• Title/Summary/Keyword: LSTF

Search Result 19, Processing Time 0.028 seconds

Uncertainty analysis of ROSA/LSTF test by RELAP5 code and PKL counterpart test concerning PWR hot leg break LOCAs

  • Takeda, Takeshi;Ohtsu, Iwao
    • Nuclear Engineering and Technology
    • /
    • v.50 no.6
    • /
    • pp.829-841
    • /
    • 2018
  • An experiment was conducted for the OECD/NEA ROSA-2 Project using the large-scale test facility (LSTF), which simulated a 17% hot leg intermediate-break loss-of-coolant accident in a pressurized water reactor (PWR). In the LSTF test, core uncovery started simultaneously with liquid level drop in crossover leg downflow-side before loop seal clearing, and water remaining occurred on the upper core plate in the upper plenum. Results of the uncertainty analysis with RELAP5/MOD3.3 code clarified the influences of the combination of multiple uncertain parameters on peak cladding temperature within the defined uncertain ranges. For studying the scaling problems to extrapolate thermal-hydraulic phenomena observed in scaled-down facilities, an experiment was performed for the OECD/NEA PKL-3 Project with the Primarkreislaufe Versuchsanlage (PKL), as a counterpart to a previous LSTF test. The LSTF test simulated a PWR 1% hot leg small-break loss-of-coolant accident with steam generator secondary-side depressurization as an accident management measure and nitrogen gas inflow. Some discrepancies appeared between the LSTF and PKL test results for the primary pressure, the core collapsed liquid level, and the cladding surface temperature probably due to effects of differences between the LSTF and the PKL in configuration, geometry, and volumetric size.

OVERVIEW OF RECENT EFFORTS THROUGH ROSA/LSTF EXPERIMENTS

  • Nakamura, Hideo;Watanabe, Tadashi;Takeda, Takeshi;Maruyama, Yu;Suzuki, Mitsuhiro
    • Nuclear Engineering and Technology
    • /
    • v.41 no.6
    • /
    • pp.753-764
    • /
    • 2009
  • JAEA started the LSTF experiments in 1985 for the fourth stage of the ROSA Program (ROSA-IV) for the LWR thermal-hydraulic safety research to identify and investigate the thermal-hydraulic phenomena and to confirm the effectiveness of ECCS during small-break LOCAs and operational transients. The LSTF experiments are underway for the ROSA-V Program and the OECD/NEA ROSA Project that intends to resolve issues in thermal-hydraulic analyses relevant to LWR safety. Six types of the LSTF experiments have been done for both the system integral and separate-effect experiments among international members from 14 countries. Results of four experiments for the ROSA Project are briefly presented with analysis by a best-estimate (BE) code and a computational fluid dynamics (CFD) code to illustrate the capability of the LSTF and codes to simulate the thermal-hydraulic phenomena that may appear during SBLOCAs and transients. The thermal-hydraulic phenomena dealt with are coolant mixing and temperature stratification, water hammer up to high system pressure, natural circulation under high core power condition, and non-condensable gas effect during asymmetric SG depressurization as an AM action.

ROSA/LSTF Test and RELAP5 Analyses on PWR Cold Leg Small-Break LOCA with Accident Management Measure and PKL Counterpart Test

  • Takeda, Takeshi;Ohtsu, Iwao
    • Nuclear Engineering and Technology
    • /
    • v.49 no.5
    • /
    • pp.928-940
    • /
    • 2017
  • An experiment using the $Prim{\ddot{a}}rkreisl{\ddot{a}}ufe$ Versuchsanlage (PKL) was performed for the OECD/NEA PKL-3 Project as a counterpart to a previous test with the large-scale test facility (LSTF) on a cold leg smallbreak loss-of-coolant accident with an accident management (AM) measure in a pressurized water reactor. Concerning the AM measure, the rate of steam generator (SG) secondary-side depressurization was controlled to achieve a primary depressurization rate of 200 K/h as a common test condition; however, the onset timings of the SG depressurization were different from each other. In both tests, rapid recovery started in the core collapsed liquid level after loop seal clearing, which caused whole core quench. Some discrepancies appeared between the LSTF and PKL test results for the core collapsed liquid level, the cladding surface temperature, and the primary pressure. The RELAP5/MOD3.3 code predicted the overall trends of the major thermal-hydraulic responses observed in the LSTF test well, and indicated a remaining problem in the prediction of primary coolant distribution. Results of uncertainty analysis for the LSTF test clarified the influences of the combination of multiple uncertain parameters on peak cladding temperature within the defined uncertain ranges.

