• 제목/요약/키워드: High-rise building

검색결과 1,745건 처리시간 0.028초

고층 건축을 위한 수직외벽 청소로봇의 작업 시나리오 개발 (Development of a Vertically Moving Scenario of Robotic Exterior Wall Cleaning for High-rised Building)

  • 김균태;김창한;한재구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.195-196
    • /
    • 2011
  • Recently, the number of high-rise buildings has been on the rise, which has meant that maintenance cost has increased by two and three times, along with the increase in the construction cost. It is suggested that the use of an auto-cleaning robot could increase the productivity and safety of cleaning work, which is mostly done outside of a building. In particular, the guide rail on a high-rise building could be useful in this capacity, as it has the advantage of not being significantly influenced by factors of the external environment, including wind pressure. For this reason, this research is preliminary research into a cleaning automation for a high-rise building, and aims to draw up a scenario for the vertically moving robot.

  • PDF

Numerical study for downburst wind and its load on high-rise building

  • Huang, Guoqing;Liu, Weizhan;Zhou, Qiang;Yan, Zhitao;Zuo, Delong
    • Wind and Structures
    • /
    • 제27권2호
    • /
    • pp.89-100
    • /
    • 2018
  • 3D simulations based on an impinging jet were carried out to investigate the flow field of a steady downburst and its effects on a high-rise building by applying the SST k-${\omega}$ turbulence model. The vertical profile of radial wind speed obtained from the simulation was compared with experimental data and empirical models in order to validate the accuracy of the present numerical method. Then wind profiles and the influence of jet velocity and jet height were investigated. Focusing on a high-rise building, the flow structures around the building, pressure distributions on the building surfaces and aerodynamic forces were analyzed in order to enhance the understanding of wind load characteristics on a high-rise building immersed in a downburst.

초고층에서의 현장타설말뚝 재하시험방법 고찰 (The Study of Load Test Method for In-Site Casting Pile In High Rise Building.)

  • 김대학;홍영길;한성무;구웅회;박찬덕
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.385-392
    • /
    • 2008
  • Modern city have had a lot of high-rise building in high standards and multi-level performance. Using of city space reach better stages by using integration. These skyscraper have increased working load on ground. that building is efficiently designed for that soil capacity is well applied. With material side, big size pile, high strength concrete and high strength steel is used for that getting enough lobby space and resisting load increased of high-rise building. limit load test and load transmitted test can make soil capacity optimized. By the way, method of measuring pile capacity is more advanced and bigger. pile type applied by high rise building have underground excavation space, also reflect regional soil property and have some fact reviewed. A lot of high rise building recently is built as land mark in Seoul, Busan and Incheon. about method of measuring capacity of foundation pile, example of construction field is compared and reviewed.

  • PDF

Information-based Smart Construction Management of High Rise Building Under the Complex Surrounding Environment in City Core Area

  • Liang, Haoqing;Li, Jian;Song, Weiqing
    • 국제초고층학회논문집
    • /
    • 제10권3호
    • /
    • pp.203-210
    • /
    • 2021
  • With the development of urbanization, the increasing of buildings density in urban core areas result in the complexity of construction environment. High-rise landmark building is always preferred in the construction of urban core areas. Super high-rise buildings construction are facing construction management difficulties due to the complex working conditions and enormous building system, especially with the complex surrounding environment of the urban core area, the construction management of super high-rise buildings in the area requires higher, refined and detailed standard. Based on a super high-rise project in a core area of Shanghai which has 370 m building height and 772,643 m2 building area, with complex surrounding environment, narrow construction site and many super-high-altitude crossing works. With the application of BIM technology, the Internet of Things, the LAN communication and other various intelligent mechanical equipment, information management systems, the efficiency and refinement of construction management are improved, ensuring the smooth implementation of the project while effectively controlling the impact on the surrounding environment.

초고층 건물에서의 소형풍력발전시스템 적용에 관한 연구 (A Study on the Application of Small Wind Turbine System in Super High-rise Building)

  • 박영현;박정하;박진철;이언구
    • 설비공학논문집
    • /
    • 제25권4호
    • /
    • pp.187-193
    • /
    • 2013
  • Thanks to the characteristic of high-rise buildings, the increase of wind speed according to the height of a building makes it possible to use high wind power resources, many countries led by some advanced nations are recently making steady and persistent effort in introducing small wind turbine systems as a step to lower electric power load in high-rise buildings. The aim of this research is to propose an optimum application process of a small wind turbine system in high-rise buildings. To achieve this goal, the case studies on the applications of high-rise and tall buildings were conducted and the best application among them was selected. On the basis of the case studies, an application process was proposed.

