• Title/Summary/Keyword: Hydropower dam

Search Result 66, Processing Time 0.023 seconds

Displacement aging component-based stability analysis for the concrete dam

  • Huang, Xiaofei;Zheng, Dongjian;Yang, Meng;Gu, Hao;Su, Huaizhi;Cui, Xinbo;Cao, Wenhan
    • Geomechanics and Engineering
    • /
    • v.14 no.3
    • /
    • pp.241-246
    • /
    • 2018
  • The displacement monitoring data series reconstruction method was developed under equal water level effects based on displacement monitoring data of concrete dams. A dam displacement variation equation was set up under the action of temperature and aging factors by optimized analysis techniques and then the dam displacement hydraulic pressure components can be separated. Through the dynamic adjustment of temperature and aging effect factors, the aging component isolation method of dam displacement was developed. Utilizing the isolated dam displacement aging components, the dam stability model was established. Then, the dam stability criterion was put forward based on convergence and divergence of dam displacement aging components and catastrophe theory. The validity of the proposed method was finally verified combined with the case study.

An analytical approach of behavior change for concrete dam by panel data model

  • Gu, Hao;Yang, Meng;Gu, Chongshi;Cao, Wenhan;Huang, Xiaofei;Su, Huaizhi
    • Steel and Composite Structures
    • /
    • v.36 no.5
    • /
    • pp.521-531
    • /
    • 2020
  • The behavior variation of concrete dam is investigated, based on a new method for analyzing the data model of concrete dam in service process for the limitation of wavelet transform for solving concrete dam service process model. The study takes into account the time and position of behavior change during the process of concrete dam service. There is no dependence on the effect quantity for overcoming the shortcomings of the traditional identification method. The panel data model is firstly proposed for analyzing the behavior change of composite concrete dam. The change-point theory is used to identify whether the behavior of concrete dams changes during service. The phase space reconstruction technique is used to reconstruct the phase plane of the trend effect component. The time dimension method is used to solve the construction of multi-transformation model of composite panel data. An existing 76.3-m-high dam is used to investigate some key issues on the behavior change. Emphasis is placed on conversion time and location for three time periods consistent with the practical analysis report for evaluating the validity of the analysis method of the behavior variation of concrete dams presented in this paper.

Analysis of Greenhouse Gas Research Trends of Hydropower Dams: Focusing on Foreign Cases (수력발전댐에서 온실가스 연구 동향 분석 : 국외 사례를 중심으로)

  • Park, Kyoung-deok;Jo, Won Gi;So, Yoon Hwan;Kang, Dong-hwan
    • Journal of Environmental Science International
    • /
    • v.31 no.2
    • /
    • pp.195-213
    • /
    • 2022
  • This research summarizes the generating factors of greenhouse gas (carbon dioxide, methane, nitrous oxide) in hydropower dams and related domestic/foreign researches. Microorganisms and eutrophication are the main factors in greenhouse gases in hydropower dam reservoirs. The greenhouse gas emission from the hydropower dam is affected by meteorological factors and dam operation periods, and greenhouse gases are also emitted from the outlets. The fluxes of greenhouse gas emission from the hydropower dams were -926~180,806 mg CO2 m-2d-1, -0.19~3800 mg CH4 m-2d-1, and 0.01~16.1 mg N2O m-2d-1. In South Korea, the study on the greenhouse gas emission from Korean hydropower dams has been rarely, and therefore it is inquired. This research suggested the methods on the greenhouse gas emission from Korean hydropower dams and flux calculation.

A diagnostic approach for concrete dam deformation monitoring

  • Hao Gu;Zihan Jiang;Meng Yang;Li Shi;Xi Lu;Wenhan Cao;Kun Zhou;Lei Tang
    • Steel and Composite Structures
    • /
    • v.49 no.6
    • /
    • pp.701-711
    • /
    • 2023
  • In order to fully reflect variation characteristics of composite concrete dam health state, the monitoring data is applied to diagnose composite concrete dam health state. Composite concrete dam lesion development to wreckage is a precursor, and its health status can be judged. The monitoring data are generally non-linear and unsteady time series, which contain chaotic information that cannot be characterized. Thus, it could generate huge influence for the construction of monitoring models and the formulation of corresponding health diagnostic indicators. This multi-scale diagnosis process is from point to whole. Chaotic characteristics are often contained in the monitoring data. If chaotic characteristics could be extracted for reflecting concrete dam health state and the corresponding diagnostic indicators will be formulated, the theory and method of diagnosing concrete dam health state can be huge improved. Therefore, the chaotic characteristics of monitoring data are considered. And, the extracting method of the chaotic components is studied from monitoring data based on fuzzy dynamic cross-correlation factor method. Finally, a method is proposed for formulating composite concrete dam health state indicators. This method can effectively distinguish chaotic systems from deterministic systems and reflect the health state of concrete dam in service.