LSTF 주증기배관 파단사고 평가

  • 이규복;손상배
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05b
    • /
    • pp.260-267
    • /
    • 1996
  • LSTF의 주증기배관 파단사고 실험(RUN SB-SL-01)에 대한 RELAP5/MOD2 해석결과를 제시하고, LSTF의 RUN SB-SL-01 실험결과 중에서 일차측과 이차측 사이의 열전달률에 촛점을 맞추어 증기발생기 이차측 및 일차계통의 압력, 온도 등과 같은 주요변수를 조사하여 RELAP5/MOD2코드의 성능을 평가하였다. 10% 주증기배관파단사고에 관한 최적 평가에서 주요 매개변수의 전체적 추세가 비교적 잘 예측되었다. 원자로압력용기 상층부에서 기포가 발생하는 기간 동안에는 계통 압력에서 작은 차이가 발생함을 알 수 있었는데, 압력차 발생은 가압기가 비어 있거나 원자로압력용기 상층부에서 기포가 발생하기 때문으로 판단된다.

  • PDF

ROSA/LSTF test and RELAP5 code analyses on PWR 1% vessel upper head small-break LOCA with accident management measure based on core exit temperature

  • Takeda, Takeshi
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1412-1420
    • /
    • 2018
  • An experiment was performed using the large-scale test facility (LSTF), which simulated a 1% vessel upper head small-break loss-of-coolant accident with an accident management (AM) measure under an assumption of total-failure of high-pressure injection (HPI) system in a pressurized water reactor (PWR). In the LSTF test, liquid level in the upper head affected break flow rate. Coolant was manually injected from the HPI system into cold legs as the AM measure when the maximum core exit temperature reached 623 K. The cladding surface temperature largely increased due to late and slow response of the core exit thermocouples. The AM measure was confirmed to be effective for the core cooling. The RELAP5/MOD3.3 code indicated insufficient prediction of primary coolant distribution. The author conducted uncertainty analysis for the LSTF test employing created phenomena identification and ranking table for each component. The author clarified that peak cladding temperature was largely dependent on the combination of multiple uncertain parameters within the defined uncertain ranges.

Investigation of PCT Behavior in IBLOCA Counterpart Tests between the ATLAS and LSTF Facilities (중형냉각재상실사고의 PCT에 대한 ATLAS와 LSTF 장치의 대응 실험 검토)

  • Kim, Yeon-Sik;Kang, Kyoung-Ho
    • Journal of Energy Engineering
    • /
    • v.28 no.3
    • /
    • pp.26-33
    • /
    • 2019
  • A comparison of CL 13% and 17% IBLOCA counterpart tests(CPTs) between the ATLAS and LSTF facilities was carried out and the behavior of peak cladding temperatures(PCTs) and related thermal hydraulic phenomena were investigated and discussed. There appeared quite a big difference in PCT behavior between the two CPTs and a further comparison of reactor coolant system design between the two facilities was performed. As a result, there was a difference in fuel alignment plate (FAP) design, e.g., one FAP in ATLAS, a combination of upper core plate and upper end box in LSTF, respectively. The FAP design mainly affects the reflux condensate behavior in IBLOCA tests and any difference in FAP design can be a possible reason for different PCT behavior between the two facilities. It should be a further study to find the reason of different PCT behvior between the two facilites.

MIDLOOP Code Analysis of a ROSA-IV/LSTF Experiment for the Loss of Residual Heat Removal System Event During Mid- loop Operation

  • Han, Kee-Soo;Lee, Cheol-Sin;Park, Chul-Jin;Kim, Hee-Cheol
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05b
    • /
    • pp.683-690
    • /
    • 1996
  • The MIDLOOP code has been developed for the evaluation of RES pressurization transients initiated from a loss-of-Residual Heat Removal System (RHRS) during mid-loop operation after reactor shutdown. It provides a fast running and realistic tool for studying parametrically the response of important plant parameters such as pressure, temperature, and level to various plant combinations of the primary side vent, makeup, and leakage procedures and the steam generator (SG) conditions. The code consists of ten nodes representing the primary and secondary sides of a nuclear power plant and can analyze the effect of air on the primary system pressurization and primary to secondary heat transfer. The analysis results of the MIDLOOP code are in good agreement with the ROSA-IV/LSTF experiment without opening in the RCS.