Seismic assessment of slender high rise buildings with different shear walls configurations

  • Farghaly, Ahmed Abdelraheem
    • Advances in Computational Design
    • /
    • 제1권3호
    • /
    • pp.221-234
    • /
    • 2016
  • The present study dictates the behavior of shear wall under a seismic event in slender high rise buildings, and studies the effect of height, location and distribution of shear wall in slender high rise building with and without boundary elements induced by the effect of an earthquake. Shear walls are located at the sides of the building, to counter the earthquake forces. This study is carried out in a 12 storeys building using SAP2000 software. The obtained results disclose that the behavior of the structure is definitely affected by the height and location of shear walls in slender high rise building. The stresses are concentrated at the limit between the shear wall region and the upper non shear wall especially for shear walls without columns. Displacements are doubled between the shear wall region and the upper non shear wall especially for shear walls without columns.

A Study on Securing Safety for High Rise Building Fires - Applying Active Fire Escape Systems -

  • Myung Sik, Lee;Sung Jae, Han
    • 국제초고층학회논문집
    • /
    • 제11권3호
    • /
    • pp.227-240
    • /
    • 2022
  • Under the Korean Enforcement Decree of the Building Act, all high story apartment houses more than 5 stories high are mandated to install a fire evacuation system to ensure safe evacuation from fire accidents and providing quick and easy bidirectional escape route when main entrance is blocked by flame or toxic smoke. However, the current fire evacuation system shows a lack of understanding from residents and thus is widely ignored for having insufficient safety functions, especially vis-à-vis fire emergencies. Studies have found that an alternative evacuation method, the escapable fire evacuation system, has been analyzed for safety evaluation compared with the conventional passive fire escape system and can bring efficient and safer solutions, providing high rise residents escape from fire accidents. Evaluation for safety evacuation has been performed by the Fire Dynamics Simulation and applying Pathfinder simulation. This resulted in providing appropriate escape routes within the safety escape time and allowed for people in high rise building fires to get to safety.

Overview of Performance-Based Seismic Design of Building Structures in China

  • Li, Guo-Qiang;Xu, Yan-Bin;Sun, Fei-Fei
    • 국제초고층학회논문집
    • /
    • 제1권3호
    • /
    • pp.169-179
    • /
    • 2012
  • The development history, the current situation and the future of the performance-based seismic design of building structures in China are presented in this paper. Firstly, the evolution of performance-based seismic design of building structures specified in the Chinese codes for seismic design of buildings of the edition 1974, 1978, 1989, 2001 and 2010 are introduced and compared. Secondly, in two parts, this paper details the provisions of performance-based seismic design in different Chinese codes. The first part is about the "Code for Seismic Design of Buildings" (GB50011) (edition 1989, 2001 and 2010) and "Technical Specification for Concrete Structures of Tall Building", which presents the concepts and methods of performance-based seismic design adopted in Chinese codes; The second part is about "Management Provisions for Seismic Design of Outof-codes High-rise Building Structures" and "Guidelines for Seismic Design of Out-of-codes High-rise Building Structures", which concludes the performance-based seismic design requirements for high-rise building structures over the relevant codes in China. Finally, according to those mentioned above, this paper pointed out the imperfections of current performance-based seismic design in China and proposed the possible direction for further improvement.

초고층 건축물의 위생설비 시스템 설계 (Sanitary Plumbing System Design of High-rise Building)

  • 주덕훈;변운섭;윤해동
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.491-496
    • /
    • 2009
  • Recently, the high-rise building has been constructed competitively because it is symbol of the national competitive power including the technical power. The higher buildings are getting, the more important building mechanical systems are. So, the building mechanical systems are getting developed. Among the building mechanical systems, the sanitary system is basically necessary in order to maintain the building hygienically along with convenience and safety. This study has been investigated for various cases of high-rise building plumbing system. As a result, a variety of zoning method has been applied to most skyscrapers depending on the building height in the building mechanical system. And a variety of joint have been applied to minimize the Shortening and Sway. Also, the drainage in same uses has been discharged outside of a build through the one vertical pipe line. And airing system has been used like Individual Vent Pipe Yoke Vent Pipe Stack Vent Pipe Loop Vent Pipe Relief Vent Pipe method. It is sure that this study could be used as the high-rise building design.

  • PDF

고층건물 외벽 유지보수 건설로봇 시스템 개발을 위한 청소공정 작업절차 분석 (Facade Cleaning Process Analysis For Construction Robot System Design of High-rise Building External wall Maintenance)

  • 김대건;김복규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.77-79
    • /
    • 2011
  • As residents and building owners demand maintenance that is required to achieve sustainable building performance, efficient building management methods are required. Even though the demand for maintenance systems is increasing, current maintenance work for high-rise buildings mostly uses conventional ropes and gondolas that pose a high risk of accidents and exhibit poor performance and efficiency. Thus, there is an urgent need to develop an automation robot system that can reduce accidents and improve the maintenance efficiency of the conventional high-rise building façade maintenance system. As a preceding work for the development of an automation robot system, this study classified and analyzed the work processes of actual construction sites and proposed basic techniques for the work mechanisms of the robot system by investigating the motions of cleaning workers.

  • PDF