Evaluation of hydropower dam water supply capacity (II): estimation of water supply yield range of hydropower dams considering probabilistic inflow (발전용댐 이수능력 평가 연구(II): 확률론적 유입량을 고려한 발전용댐 용수공급능력 범위 산정)

  • Jeong, Gimoon;Kang, Doosun;Kim, Dong Hyun;Lee, Seung Oh;Kim, Taesoon
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.7
    • /
    • pp.515-529
    • /
    • 2022
  • Identifying the available water resources amount is an essential process in establishing a sustainable water resources management plan. Dam facility is a major infrastructure storing and supplying water during the dry season, and the water supply yield of the dam varies depending on dam inflow conditions or operation rule. In South Korea, water supply yield of dam is calculated by reservoir simulation based on observed historical dam inflow data. However, the water supply capacity of a dam can be underestimated or overestimated depending on the existence of historical drought events during the simulation period. In this study, probabilistic inflow data was generated and used to estimate the appropriate range of the water supply yield of hydropower dams. That is, a method for estimating the probabilistic dam inflow that fluctuates according to climatic and socio-economic conditions and the range of water supply yield for hydropower dams was presented, and applied to hydropower dams located in the Han river in South Korea. It is expected that the understanding water supply yield of the hydropower dams will become more important to respond to climate change in the future, and this study will contribute to national water resources management planning by providing potential range of water supply yield of hydropower dams.

Assessment of the crest cracks of the Pubugou rockfill dam based on parameters back analysis

  • Zhou, Wei;Li, Shao-Lin;Ma, Gang;Chang, Xiao-Lin;Cheng, Yong-Gang;Ma, Xing
    • Geomechanics and Engineering
    • /
    • v.11 no.4
    • /
    • pp.571-585
    • /
    • 2016
  • The crest of the Pubugou central core rockfill dam (CCRD) cracked in the first and second impounding periods. To evaluate the safety of the Pubugou CCRD, an inversion analysis of the constitutive model parameters for rockfill materials is performed based on the in situ deformation monitoring data. The aim of this work is to truly reflect the deformation state of the Pubugou CCRD and determine the causes of the dam crest cracks. A novel real-coded genetic algorithm based upon the differences in gene fragments (DGFX) is proposed. It is used in combination with the radial based function neural network (RBFNN) to perform the parameters back analysis. The simulated settlements show good agreements with the monitoring data, illustrating that the back analysis is reasonable and accurate. Furthermore, the deformation gradient of the dam crest has been analysed. The dam crest has a great possibility of cracking due to the uncoordinated deformation, which agrees well with the field investigation. The deformation gradient decreases to the value lower than the critical one and reaches a stable state after the second full reservoir.

Hydraulic and structural considerations of dam's spillway - a case study of Karkheh Dam, Andimeshk, Iran

  • Faridmehr, Iman;Jokar, Mohammad Javadi;Yazdanipour, Mohammadreza;Kolahchi, Ali
    • Structural Monitoring and Maintenance
    • /
    • v.6 no.1
    • /
    • pp.1-17
    • /
    • 2019
  • Preserving reservoir safety has recognized to be important for the public where a vast majority of dams are located upstream of greatly populated cities and industrialized areas. Buckling, floatation and cavitation have caused failure in the spillway gates and conveyance features during past catastrophic events; showed their vulnerability and need for regular inspection along with reviewing design calculations to ensure the spillway meet current design standards. This paper investigates the hydraulic and structural consideration of dam's spillway by evaluating the data of Karkheh Dam's. Discharge capacity, flood routings and cavitation damage risk were main features for hydraulic considerations where hydrostatic and hydrodynamic forces and stability conditions were considered in structural considerations.

Analysis of Fluid-Structure Interaction for Development of Korean Inflatable Rubber Dams for Small Hydropower (소수력 발전용 한국형 공기주입식 고무댐 개발을 위한 유체-구조 연성 해석)

  • Hwang, Tae-Gyu;Kim, Jin-Gu
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.32 no.8
    • /
    • pp.1221-1230
    • /
    • 2008
  • Inflatable rubber dams are used for controlling flood, impounding water for recreations, preventing beach erosions, diverting water for irrigations, and generating hydropower. They are long, flexible, inflated with air, cylindrical structures on a rigid horizontal foundation such as concrete. The dam is modeled as an elastic shell inflated with air. The mechanical behaviors of the inflated dam model were investigated by using the finite element method. The analysis process such as One Way Coupling Fluid-Structure Interaction consists of two steps. First, the influences of the fluid side were investigated, viz, the shape changes of the inflated rubber dam due to the fluid motions was captured when the height of the dam was 30cm with air pressure 0.01MPa, at which the pressure distributions over the surface of the dam were calculated. And next, the structural deformations were calculated using the pressure distributions. The initial inlet velocity for flow field was set to 0.1m/s. The structural deformation behaviors were investigated. The final research goal is to develop a Korean Inflatable Rubber Dam to be used for generating small hydropower.

Classification of hydropower dam in North-han River based on water storage characteristics (저류특성을 고려한 북한강수계 발전용댐의 유형 구분방안 제시)

  • Choi, Jeongwook;Jeong, Gimoon;Kang, Doosun;Ahn, Jeonghwan;Kim, Taesoon
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.8
    • /
    • pp.567-576
    • /
    • 2021
  • Climate change threatens the security of domestic water resources in South Korea. To overcome the potential water shortage, various approaches are being studied by alterning the operation of dams or by integrated operation of multiple dams and reservoirs. However, most of the related researches were developed and applied for multi-purpose dams, and few studies were conducted for the hydropower dams. The main purpose of the hydropower dam is to generate electric energy; however, the potential water shortage due to prolonged droughts brings the idea to supply water from the hydropower dam in the basin. To that end, it is required to estimate the water supply ability of the hydropower dams. In this study, we proposed a methodology to classify the hydropower dam into a "storage-type" and "run-of-river type" dam. The proposed approach was demonstrated using the hydropower dams located in North-han River basin. The results of this study are expected to contribute for further analysis of the hydropower dams, such as evaluation of water supply capacity and drought mitigation purpose operation of the hydropower dams.