Identification of Expanding the Usability of the Water Resources in Hwacheon Dam System Due to the Flood Surcharging Effects of Peace Dam (평화의 댐 흥수지체 효과에 따른 화천댐 계통 이수 능력의 증대에 대한 검정)

  • Yu, Ju-Hwan;Park, Chang-Geun;Jo, Hyo-Seop
    • Journal of Korea Water Resources Association
    • /
    • v.34 no.6
    • /
    • pp.617-625
    • /
    • 2001
  • Peace dam constructed against the water attack had stopped in the first step, linked with Hwacheon dam through bypass tunnels and had an effect of flood surcharging in its pocket on Hwacheon dam downstream. To study the utility of Peace dam, the flood control effects of Peace dam and the restricted water level (RWL) in Hwacheon dam were reviewed and identified with operating Hwacheon dam system. Analysing the results the ideas of expanding the usability of the water resources in Hwacheon dam system were suggested. To do that, the criteria and the model of reservoir operation were established frist and the optimization of the operation have done. Based on the results the performance of the optimization was evaluated as an reference coefficient with relative value of the registered data to the optimized. And examining several alternatives for the RWL in Hwacheon reservoir operation made more feasible RWL suggested. And its economic benefit was also reckoned.

  • PDF

The Effect of Flood Discharge due to Dam Breach on Downstream Channel (댐붕괴시 홍수가 하천하류에 미치는 영향)

  • Ahn, Sang-Jin;Lee, Jun-Geun;Yeon, In-Sung;You, Hyung-Gyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1666-1670
    • /
    • 2006
  • The purpose of this study is to analyze how a downstream channel is affected in case of hypothetical dam failure. The object of it is Hwacheon dam basin within the basin of North Han river. This study has analyzed the influence on Pyeonghwa(Peace) dam and Hwacheon dam supposing that the Imnam dam in North Korea on the upper stream of North Han river is failed hypothetically at the MFWL(maximum flood water level) by a deluge of rain. The model applied at the main study is NWS(National Weather Service) FLDWAV(Flood Wave Routing Model). Dam breach characteristics data are analyzed by making nine hypothetical scenarios on the basis of other studies on the shape and size of dam breach, time of failure and so on. Expected peak discharge through the breach is verified to have the propriety in comparison with empirical function which is developed on the basis of the case of dam breach in the foreign countries and it is observed that peak discharge is more increasing, as the time of breach gets shorter and the breach width gets bigger. As a result of main study, even though the Imnam dam is hypothetically failed down, there has no influence on the Hwacheon dam of the downstream as the extended Pyeonghwa dam on the downstream controls the volume of discharge properly.

  • PDF

Analysis on Hydraulic Characteristics in Down Stream of Dam for Fishway Construction (어도설치를 위한 댐하류 수리특성 분석)

  • Maeng, Seung-Jin;Lee, Bae-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.49 no.5
    • /
    • pp.11-20
    • /
    • 2007
  • In this study, we reviewed the optimal space for the fishway and fish storage establishment in the section between the downstream of the Hwacheon dam and the confluence of the Pungsan river. The hydraulic stability of these facilities was also examined. In the section between the downstream of Hwacheon dam and the confluence of Pungsan river, the release flow of Hwacheon dam was set at $5,495m^3/s,\;6,110m^3/s$ and $7,537m^3/s$, and numerical simulations were executed for each instance using the HEC-RAS model and RMA-2. In the analysis of the flow velocity distributions in the subject section by release flows of Hwacheon dam, it was shown that there was over 5.0m/s of high flow velocity at Sta. $#1{\sim}Sta.$ #3, Sta. $#4{\sim}Sta.$ #6, and Sta. $#12{\sim}Sta.$ #13 of the sections analyzed in this study. The Sta. $#0{\sim}Sta.$ #1 was considered appropriate for the fishway and fish storage establishment. As seen in the results of the numerical stability review by release flow conditions of Hwacheon dam subject to the selected available areas fur fishway and fish storage, the topographically available section for the establishment of fishway and fish storage exists at Sta. $#1{\sim}Sta.$ #3 when the release flow of Hwacheon dam is $5,495m^3/s$, whereas Sta. $#0{\sim}Sta.$ #1 should be reviewed for the subject section for the establishment of fishway at release flows of $6,110m^3/s$ and $7,537m^3/s$, in addition to the figures gathered at the $5,495m^3/s$ release flow. Finally, the available section for the establishment of fishway and fish storage was determined to be Sta. $#0{\sim}Sta.$ #3. Further, if fishway and fish storage are established in the outer bank within this section, the high flow velocity section should be avoided. An alternative would be to establish for the fishway in the inner band on the section of Sta. #1 or Sta. #3.

