• Title/Summary/Keyword: INSTALLATION MANAGEMENT

Search Result 1,133, Processing Time 0.037 seconds

An Investigation into the Actual Condition of Electrical Equipments Installation and Management for Application to IEC60364 in Korea (국제 건축전기설비기준(IEC60364)의 국내 적용 실태조사)

  • Jung, Jin-Soo;Han, Woon-Ki
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.10
    • /
    • pp.134-140
    • /
    • 2008
  • In this paper an Investigation into the actual condition of electrical equipments installation & management and check the problem of application to IEC60364 in korea construction by the electrical installation technical regulation. building equipments by the electrical installation technical regulation are almost same TT system but the electrical installation technical regulation does not contact with protective conductor(PE conductor). This study derive a problem and resent the solving method of problem causing does not fully understand of IEC60364, mix electrical installation technical regulation and IEC60364 by the actual condition of electrical equipments installation & management in korea.

A Study on the Installation Readiness Management Method of Offshore Plant using CAD Information (CAD 정보를 활용한 해양 배관재 설치 준비율 관리 방법에 관한 연구)

  • Park, JungGoo;Kim, HoJung;Kim, MinGyu;Park, JiChan
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.56 no.2
    • /
    • pp.152-160
    • /
    • 2019
  • In this study, we propose a piping material supply management method using CAD system. The piping materials installed in super large offshore plants have very complicated connection conditions. Therefore, it is very difficult to determine the order of receipt of a large number of installation materials. Therefore, we have developed a system that can automatically check the preparation rate of installation materials prior to the installation process. We have developed an algorithm to obtain connection information among installation items from PDMS system. We have developed an algorithm that can determine the order of installation materials to be installed using the connection information. The order of the installation material is determined by taking into account the constraint conditions for the complete installation of the piping material. We confirm the effectiveness of the developed algorithms in the operating system. This system is also used to manage installation schedules and plan the installation manpower.

Design and Implementation of an Ubiquitous Manufacture Execution System based on RFID/USN (RFID/USN 기반의 유비쿼터스 제조실행시스템 설계 및 구현)

  • Jung, Se Hoon;Kim, Kyung Jong;Sim, Chun Bo
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.6 no.4
    • /
    • pp.21-31
    • /
    • 2010
  • A manufacturing execution system in the process according to automation system of installation management has been growing interest about effective system design and effective system manage. In this paper, we propose an ubiquitous Manufacturing Execution System based on RFID/USN for checkup monitoring and history management of installation in manufacturing execution systems. For this, we design and implement installation history and statistics management system based on RFID grafting RFID for efficient installation equipment history and statistics management of ubiquitous Manufacturing Execution System, and was implemented checkup monitoring system based on USN using temperature sensor, humidity sensor, hydraulic pressure sensor for failure prevention of ubiquitous Manufacturing Execution System. And proposed ubiquitous Manufacturing Execution System is implemented based on JSP for access through Web in real time.

THE DEVELOPMENT OF A CURTAIN WALL INSTALLATION ROBOT THROUGH THE ANALYSIS OF EXISTING CONSTRUCTION PROCESSES

  • Seung-Nam Yu ;Chong-Ho Choi ;Seung-Yel Lee;Chang-Soo Han
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.520-526
    • /
    • 2005
  • Automation in construction has been restricted to special classes of tasks. Curtain walls can be handled like standard construction materials; they are heavy but breakable, and are large but require precise installation. These characteristics make the installation of curtain walls ideal for robotic automation. There are two methods for developing construction robots: The first is approving the robot performance and applying it to the current construction methods. The second is admitting the limitation of the current robot technology and trying to optimize the current method of construction to apply the robot system. In this study, we derived the performance requirements of a curtain wall-installation robot. We also tested this robot at a real construction site and evaluated its performance. Finally, the results were analyzed, and we proposed additional research.

