• Title/Summary/Keyword: Large-scale Building

Search Result 684, Processing Time 0.028 seconds

A preliminary Study on Selection of Construction Method for Roofing work in Large-Scale Structures (대공간 건축물 지붕공사의 시공기법선정을 위한 기초연구)

  • Kim, Daegil;Hong, Jooyoung;Lee, Myungdo;Eom, Jinup;Kim, Daewon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.247-248
    • /
    • 2016
  • Globally the interest of large-scale structure has been increasing for the use in various social and cultural events. However various problems for building large-scale structure in South Korea are expected in terms of construction method and site management due to the lack of experience. Construction method and planning significantly affects on making decisions. There are only theoretical approach for constructing large-scale building in domestic with the limited experience of constructing constrained size structure. Through Analytic Hierarchy Process with experts, derived decision factors mostly used construction method in construction of large-scale structure. Derived factors from this study will support making decisions for field management in constructing large-scale structure.

  • PDF

Generation of the Orthoimage with the Correction of Building Occlusion

  • Yoo, Hwan-Hee;Sohn, Duk-Jae;Park, Hong-Gi
    • Korean Journal of Geomatics
    • /
    • v.1 no.1
    • /
    • pp.7-13
    • /
    • 2001
  • Geospatial Information Systems (GIS) have been employed to systematically manage and design land use in urban areas. This has increased the need for more accurate vector and raster data. In Korea, l/l,000-scale digital maps are used as vector data for the facility management in urban areas. This has increased the need for large scale orthoimages. Orthoimages generated from aerial imagery can provide accurate information, making possible the more effective city management. However, there is a large problem in using the orthoimages, i.e., currently available conventional orthoimages have not been generated based on Digital Elevation Model (DEM) that takes into account the building heights. So this causes the displacements of building image in large scale orthoimages. The present study is an attempt to generate the large scale orthoimages based on building DEM. The semiautomatic building extraction method can detect building outlines by mouse clicking on either building roofs or corners. Building DEM, based on the outline and calculated building height, was used to produce the large scale orthoimages with the corrected building occlusion.

  • PDF

A Study on the composition of PFV(project financing vehicle) used in large-scale development project (대규모 개발사업에서의 PFV 구성에 관한 연구)

  • Kim, Eun-sung;Kim, Jae-jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.159-163
    • /
    • 2008
  • The trend of Development Projects has been changing through a few recent years. Small-scale development projects in the past were usually for building residences or officetel in a big cities. making lots of profits. These projects made not only lots of profits but also unbalance between the urban centers and the suburbs. So government made some regulations to prevent the things from being worse anymore, planned to develop the country in balance and began to lead large-scale development project such as Inno city and Newtown. At first, in this study, the phases and the characteristics of development project's change will be looked around. And then, after overview about PFV(project financing vehicle) used a lot in large-scale development projects will be seen, the better ways to use PFV in large-scale development projects are going to be proposed by considering the problems in PFV's conformation.

  • PDF

The Energy Performance Analysis of Large Scale Store Using Dynamic Thermal Analysis Simulation Program (동적열해석프로그램을 이용한 대형할인매장의 에너지 소비 특성 분석)

  • Kim, Byoung-Soo;Hong, Won-Pyo
    • Journal of the Korean Solar Energy Society
    • /
    • v.30 no.6
    • /
    • pp.44-49
    • /
    • 2010
  • The purpose of this study is to analyze the situation of energy consumption and its characteristics in large scale store. The related survey is carried out in large scale store to investigate the energy consumption and energy use trend of heating, cooling, hot water, lighting, ventilation, equipments and others. The area of large scale discount store is about $65000m^2$, located in Daejeon. For Annual Energy Analysis of building, We surveyed used energy for 1 year and simulated using a building energy simulation(TRNSYS 16). The results of this study are as follows. 1)The amount of annual total energy consumption are 18615.244MWh/yr(286.4KWh/$m^2yr$), The rate of heating, cooling and base energy(for hot water, lighting, ventilation, equipments, cooking and others) is 3054MWh/yr(47kWh/$m^2yr$), 5660.09MWh/yr(87.08kWh/$m^2yr$), 9900.47MWh/yr(152.31KWh/$m^2yr$) respectively. The total used energy is higher than others building in Korea. Especially, The energy consumption of large scale store is very depends on operating period and pattern such as space temperature, occupancy, lighting system, equipments operating schedule and etc.

3D/BIM Applications to Large-scale Complex Building Projects in Japan

  • Yamazaki, Yusuke;Tabuchi, Tou;Kataoka, Makoto;Shimazaki, Dai
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.4
    • /
    • pp.311-323
    • /
    • 2014
  • This paper introduces recent applications of three-dimensional building/construction data modeling (3D) and building information modeling (BIM) to large-scale complex building construction projects in Japan. Recently, BIM has been utilized as a tool in construction process innovation through planning, design, engineering, procurement and construction to establish a front-loading-type design building system. Firstly, the background and introduction processes of 3D and BIM are described to clarify their purposes and scopes of applications. Secondly, 3D and BIM applications for typical large-scale complex building construction projects to improve planning and management efficiency in building construction are presented. Finally, future directions and further research issues with 3D and BIM applications are proposed.

