Deriving Key Risk Sub-Clauses of FIDIC Conditions of Standard Subcontract -Based on FIDIC Conditions of Subcontract for Construction, edition 2011- (FIDIC 표준하도급 계약조건 핵심 리스크 세부조항 도출)

  • Hong, Seong Yeoll;Jei, Jae Yong;Seo, Sung Chul;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.3
    • /
    • pp.439-448
    • /
    • 2022
  • Recently, domestic small and medium-sized subcontractors participating in the overseas construction market are suffering from the continuous loss and damage due to the insufficient recognition of the importance of risk Sub-Clauses among conditions of subcontracts. Therefore, the need to derive risk Sub-Clauses for conditions of the subcontract has been raised, but until now, previous studies have been conducted focusing on deriving risk Sub-Clauses for standard conditions of contract for construction between the Employer and the Contractor. In this study, 52 risk Sub-Clauses were derived on the basis of the influence size of the Sub-Clauses through the Delphi technique targeting 94 Sub-Clauses of conditions of standard subcontract for construction edition 2011, issued by the International Federation of Consulting Engineers (FIDIC) and In addition, 33 key risk Sub-Clauses were finally derived through the PI Risk Matrix by Probability and Impact. The results of this study provide will useful information on key risk Sub-Clauses that need to be reviewed in advance to minimize contractual risks at the stage of bidding and signing contracts for overseas subcontract construction projects.

Deriving Key Risk Sub-Clauses for EPC/Turnkey Contract Conditions for Overseas Construction Projects - Based on FIDIC Conditions of Contract for EPC/Turnkey Projects, second edition 2017 - (해외건설공사 EPC/Turnkey 계약조건 핵심 리스크 세부조항 도출 - FIDIC Silver Book 2017년 개정판 기준으로 -)

  • Hong, Seong Yeoll;Jei, Jae Yong;Seo, Sung Chul;Park, Hyung Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.101-110
    • /
    • 2022
  • Recently, the global construction market is expected to grow at an annual average of 4.8% by 2025 and the risk of overseas construction is also expected to increase accordingly. In particular, domestic construction companies intensively participated in the EPC(Engineering, Procurement, Construction)/Turnkey project, but as a result of failing to respond to contractual risks, they have suffered losses of trillions of won in overseas business since 2013. Nevertheless, there have been not many studies on the derivation of EPC/Turnkey's contractual key risk sub-clauses. Therefore, in this study, the key risk sub-clauses were studied for the conditions of the 2017 Silver Book contract issued by the International Consulting Engineering Federation(FIDIC). To this end, 30 experts with more than 10 years of experience in international construction contracts were formed as a panel to conduct a Delphi survey on 170 sub-clauses of 21 clauses of FIDIC Silver Book to derive 62 main risk sub-clauses. In addition, the RPN(Risk Priority Number) was finally calculated using the FMEA(Failure Mode and Effect Analysis) technique, and 25 key risk sub-clauses within the Critical Risk range were derived. Through the results of this study, the practical point of view is able to refer to the contract provisions to be carefully reviewed at the bidding and contract signing stage in overseas construction projects. From an academic point of view, it provides direction and basic knowledge of how to study the contract fields used in overseas construction EPC/Turnkey projects.

Deriving Key Risk Sub-Clauses of General Conditions of FIDIC White Book - Based on FIDIC Client/Consultant Model Services Agreement, 5th edition 2017 - (FIDIC White Book 일반조건 핵심 리스크 세부조항 도출 - 피딕 클라이언트/컨설턴트 모델 서비스 계약, 2017년 5판 기준으로 -)

