• Title/Summary/Keyword: Installation method

Search Result 3,245, Processing Time 0.041 seconds

Characteristics of Driving Efficiency and Bearing Capacity for Non-welded Long Steel Pipe Pile Method (무용접 장대강관말뚝 공법의 항타 및 지지력 특성)

  • 백규호;이상일;박진석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.381-388
    • /
    • 1999
  • The existing methods for installation of long steel pipe pile have some uneconomical problems such as increase of installation cost and period due to the welding of two piles and removal of soil plug, and decrease of driving efficiency due to the increase of driving resistance by time effect during the welding of piles and removal of soil plug, etc. Thus, in this study, new installation method for long steel pipe pile is suggested to work out the existing problems, and calibration chamber tests are peformed to investigate both driving and economical efficiency for the suggested method. The test results showed that the new installation method has increase bearing capacity as well as reduce installation cost and period for long steel pipe piles as compared with existing methods.

  • PDF

Calculation of Load on Jacket Leg during Float-over Installation of Dual Topsides using Single Vessel (단일 설치선을 사용한 2기 해양플랜트 Topside Float Over 설치 시 Jacket Leg의 하중 계산)

  • Bae, Dong-Yeol;Lee, Seung-Jae;Lee, Jaeyong
    • Journal of Ocean Engineering and Technology
    • /
    • v.29 no.2
    • /
    • pp.135-142
    • /
    • 2015
  • The float over method is the most preferred method for installing heavy topside onto a jacket platform. A very complex platform with multiple jacket structures on a specific field requires multiple installation procedures. This study validated the installation of two topsides using a single installation barge to reduce the operation and installation cost. The hydrodynamic properties of the installation barge during the installation of two topsides were calculated. The tension and fender forces during docking were investigated to show the validity of the proposed dual topside installation method. In conclusion, the operational safety of the proposed procedure was validated through the calculation of the motion of the installation vessel and loads on the jacket legs.

A Study on the Improvement of Electrode Installation for Measurement of Ground Resistance through Investigation on the Spot in Buildings (현장조사를 통한 건축물 접지저항 측정용 전극 설치의 개선에 관한 연구)

  • Gil, Hyoung-Jun;Kim, Dong-Woo;Kil, Gyung-Suk
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.5
    • /
    • pp.92-97
    • /
    • 2011
  • This paper deals with the improvement of electrode installation for measurement of ground resistance through investigation on the spot in buildings. The investigation was carried out for an earthing terminal board for measurement of ground resistance, installation of auxiliary electrode, etc. The criteria value is set up by measuring method of ground resistance in international standard. In case of inadequate installation of auxiliary electrode, a relative error is analyzed and adequate installation method of auxiliary electrode is proposed. As a consequence, it is necessary to write direction of ground and equipment, and separate auxiliary electrode for measurement of ground resistance in order to minimize measuring error.

End shape and rotation effect on steel pipe pile installation effort and bearing resistance

  • Saleem, Muhammad A.;Malik, Adnan A.;Kuwano, Jiro
    • Geomechanics and Engineering
    • /
    • v.23 no.6
    • /
    • pp.523-533
    • /
    • 2020
  • The current study focuses on the effect of the end shape of steel pipe piles on installation effort and bearing resistance using the pressing method of installation under dense ground conditions. The effect of pile rotation on the installation effort and bearing resistance is also investigated. The model steel piles with a flat end, cone end and cutting-edge end were used in this study. The test results indicated that cone end pile with the pressing method of installation required the least installation effort (load) and showed higher ultimate resistance than flat and cutting-edge end piles. However, pressing and rotation during cutting-edge end pile installation considerably reduces the installation effort (load and torque) if pile penetration in one rotation equal to the cutting-edge depth. Inclusion of rotation during pile installation reduces the ultimate bearing resistance. However, if penetration of the cutting-edge end pile equal to the cutting-edge depth in one rotation, the reduction in ultimate resistance can be minimized. In comparing the cone and cutting-edge end piles installed with pressing and rotation, the least installation effort is observed in the cutting-edge end pile installed with penetration rate equal to the cutting-edge depth per rotation.