  • PDF

A survey on installation, management, and usability of automated external defibrillators - Focused on apartments with over 500 households in Chungnam (자동심장충격기 설치현황 및 관리실태와 사용능력조사 - 충청남도 내 500세대 이상 아파트를 중심으로)

  • Jung, Jun-Ho
    • The Korean Journal of Emergency Medical Services
    • /
    • v.21 no.3
    • /
    • pp.73-84
    • /
    • 2017
  • Purpose: The purpose of this study was to investigate the installation, management, and usability of automated external defibrillators (AED) installed in the apartments with over 500 households in Chungnam. Methods: The survey included 52 apartments with over 500 households having AED in Chungnam from July 1 to August 20, 2017. The information of AED was taken from the Chungnam Provincial Office. Results: The access and use of AED was closely affected by AED installation location, locking devices, lack of publicity, and AED use education for the residents. Conclusion: Efficient education on the use and management of AED for residents of the apartments is necessary.

Standard and Guideline for Installation and Management of Earthquake Instruments for Each Facilities (시설물별 지진응답계측기 설치 운영에 관한 기준 및 지침)

  • 김재관
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2000.04a
    • /
    • pp.458-467
    • /
    • 2000
  • The standard of performance-based seismic design accepted by Ministry of Construction and Transport requires to install and manage earthquake instruments for the facilities of seismic category I and to acquire earthquake response data of these facilities at earthquake events. So detailed standard and guideline for installation and management of earthquake instruments for each facilities according to the seismic design standard are getting ready. This paper presents the part of installation locations of sensors in that detaile standard and guideline.

  • PDF

A Research on the Actual Operating Condition of Guardlamps in Korea (국내 보안등 운용실태 조사)

  • Jung, Jong-Wook;Jung, Jin-Soo;Kim, Sun-Gu
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.212-215
    • /
    • 2008
  • In this paper, the recent technologies of a guardlamp are surveyed and the research on the actual condition of the management and maintenance is carried out. In addition, this paper intends to arouse people's attention to the electrical disasters caused by neglecting the installation, operation, management and maintenance of the guardlamp. In the process of the research, a field survey, a meeting of interested persons and manufacturers were performed and their opinions were reflected.

  • PDF

Management after installation of artificial fish reefs -Present Condition and Development Scheme- (인공어초 사후관리 현황과 발전방향)

  • Ahn Seung-Hwan;Kim Dong-Sun;Park Gyeong-Won;Lee Sung-il
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2005.11a
    • /
    • pp.139-141
    • /
    • 2005
  • It is important to manage artificial fish reefs with installation for restoration. we made survey for installation's condition(location, amount etc), fish community and amount of fishing net around installation area(6,142ha) in Yeosu of artificial fish reefs with side scan sonar and diving. Also we suggests better method of management after installation of artificial fish reefs.

  • PDF

A Study on the Management Plan through Performance Maintenance Analysis of Explosion-proof Facilities (방폭설비 성능유지 실태분석을 통한 관리방안 연구)

  • Kwon, Yong Jun;Byeon, Junghwan
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.8-16
    • /
    • 2020
  • In Article 311 of the Regulation on Occupational Safety and Health Standards requires the use of Korean Industrial Standards Act in accordance with the Industrial Standardization Act. However, the classification, inspection, maintenance, design, selection, and installation of explosion hazard locations for explosion and explosion prevention and internalization of 'safety' in the performance maintenance phase of electrical machinery and equipment There is no technical and institutional management plan for remodeling and alteration. Analysis of actual conditions and problems related to the installation, use, and maintenance of explosion-proof equipment, comparative analysis of domestic and international technical standards and systems, technical, institutional and administrative systems and systems related to installation, use, and maintenance of explosion-proof equipment, technical personnel and qualifications, etc. It is to propose legislation, system improvement, and technical standard establishment related to the maintenance of explosion-proof facility performance through improvement of the necessity and feasibility study for establishment of the legal status of the management site and management plan. As technical measures, KS standard revision (draft), KOSHA guide (draft) and explosion-proof facility performance maintenance manual were presented. In addition, the institutional management plan proposed the revised rule on occupational safety and health standards, the revised rule on the restriction of employment of hazardous work, and the manpower training program related to the maintenance of explosion-proof facilities and the qualification plan. Enhance safety at the installation, use, and maintenance stage of explosion-proof structured electrical machinery. It is expected to be used to classify explosion hazards, select related equipment, and to update and standardize standards related to installation, use and maintenance.