Utilization of Peace Dam for Conservation Purpose (이수측면에서 평화의댐 활용방안 연구)

  • Yi, Jae-Eung;Lim, Dong-Sun;Lee, Jong-Tae
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.8
    • /
    • pp.653-662
    • /
    • 2004
  • In this study, the method of Increasing the flood control as well as conservation effects is studied by joint operation of Hwacheon and Peace Dam. After completing the second phase of the construction of the Peace Dam, the dam crest height will be increased from 225m and the storage capacity will also be increased. If storage capacity is increased and gates are installed, it will assist not only flood control but also conservation of the entire Han river basin. Considering the change of conservation levels, the change of the restricted water level of the Hwacheon Dam in flood season, and the inflow change into the Peace Dam through the simulated reservoir operation, the annual average power of Hwacheon Dam with 95% reliability, annual firm power, the volume of water supply is calculated. As a result, when the conservation level of the Peace Dam and the restricted water level of the Hwacheon Dam are increased, the generation capacity will be improved. However, even though the inflow decrease, the generation capacity will not be affected. If the inflow decrease under the same conditions, the water supply capability will be reduced to the range from 35% to 40%. It is necessary to increase conservation level to keep the same water supply capability.

The Characteristics of Runoff for Hwacheon dam watershed (화천댐 상류유역의 유출거동 특성)

  • Kim, Nam-Won;Lee, Jeong-Eun
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.12
    • /
    • pp.1069-1077
    • /
    • 2009
  • Lately, it is an important concern in water resources research to maintain a stable water supply according to a future climate change and an increase in water use. In Han-River basin, approximately 10 % of water resources that is provided the capital region (Gyeonggi, Seoul etc.) has been reduced as a consequence of the construction of Imnam Dam (storage volume: 27 billion $m^3$) located in the upper Hwacheon Dam upstream area. Therefore, streamflows have decreased in Bukhangang basin, but it could not be evaluated quantitatively. In this study, SWAT-K which is the physically based long-term runoff simulation model, was used in order to evaluate the effect of Imnam Dam on the reduced inflow to Hwacheon Dam according to the change of hydrological condition in the upstream area of Hwacheon Dam. For the model input data of North Korea area, meteorological data of GTS (Global Telecommunication System) were used, and soil maps by FAO/UNESCO (2003) were applied. Temporal variations of water resources is investigated with comparison of observed and simulated inflows at Hawcheon Dam site. Also, annual, monthly, seasonal decreases in water resources were evaluated using the flow duration analysis of simulated streamflows with or without Imnam dam.

Empirical recommendation for planning the observation density of water level in a reservoir (Case study on Hwacheon Dam in Korea) (저수지 수위 관측밀도 제안: 화천댐 중심으로)

  • Hwang-Bo, Jong Gu;Hong, Jun Hyuk
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.10
    • /
    • pp.835-841
    • /
    • 2022
  • The water level of the dam reservoir is an important data in the operation of the dam. reservoir storage can be calculated by using water levels or prepared for disasters such as drought and floods. However, the water level is measured near the dam, making it difficult to represent a reservoir with a large area, and there is a high possibility that the water surface will be distorted due to discharge. Furthermore, the results of the survey showed that the water level of the reservoir is irregular rather than constant, and the water level of the reservoir is repeatedly falling and rising by section. In order to calculate such a complex and irregular representative water level, the water level observation density of the reservoir must be increased. In this study, we tried to derive the optimum water level observation density for Hwacheon Dam. A reasonable water level measurement density was derived by investigating the water level elevation of the reservoir and statistically analyzing it. The observation density may vary depending on the size of the reservoir, so the same analysis was conducted on the Goesan Dam and Boseonggang Dam. According to the results, four Hwacheon dams, three Goesan dams, and seven Boseong River dams are needed for observation density.