Improvement of the PVC Window Frame Installation Method Integrated with Gangform and Field Applicability Analysis

  • Choi, Hyo-Sung;Lee, Jeong-Ho;Yoo, Huyn-Seok;Kim, Young-Suk;Han, Seung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.482-500
    • /
    • 2011
  • In apartment housing construction, window frame installation work, which is conducted after the structural framework, is very important, because its completion time directly affects the starting time of successive interior finishing works, as well as the overall construction period. Construction delays in interior finishing works might occur due to problems inherent to the conventional window frame installation method, such as the poor verticality of window frames, and the water leakage around them. The primary objective of this study is to analyze the problems of a 'Gangform integrated PVC window frame pre-installation method' based on its pilot test results. Next, this study proposes an improved conceptual model that enables the end users to enhance the field applicability of this method in terms of productivity, time, and cost. The field applicability of the proposed 'Gangform integrated PVC window frame pre-installation method' was also verified through a survey.

A Study on the Installation Readiness Management Method of Offshore Plant using CAD Information (CAD 정보를 활용한 해양 배관재 설치 준비율 관리 방법에 관한 연구)

  • Park, JungGoo;Kim, HoJung;Kim, MinGyu;Park, JiChan
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.56 no.2
    • /
    • pp.152-160
    • /
    • 2019
  • In this study, we propose a piping material supply management method using CAD system. The piping materials installed in super large offshore plants have very complicated connection conditions. Therefore, it is very difficult to determine the order of receipt of a large number of installation materials. Therefore, we have developed a system that can automatically check the preparation rate of installation materials prior to the installation process. We have developed an algorithm to obtain connection information among installation items from PDMS system. We have developed an algorithm that can determine the order of installation materials to be installed using the connection information. The order of the installation material is determined by taking into account the constraint conditions for the complete installation of the piping material. We confirm the effectiveness of the developed algorithms in the operating system. This system is also used to manage installation schedules and plan the installation manpower.

Protection Effects Associated with Installation Conditions of SPD (SPD의 설치조건이 보호효과에 미치는 영향)

  • Lee, Bok-Hee;Lee, Dong-Moon;Jeong, Dong-Cheol;Lee, Seung-Chil
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.298-302
    • /
    • 2005
  • This paper presents the protection effect of SPDs according to installation conditions. To develop the effective protection countermeasures of information and communication equipments against lightning surges, actual-sized experiments in relation to the protection effects on the installation positions of surge protective devices(SPDs), the length of branch circuit the materials and long of conduit were conducted. The best method for protecting the electronic equipments from surges is to install the SPD at the front point of the devices to be protected. The installation method of the metal conduit bonded with common ground conductor were more effective than that of the PVC conduit.

  • PDF

Characteristics of Driving Efficiency and Bearing Capacity for Long Steel Pipe Pile Method without Welding (무용접 장대강관말뚝 공법의 항타 및 지지력 특성)

  • 백규호
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.1
    • /
    • pp.235-241
    • /
    • 2000
  • The existing methods for installation of long steel pipe pile have some uneconomical problems such as increase of installation cost and period due to the welding of two piles and removal of soil plug, and decrease of driving efficiency due to the increase of driving resistance resulting from time effect during the welding of piles and removal of soil plug, etc. Thus, in this study, new installation method for long steel pipe pile is suggested to solve the existing problems, and calibration chamber tests were performed to investigate both driving and economical efficiency for the suggested method. The test results showed that the new method increased bearing capacity, and decreased the installation cost and period for long steel pipe piles compared with existing methods.

  • PDF

Riser Installation by a J-Tube Pulling Method

  • Park, H.S.;J. H. Jung
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2000.04a
    • /
    • pp.110-116
    • /
    • 2000
  • The analysis was carried out for a riser installation by a J-tube pulling method. The J-tube system components, mechanics of pull-in operation, and the theoretical background for the J-tube pull-in was investigated. A computer program was developed to calculate the pull-in force for a riser installation by a J-tube pulling method.

  • PDF