• Title/Summary/Keyword: High-rise building

Search Result 1,745, Processing Time 0.02 seconds

A Study on the Improvement of Fire Safety in high-rise Building Construction in Legal aspects (법규적 측면에서 고찰한 고층 건축물 공사현장 화재안전 확보방안)

  • Park, Chan-Seok;Jeong, Il-Kyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.1
    • /
    • pp.21-32
    • /
    • 2015
  • High rising of the buildings offers a number of risk factors than ever before with regard to fire prevention. Especially in the construction site of high-rise buildings, people waste golden-time during the evacuation because temporary fire fighting facilities are not installed and transferred to a large fire because of fire suppression failure. In this study, the researcher derives the problems of fire protection in high-rise buildings construction sites and proposed the measures in such the legal aspects as fire building construction code and etc. There are the legal improvements such as orders of construction suspension in the problems of fire safety, appointing fire safety manager, temporary fire protection installation standards, enhancing penalty provisions regarding the use of fire, operating self fire brigade, confirming on-site after completing fire-protection facalities, establishment or strengthening special fire-protection investigations.

Application Examples of CFD at the Planning Stage of High-Rise Buildings

  • Hiroto, Kataoka;Yoshiyuki, Ono;Kota, Enoki;Yuichi, Tabata;Satoko, Kinashi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.145-156
    • /
    • 2022
  • Application examples of computational fluid dynamics (CFD) in the planning stage of high-rise buildings are introduced. First, we introduce examples of applications in the environmental field. The pedestrian wind environment was one of the earliest practical examples of CFD. CFD was also employed to validate the heat island mitigation measures proposed as part of the new construction plan. Second, application examples of wind-force evaluations are introduced. Prediction examples are presented for the peak wind pressure around a complex-shaped building and the wind force evaluation for a base-isolated building. The results prove that the results of the proper execution of CFD are equivalent to those of the wind tunnel experiment. As examples of CFD applications of other issues related to high-rise building planning, we introduce snow accretion on outer walls and high-temperature exhaust from emergency generators. Finally, the future prospects for the use of CFD are discussed.

Large-scale Seismic Response Analysis of Super-high-rise Steel Building Considering Soil-structure Interaction using K computer

  • Miyamura, Tomoshi;Akiba, Hiroshi;Hori, Muneo
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.1
    • /
    • pp.75-83
    • /
    • 2015
  • In the present study, the preliminary results of a large-scale seismic response analysis of a super-high-rise steel frame considering soil-structure interaction are presented. A seismic response analysis under the excitation of the JR Takatori record of the 1995 Hyogoken-Nanbu earthquake is conducted. Precise meshes of a 31-story super-high-rise steel frame and a soil region, which are constructed completely of hexahedral elements, are generated and combined. The parallel large-scale simulation is performed using K computer, which is one of the fastest supercomputers in the world. The results are visualized using an offline rendering code implemented on K computer, and the feasibility of using a very fine mesh of solid elements is investigated. The computation performance of the analysis code on K computer is also presented.

Experimental evaluation of aerodynamic damping of square super high-rise buildings

  • Quan, Yong;Gu, Ming;Tamura, Yukio
    • Wind and Structures
    • /
    • v.8 no.5
    • /
    • pp.309-324
    • /
    • 2005
  • Aerodynamic damping often plays an important role in estimations of wind induced dynamic responses of super high-rise buildings. Across- and along-wind aerodynamic damping ratios of a square super high-rise building with a height of 300 m are identified with the Random Decrement technique (RDT) from random vibration responses of the SDOF aeroelastic model in simulated wind fields. Parametric studies on effects of reduced wind velocity, terrain type and structural damping ratio on the aerodynamic damping ratios are further performed. Finally formulas of across- and along-wind aerodynamic damping ratios of the square super high-rise building are derived with curve fitting technique and accuracy of the formulas is verified.

Historical Review on High-rise Buildings-promoting Policies on the Main Roads of Seoul for Urban Beautification from the 1950s to the 1970s (1950-1970년대 도시미화를 위한 서울 간선도로변 고층화제도의 사적 고찰)

  • Park, Ilhyang;Jeon, BongHee
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.10
    • /
    • pp.41-52
    • /
    • 2019
  • The purpose of this study was to analyze the historical development of high-rise buildings-promoting policies in Seoul in terms of modern urban redevelopment. The results of this study were as follows; The maximum height of the buildings has been limited by National codes since 1934. But at the same time, Seoul Metropolitan government had limited the minimum building floors of roadside buildings through local regulations after the Korean War. The high-rise city had been regarded as a means of beautifying Seoul for a long time. However since the 2000s, the minimum height limit for buildings was removed from local regulations and the concept of high-rise restrictions was no longer significant as before.

