• Title/Summary/Keyword: Jointless Track Circuit

Search Result 4, Processing Time 0.018 seconds

A Study on the Design of ESJ of Jointless Track Circuit (무절연 궤도회로의 ESJ설계에 대한 연구)

  • 김정열;신석균;정용운;이기서;이길영
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.195-201
    • /
    • 2000
  • In this paper propose the new method on desig ESJ(Electrical Separation Joint) of Jointless Track Circuit. ESJ has a capability to saparate track signal electrically but enable connected a track section physically. So It is more proper to high-speed line. Because that demand a critical traveling safety and convient taking a train. In spite of existing ESJ of Jointless Track Circuit, UM7l, S-bond, According to new pole-zero placement and desgining tuining-unit It is possible to prove a independence of track-section and track-signal in new ESJ design of this paper

  • PDF

A Study on the Improvement of Test and Diagnosis Device for Audio Frequency Track Circuit (가청주파수 궤도회로의 진단 및 시험 장비 개선에 대한 연구)

  • Kang, Jang-Kyu;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.12
    • /
    • pp.147-155
    • /
    • 2010
  • We studied on performance improvement of TTM(TI21 Test Meter) that is test and diagnosis devices for jointless audio frequency track circuit on Korean electric railway TI21 standard. Upgraded devices is AD-TTM(Advanced TI21 Test Meter). This can measure alternating frequency USB(Upper signal band) and LSB(Lower signal band). In the audio frequency track circuit, ${\pm}17[Hz]$ of nominal frequency are demodulated and supplied to track relay through AND gate. It is important that measurement function which is error between USB and LSB. Need of AD-TTM will stand out in the electric railway system because this is simple and accurate rather than the former device.

A review of test norm of Non-insulated AF Track Circuit (무절연 가청주파수(AF) 궤도회로 시험기준 고찰)

  • Chang, Seok-Gahk;Lee, Chang-Young;Kwon, Sung-Tae
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1701-1706
    • /
    • 2007
  • Jointless AF(Audio Frequency) Track Circuit is more comfortable than exist joint track circuit. This electrical circuit's function is detection train on rail, and transmit information between wayside and vehicle. 'Korea Railroad Corporation' proposed for revision of the Korean railway standards(KRS SG 0038-06 R, 2006.5.16) "Non-insulated AF Track Circuit". This proposal equipment developed to extend use for station of National Railway exist line. According to test standards Korean railway safety law and its ordinances, which were committed to Korea Railroad Research Institute, the professional committee 'Railway facility sector II' have helded on January in 2007. In this investigation, the changed test norm will be review the difference of important function test standards of new version to conform effectivity and safety test procedure according to the KS A 1025.

  • PDF

An Analysis of Voltage Characteristics for LC Resonant Frequency Band of Capacitor Compensation According to Moving of Electrical Separation Equipment of AF Track Circuit (AF궤도회로의 전기적 구분 장치 설치이전에 따른 커패시터 보상으로 LC공진 주파수 대역의 전압특성 분석)

  • Won, Seo-Yeon;Choi, Jae-Sik;Park, Hun-Jue;Kim, Hie-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.8
    • /
    • pp.1466-1477
    • /
    • 2016
  • This paper analyzes the electrical characteristic such as the impedance(Z), inductance(L), and cable resistance($R_p$) according to the change of cable length in order to move the electrical sorting device for distinguishing between AF non-insulated track circuits from the center of railway to outside railway. The simulation is performed to check the voltage difference between the voltage of sender and the voltage of receiver and determine the possibility of the voltage restoration availability in the frequency filter band through the capacitor compensation. It was applied to the results of the simulation to the sorting devices installed in the actual field. It is proved the availability by checking the measured voltage characteristic according to the capacitor compensating change of $10{\mu}F$ and $16{\mu}F$ before, and after the length of cable is increased with 6 meters. Through this, the prevention of breakdown and damage to facilities and the prevention the safety-related accidents of line workers from the train are expected according to moving the sorting devices of AR non-insulated track circuits to outside railway.