Analysis of Energy Performance & Energy Saving with Geothermal Heat Pump System Using TRNSYS Program in a Large Scale Shopping Store (TRNSYS 프로그램을 이용한 대형쇼핑매장 에너지성능해석 및 지열시스템을 도입하는 경우 에너지절약 특성분석)

  • Hong, Won-Pyo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.1
    • /
    • pp.47-56
    • /
    • 2015
  • Energy consumption in buildings is currently a real problem. That is why both assessment of energy performance and effective energy management including renewable energy system are essential. Thus, this paper focuses on a case study to analyze the energy performance and cooling & heating energy saving of a large scale shopping store in Daejeon city. The reference building is simulated by using TRNSYS dynamic simulation tool to examine its annual energy consumption. For annual energy analysis of building, one year energy consumption is surveyed in the field. The related study is carried out in large scale shopping store to investigate the energy consumption and energy use trend of heating, cooling, hot water, lighting, ventilation, equipments and other. The evaluation of energy performance of the geothermal heat pump system installed in a large scale shopping store is also analyzed by TRNSYS tool. From simulation results, it evaluated that the geothermal heat pump system is effective energy savings method in large scale shopping store.

A Study on Information Strategy Development Using Configuration Management in Large-scale Construction Project (형상관리기법을 활용한 대형 프로젝트 정보화 전략개발)

  • Won, Seo Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.66-67
    • /
    • 2018
  • Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.

  • PDF

Towards guidelines for design of loose-laid roof pavers for wind uplift

  • Mooneghi, Maryam Asghari;Irwin, Peter;Chowdhury, Arindam Gan
    • Wind and Structures
    • /
    • v.22 no.2
    • /
    • pp.133-160
    • /
    • 2016
  • Hurricanes are among the most costly natural hazards to impact buildings in coastal regions. Building roofs are designed using the wind load provisions of building codes and standards and, in the case of large buildings, wind tunnel tests. Wind permeable roof claddings like roof pavers are not well dealt with in many existing building codes and standards. The objective of this paper is to develop simple guidance in code format for design of loose-laid roof pavers. Large-scale experiments were performed to investigate the wind loading on concrete roof pavers on the flat roof of a low-rise building in Wall of Wind, a large-scale hurricane testing facility at Florida International University. They included wind blow-off tests and pressure measurements on the top and bottom surfaces of pavers. Based on the experimental results simplified guidelines are developed for design of loose-laid roof pavers against wind uplift. The guidelines are formatted so that use can be made of the existing information in codes and standards such as American Society of Civil Engineering (ASCE) 7-10 standard's pressure coefficients for components and cladding. The effects of the pavers' edge-gap to spacer height ratio and parapet height to building height ratio are included in the guidelines as adjustment factors.

Large-scale Seismic Response Analysis of Super-high-rise Steel Building Considering Soil-structure Interaction using K computer

  • Miyamura, Tomoshi;Akiba, Hiroshi;Hori, Muneo
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.1
    • /
    • pp.75-83
    • /
    • 2015
  • In the present study, the preliminary results of a large-scale seismic response analysis of a super-high-rise steel frame considering soil-structure interaction are presented. A seismic response analysis under the excitation of the JR Takatori record of the 1995 Hyogoken-Nanbu earthquake is conducted. Precise meshes of a 31-story super-high-rise steel frame and a soil region, which are constructed completely of hexahedral elements, are generated and combined. The parallel large-scale simulation is performed using K computer, which is one of the fastest supercomputers in the world. The results are visualized using an offline rendering code implemented on K computer, and the feasibility of using a very fine mesh of solid elements is investigated. The computation performance of the analysis code on K computer is also presented.

A Study on the Smoke Compartment Standards Analysis of Domestic and Abroad for Prevention of Smoke Spread in Large-Scale Buildings -Focused on the Analysis of Goyang Bus Terminal Fire Incident- (대형공간의 연기확산 방지를 위한 국내·외 방연구획 기준 분석에 관한 연구 -고양시 터미널 화재 사례 분석을 중심으로-)

  • Kim, Hye-Won;Han, Ji-Woo;Lee, Byeong-Heun;Jin, Seung-Hyeon;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.118-119
    • /
    • 2018
  • In this study, it analyses the problems of the Fire Compartment in Goyang Bus Terminal. Based on analysed data, it is confirmed the necessity of the Smoke Compartment installation for Protecting the Smoke Spread in Large-Scale Buildings using of FDS(Fire Dynamics Simulation). In addition it suggest that the necessity of Smoke Compartment application method and Development of Design Guideline.

  • PDF