Seismic Performance and Vibration Control of Urban Over-track High-rise Buildings

  • Ying, Zhou;Rui, Wang;Zengde, Zhang
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.207-219
    • /
    • 2022
  • During the structural design of urban over-track high-rise buildings, two problems are most likely encountered: the abrupt change of story stiffness between the podium and the upper towers, as well as the demand for train-induced vibration control. Traditional earthquake-resistant structures have to be particularly designed with transfer stories to meet the requirement of seismic control under earthquakes, and thus horizontal seismic isolation techniques are recommended to solve the transfer problem. The function of mitigating the vertical subway-induced vibration can be integrated into the isolation system including thick rubber bearings and 3D composite vibration control devices. Engineering project cases are presented in this paper for a more comprehensive understanding of the engineering practice and research frontiers of urban over-track high-rise buildings in China.

Challenges in High-rise Wooden Structures and the Seismic Design in Japan

  • Hiroyasu, Sakata;Yoshihiro, Yamazaki
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.171-180
    • /
    • 2022
  • Research and development on high-rise or large-scale wooden buildings have been actively conducted both domestically and internationally. The trend of high-rise wooden buildings is driven by increasing awareness of environmental issues. To utilize wooden materials in buildings is believed to lead to the reduction of the environmental impact. On the other hand, Japan is one of the most earthquake-prone countries in the world, and many wooden detached houses have been damaged in past major earthquakes. This paper summarizes the issues that arise in the realization of medium- and high-rise wooden buildings in Japan, and introduces the initiatives that have been seen so far.

A Study on Pricing Model of High-Rise Residential Buildings From the viewpoint of Landmark Factor

  • Sung-Kon Moon;Sang-Hyo Lee;Kyung-Min Min;Joo-Sung Lee;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.573-578
    • /
    • 2009
  • Previous research on super high rise buildings focused mostly on the use of public space from building plan perspective, survey of residents' satisfaction evaluation, construction technology and structural technology. But little research is done on the economic analysis of landmark factors. The purpose of this study is to find landmark factors that can be quantitatively measured, collect data on super high rise residential buildings in Seoul. Find the intrinsic values of the landmarks, and analyze how these values differ in areas with different densities, i.e. in 3 Gangnam-gus & Yeongdeungpo-gu and in other areas. It is expected that the results of this study can be used to set an appropriate price of super high rise building in consideration of its landmark value in different area

  • PDF

Organizational Approach for Enhancing the Performance of High-Rise Building Projects (초고층 건축프로젝트의 성과 향상을 위한 조직차원의 접근방법)

  • Hong Young-Tak;Song Sang-Hun;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.271-276
    • /
    • 2004
  • In recent years, many high-rise buildings have been constructed for the purpose of redevelopment of urban environments in Korea. However, generally the construction durations do not increase in proportion to the number of the floors or the height of the building. So new materials, equipments, and methods are applied to high-rise building construction in order to overcome this problem. In most cases, applying these new resources is considered mainly as the technical issue, and the organizational aspects of this is frequently overlooked. This study discussed the performance variance in time and identified the causes of time variance in high-rise building construction from organizational viewpoint .

  • PDF

An optimal inventory management system for high-rise building -Focused on Re-bar Works- (초고층 건축공사의 특수성을 고려한 최적 자재 재고 관리 방안에 관한 연구 -철근공사를 중심으로-)

  • Kim, Geun-Hwan;Lee, Su-Hwan;Yun, Jung-Suk;Park, Kyung-Mo;Kim, Chang-Duk
    • KIEAE Journal
    • /
    • v.13 no.1
    • /
    • pp.151-157
    • /
    • 2013
  • Since high-rise building construction sites are usually located in crowded city areas, sufficient spaces for the inventories of key materials are rarely available. This spatial constraints have been one of the critical challenge that may cause productivity loss and increasing costs of the high-rise building construction projects. The proper material inventory management is certaing a key to the success of high-rise building construction projects as it handles difficulty of securing material stock yards, changes in demands, uncertain delivery time through integrating the construction schedules and actively responding to the key materials attributes. In this light, this research analyzes the latest inventory model, (Q,r) model, in accordance with the high rise building characteristics. This research suggests an optimal inventory management of re-bar considering various demands and lead times. The case study is also presented with regard to the re-bar inventory management.