  • PDF

RELAP5/MOD3 Assessment Against a ROSA-IV/LSTF Loss-of-RHRS Experiment

  • Park, Chul-Jin;Han, Kee-Soo;Lee, Cheol-Sin;Kim, Hee-Cheol;Lee, Sang-Keun
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05b
    • /
    • pp.745-750
    • /
    • 1996
  • An analysis of a loss of residual heat removal system (RHRS) event during midloop operation after reactor shutdown was performed using the RELAP5/MOD3 thermal-hydraulic computer code. The experimental data of a 5% cold leg break test conducted at the ROSA-IV Large Scale Test Facility (LSTF) to simulate a main coolant pump shaft seal removal event during midloop operation of a Westinghouse-type PWR were used in the analysis. The predicted core boiling time and the peak primary system pressure showed good agreements with the measured data. Some differences between the calculational results and the experimental results were, however, found in areas of the timing of loop seal clearing and the temperature distribution in a pressurizer. Other calculational problems identified were discussed as well.

  • PDF

ROSA/LSTF test and RELAP5 code analyses on PWR steam generator tube rupture accident with recovery actions

  • Takeda, Takeshi
    • Nuclear Engineering and Technology
    • /
    • v.50 no.6
    • /
    • pp.981-988
    • /
    • 2018
  • An experiment was performed for the OECD/NEA ROSA-2 Project with the large-scale test facility (LSTF), which simulated a steam generator tube rupture (SGTR) accident due to a double-ended guillotine break of one of steam generator (SG) U-tubes with operator recovery actions in a pressurized water reactor. The relief valve of broken SG opened three times after the start of intact SG secondary-side depressurization as the recovery action. Multi-dimensional phenomena specific to the SGTR accident appeared such as significant thermal stratification in a cold leg in broken loop especially during the operation of high-pressure injection (HPI) system. The RELAP5/MOD3.3 code overpredicted the broken SG secondary-side pressure after the start of the intact SG secondary-side depressurization, and failed to calculate the cold leg fluid temperature in broken loop. The combination of the number of the ruptured SG tubes and the HPI system operation difference was found to significantly affect the primary and SG secondary-side pressures through sensitivity analyses with the RELAP5 code.

SAMPLING BASED UNCERTAINTY ANALYSIS OF 10 % HOT LEG BREAK LOCA IN LARGE SCALE TEST FACILITY

  • Sengupta, Samiran;Dubey, S.K.;Rao, R.S.;Gupta, S.K.;Raina, V.K
    • Nuclear Engineering and Technology
    • /
    • v.42 no.6
    • /
    • pp.690-703
    • /
    • 2010
  • Sampling based uncertainty analysis was carried out to quantify uncertainty in predictions of best estimate code RELAP5/MOD3.2 for a thermal hydraulic test (10% hot leg break LOCA) performed in the Large Scale Test Facility (LSTF) as a part of an IAEA coordinated research project. The nodalisation of the test facility was qualified for both steady state and transient level by systematically applying the procedures led by uncertainty methodology based on accuracy extrapolation (UMAE); uncertainty analysis was carried out using the Latin hypercube sampling (LHS) method to evaluate uncertainty for ten input parameters. Sixteen output parameters were selected for uncertainty evaluation and uncertainty band between $5^{th}$ and $95^{th}$ percentile of the output parameters were evaluated. It was observed that the uncertainty band for the primary pressure during two phase blowdown is larger than that of the remaining period. Similarly, a larger uncertainty band is observed relating to accumulator injection flow during reflood phase. Importance analysis was also carried out and standard rank regression coefficients were computed to quantify the effect of each individual input parameter on output parameters. It was observed that the break discharge coefficient is the most important uncertain parameter relating to the prediction of all the primary side parameters and that the steam generator (SG) relief pressure setting is the most important parameter in predicting the SG secondary pressure.