Identification of yearly variation in Hwacheon dam inflow using trend analysis and hydrological sensitivity method (경향성 분석과 수문학적 민감도 기법을 이용한 화천댐 유입량의 연별 변동량 규명)

  • Kim, Sang Ug;Lee, Cheol-Eung
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.5
    • /
    • pp.425-438
    • /
    • 2018
  • Existing studies that analyze the causes and effects of water circulation use mostly rainfall - runoff models, which requires much effort in model development, calibration and verification. In this study, hydrological sensitivity analysis which can separate quantitatively the impacts by natural factors and anthropogenic factor was applied to the Hwacheon dam upper basin from 1967 to 2017. As a result of using various variable change point detection methods, 1999 was detected as a statistically significant change point. Especially, based on the hydrological sensitivity analysis using 5 Budyko based functions, it was estimated that the average inflow reduction amount by Imnam dam construction was $1.890\;billion\;m^3/year$. This results in this study was slightly larger than the those by existing researchers due to increase of rainfall and decrease of Hwacheon dam inflow. In future, it was suggested that effective water management measures were needed to resolve theses problems. Especially, it can be suggested that the monthly or seasonal analysis should be performed and also the prediction of discharge for future climate change should be considered to establish resonable measures.

Evaluation of instream flow in Han river according to the Imnam dam operation in North Korea (북한 임남댐 운영에 따른 북한강 하천유지유량 평가)

  • Lee, Jae-Kyoung;Jang, Suk Hwan;Ihm, Nam-Jae
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.1
    • /
    • pp.71-82
    • /
    • 2020
  • The objective of this study is to evaluate the instream flow in the North Han River basin according to the operation of Imnam Dam in North Korea. The water budget and instream flow satisfaction were analyzed using hourly, daily and monthly data of Water Management Information System (WAMIS) from Jan. 1991 to Dec. 2018. As a analysis result of water budget using hourly data in the North Han River basin, although inflows compared with dam release in the upstream basin of Peace Dam-Hwacheon Dam and Chuncheon Dam-Soyanggang Dam-Uiam Dam were calculated as negative values, the reasonable results using daily and monthly average data were estimated. It showed that the results of water budget analysis of dam inflow and total release may be different by time units of data. The monthly average inflow of Hwacheon Dam decreased significantly after the construction in 2003 of Imnam Dam, which confirmed that the operation of Imnam Dam had a significant effect on the dams in the North Han River basin. The operation of Imnam Dam is one of the main reasons for the lack of instream flow and total shortage amounts and shortage period increased up to +330% due to the decrease in inflow and total release of dams in the North Han River water after the operation of Imnam Dam. It is necessary to study various plans to secure instream flow including transboundary river management

A Study on Low-flow Frequency Analysis Using Dam Inflow (댐 유입량 자료를 이용한 갈수빈도해석에 대한 연구)

  • Jung, Younghun;Nam, Woo Sung;Shin, Hongjoon;Heo, Jun-Haeng
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6B
    • /
    • pp.363-371
    • /
    • 2012
  • In this study, the low-flow frequency analysis was performed to determine the low-flow standard of dam maintenance flow for Hwacheon and Chuncheon dams. For this purpose, two methods (case 1: low-flow frequency analysis using the monthly inflow data of the specified return periods, case 2: low-flow frequency analysis using the difference of monthly accumulated inflow) were applied. As a result, it is found that the monthly inflow data of the return periods by reflecting the statistical characteristics of Hwacheon and Chuncheon dams can be utilized to determine the standard of maintenance flow or water level.

Unsteady Flow Model Including a Dam Operation Rule for Flood Control as Internal Boundary Condition (홍수시 댐 운영방안을 내부 경계조건으로 포함하는 부정류 계산모형)

  • Yu, Myoung-Kwan;Jun, Kyung-Soo
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.12
    • /
    • pp.1043-1054
    • /
    • 2004
  • An unsteady flow model for channel network including various internal boundaries if developed. It is a multiply-connected network model based on the Preissmann's four-point scheme and the Newton-Raphson method, where looped double-sweep algorithm is used. The model is capable of simulating flow through hydraulic structures such as dams and submerged weirs. It can also simulate automatic reservoir operation method (Auto ROM) for flood control, that is to maintain a target water level, by incorporating the strategy to the unsteady flow model as internal boundary condition. The model is applied to the Han River system that includes the downstream reaches of Choongju dam and Hwacheon dam as well as the downstream reach of the Paldang dam. Roughness coefficient for the downstream reach of Choongju dam is estimated. Automatic ROM is presumed for the Paldang, Chungpyung, Euiam, and Choonchun dams. The model is tested using historical flood records, and the flood control strategy is successfully simulated.