified Gyeongbu line for the first time in Korea. We show that the relationships among the traction return current, earth current, and catenary current, and catenary current can be applied to this line in order to determine the optimal impedance bond intensity ...

  • PDF

Suggestion to Improve the Railway Infra for Speed Increase of High-speed Train in Gyeongbu Line (경부선 고속열차 증속을 고려한 철도인프라 보강 방안)

  • Kim, Jung-Hun;Park, Dae-Geun;Won, Yong-Hoan;Kim, Man-Cheol;Kang, Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1249-1253
    • /
    • 2009
  • Enhancements of transport capacity in Gyeongbu line are continuous with the operating cost reduction and Korean economic development. Besides, requirements of a people about speed-up and customer service after the opening of high-speed railway(KTX) are being increased nowadays. Therefore, development and effort for speed increase of high-speed railway(KTX) have to be encouraged and supported by the government. In this study, market and technology trends for speed increase of high-speed train in Korea and abroad were investigated. As a result, we suggested to improve the railway infra for speed increase of high-speed train in Gyeongbu line.

  • PDF

Review of the Improvement Plans on Catenary Systems for Speed Increase in Gyeongbu High-Speed Line

  • Eum, Ki Young;Yun, Jangho;Lee, Kiwon;Kim, Jung Hwan
    • International Journal of Railway
    • /
    • v.6 no.2
    • /
    • pp.64-68
    • /
    • 2013
  • In recent years, the speed of a train has been recognized as one of the important factors to determine the competitiveness as a mean of transportation. In line with this, infrastructure improvements and enhancements are being made with increases in the speed of train. Accordingly, there is a need to establish plans for infrastructure improvements through a comprehensive analysis of signals, track/civil engineering, catenary and environment, etc. to improve the speed of a train of high-speed train service sections in Korea. This study proposes improvement plans for catenary systems by investigating the possibility of improvements through performance analysis of catenary equipment by speed increase based on the analysis on catenary systems in Gyeongbu high-speed line, and analysis the applicability of catenary improvements and economic feasibility.