  • Jei, Jaeyong;Hong, Seongyeoll;Seo, Sungchul;Park, Hyungkeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.59-69
    • /
    • 2023
  • FIDIC White Book is a Model Services Agreement between the Client and the Consultant. This study aimed to derive the Key Risk Sub-Clauses out of 63 Sub-Clauses of General Conditions of the FIDIC White Book by using the Delphi technique. A panel of 40 experts with more than 10 years of experience and expertise in overseas construction services agreements and FIDIC White Book was formed, and the reliability was improved in the direction of increasing the consensus of experts through a total of three Delphi survey processes. In the first Delphi survey, a closed-type survey was conducted on the impact of risk among 63 Sub-Clauses of General Conditions on a Likert 5-point scale, and 26 main risk Sub-Clauses were derived. The Content Validity of the results of the first Delphi survey was verified with the CVR value. In the 2nd and 3rd Delphi surveys, a closed-type survey was conducted on a Likert 10-point scale for 26 main risk Sub-Clauses and the risk possibility and impact of each main risk Sub-Clause were evaluated. The reliability of the 3rd Delphi survey result was verified with the COV value. Total 14 Key Risk Sub-Clauses were derived by applying the average risk possibility and impact of each of the 26 main risk Sub-Clauses to the PI Risk Matrix. The results of deriving Key Risk Sub-Clauses showed that agreement on specific scope of service, delay management, and change management were the most important. As a result of this study, from a practical point of view, consultants of consulting companies provide guidelines that should be reviewed to minimize contractual risks when signing service contracts with clients. From an academic point of view, the direction of research on deriving key risks related to service contracts for consultants participating in overseas construction is presented.

Deriving Key Risk Sub-Clauses which the Engineer of FIDIC Red Book Shall Agree or Determine according to Sub-Clause 3.7 -based on FIDIC Conditions of Contract for Construction, Second Edition 2017- (FIDIC Red Book의 Engineer가 합의 또는 결정해야할 핵심 리스크 세부조항 도출 -FIDIC Red Book 2017년 개정판 기준으로-)

  • Jei, Jae Yong;Hong, Seong Yeoll;Seo, Sung Chul;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.239-247
    • /
    • 2023
  • The FIDIC Red Book is an international standard contract condition in which the Employer designs and the Contractor performs the construction. The Engineer of FIDIC Red Book shall agree or determine any matter or Claim in accordance with Sub-Clause 3.7 neutrally, not as an agent of the Employer. This study aimed to derive Key Risk Sub-Clauses out of 49 Sub-Clauses that the Engineer of FIDIC Red Book recently revised in 18 years shall agree or determine according to Sub-Clause 3.7 using the Delphi method. A panel of 35 experts with more than 10 years of experience and expertise in international construction contracts was formed, and through total three Delphi surveys, errors and biases were prevented in the judgment process to improve reliability. As for the research method, 49 Sub-Clauses that engineers shall agree on or determine according to Sub-Clause 3.7 of the FIDIC Red Book were investigated through the analysis of contract conditions. In order to evaluate the probability and impact of contractual risk for each 49 Sub-Clause, the Delphi survey conducted repeatedly a closed-type survey three times on a Likert 10-point scale. The results of the first Delphi survey were delivered during the second survey, and the results of the second survey were delivered to the third survey, which was re-evaluated in the direction of increasing the consensus of experts' opinions. The reliability of the Delphi 3rd survey results was verified with the COV value of the coefficient of variation. The PI Risk Matrix was applied to the average value of risk probability and impact of each of the 49 Sub-Clauses and finally, 9 Key Risk Sub-Clauses that fell within the extreme risk range were derived.

A Comparative Study on the Nominated Subcontractor (NSC) System of Building Construction Project in Asian Commonwealth of Nations - Focused on the NSC Clause Analysis of Standard Contract Forms - (아시아 지역 영연방국가의 지정하도급(NSC)제도에 관한 비교 연구 - 표준계약약관의 지정하도급자 항목분석을 중심으로 -)

  • Cho, Jaeyong;Kim, Junggon;Park, Hyeonggeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.12-22
    • /
    • 2014
  • In recent, many Korean contractors have tried to extend their business area into the overseas construction market, mainly as a result of a reduction in their domestic construction market. However in terms of risk, overseas construction projects are likely to face a number of unpredictable problems, many of which occur as a result of differences in contract cultures and construction environments between Korea and other countries. One key issue facing overseas construction projects in particular, is that of sub-contracting and control, and the way in which many countries of Commonwealth of Nations operate a unique subcontracting method well known as a nominated sub-contractor(NSC). This paper introduces the NSC system and differences as comparing among standard construction contract forms, such as JCT, SIA, HKIA and PAM. in UK and Asian Commonwealth of Nations. Also, we attempt to classify the type of the NSC system through the consideration of NSC clauses in accordance with the objection and termination of NSC contracting respectively.