Analysis and Applicability Assessment of Robotic Live-Line Electricity Distribution Technology (로봇을 활용한 배전 활선공법 기술분석 및 적용 타당성 연구)

  • Yang, Seon-Je;Kuc, Tae-Yong;Park, Choon-Sik;Seo, In-Yong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.9
    • /
    • pp.1125-1140
    • /
    • 2018
  • This paper analyzes robotic technology developed for live-line electricity distribution and its applicability to domestic environment. In doing so, available robotic systems developed for the live-line work are thoroughly investigated and compared in terms of from robotic functionality to economic feasibility. To assess the technology readiness for domestic live-line robot, the rubber gloves based direct live-line engineering methods have been also analyzed and mapped into robotic technology requisites. The results are expected as a fundamental data to help with solving the safety and economics issues when considering development and introduction of compact live-line robot for complex domestic electricity distribution environment.

Conductive Clothing Techniques and Application Status To Live Line Works in T/L (송전선로 활선작업용 도전복 기술 및 적용현황)

  • Lee, H.K.;Han, H.J.;Bang, H.K.
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.2123_2124
    • /
    • 2009
  • Nowadays live-line work is a general maintenance method in most countries. After 765kV transmission lines constructed, necessity of the live line work is on the rise, due to maintenance problems. During live line working, a line man must wear the conductive clothing for protection from electrical fields and shocks. This paper suggests about design technology and application status of a conductive clothing to live works, before developing the clothing in detail.

  • PDF

Study on the Necessity of Risk Assessment for The Live-Line working of Electrical Construction (전기공사업 활선작업의 위험성평가 필요성에 관한 고찰)

  • Choi, Seung-Dong;Hyun, So-Young;Han, Hyeong-Ju;Hong, Yong-Soo
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.04a
    • /
    • pp.719-730
    • /
    • 2011
  • The live-line works are very dangerous works on direct contacts or neighboring contacts with the distribution line. But most of domestic electrical construction companies that have performed live-line works are small-scale companies. Accordingly, safety management system and manuals to insure worker's safety haven't sufficiently had. In this paper, risk and status of accidents for the live-line works were analyzed and the necessity of introducting risk assessment for live-line works was identified by a questionnaire survey of electrical construction companies and education institutions.

  • PDF

Analysis of Electrical Safety Level Test for Barehand Work at 765kV Vertical Double Circuit Six Bundle Conductors on the Suspension String Tower Type (765kV 수직2회선 6도체 현수형 철탑에서 직접활선작업의 안전성 평가분석)

  • Kim, Dae-Sik;Han, Sang-Ok
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.57 no.3
    • /
    • pp.275-278
    • /
    • 2008
  • It has been issued that the necessity of Live line work for 765kV vertical double circuit six bundle conductors transmission line when the characteristics of transmission line, the composition of T/L and near the T/L circumstances etc. Others are considered. The Barehand method of UHV T/L is extremely dangerous work and especially it is directly related with lineman life so it is very dangerous. It should be performed several technology developments for live-line work on the UHV T/L, that should be considered such as the electrical influence on workers near the T/L, development of live-line facilities, guarantee of safety, the technical rules of live-line work, the safe method of live-line work and etc. In order to maintain the 765kV transmission lines safely by barehand work, first of all, we should know the analysis of electrical safety level test in live-line work at 765kV vertical double circuit six bundle conductors on the suspension string tower type.

Technical Feasibility Study on Live-line Maintenance Robot System for Overhead Distribution Lines (가공 배전선로 활선 정비 로봇 시스템의 기술 타당성 검토)

  • Joon-Young, Park;Yoon-Geon, Lee;Young-Sik, Jang
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.2
    • /
    • pp.49-53
    • /
    • 2022
  • The distribution live-line work method is an operation method of working in a state in which electricity flows through overhead distribution lines to minimize inconvenience to electric customers due to power failure. In June 2016, to strengthen the safety of electrical workers, Korea Electric Power Corporation announced that it would in principle abolish the rubber glove method, in which workers wore protective equipment such as rubber gloves and performed their maintenance work. In addition, KEPCO announced that it would develop a short-range live working method using smart sticks and an advanced live-line maintenance robot system where workers work without touching wires directly. This paper is a preliminary study for the development of the live-line maintenance robot system, and deals with the results of analyzing the technical feasibility of whether the live works performed by workers can be replaced by robots or not.

765kV Transmission maintenance live-line work study (765kV 송전선로 유지.보수 활선공법 고찰)

  • Choi, Han-Yeol;Min, Byeong-Wook
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.723-724
    • /
    • 2007
  • Live line work is well known for mending and maintenance of electrical power equipment. Nowadays needs of electric power supply quality require live line work In Korea, live line work is needed since 765kV transmission operation and restructure of electric power industry has changed. In other words, in case of suspension of power supply on the transmission is getting hard to keep up with efficiency of transmission operation, customer's confidence and generation-limited cost. Therefore live line work is very meaningful. As the condition of 765kV Transmission both bare hand and Helicopter live line technique must be used in moderation because of economic, geographical, environmental circumstances around steel tower.

  • PDF

Live line maintenance technique trend of UHV T/L (초고압 송전선로의 활선공법 기술 동향)

  • Lee, Dong-Il;Choi, In-Hyuk;Jung, Yoon-Hwan
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.260-264
    • /
    • 2005
  • This paper gives a basic information of live line maintenance technique of UHV T/L and introduce a technical background and trends of domestic and abroad. The importance of live line maintenance technology getting increased because the change of power system environment and maintenance conditions in korea. this paper explain the present state of the development of live line maintenance technique in korea and show a difference with advanced countries.

  • PDF

A Study on the Hazard Factor and Safety Management at Transmission Line During Live Line Works (송전선로 직접활선공법의 위험요인과 안전대책에 관한 연구)

  • Choi, Seung-Dong;Kang, Kyong-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.3
    • /
    • pp.51-66
    • /
    • 2006
  • This study was attempted to analyze risk factors and suggest accident prevention in live line works for power transmission lines to be developed and applied in Korea. Safety problem cannot but occur at development of live line works and application to the field. With respect to this, problems likely to occur in the field among works adopting methods of works including live line works for power transmission lines were investigated and analyzed through documentary survey and risk assessment method. The results are summarized as follows. A risk assessment method model was suggested. This method enables scientific and systematic development of safety control. That is, the owner may autonomously induce safety control and build risk assessment database by work process to use them as best training data for workers. Also, in the field, it may induce all workers to participate in safety program and secure safety by making workers seek for safety working method under smooth flow from looking at risk factors to accident prevention activities. It is deemed that this humble study will prevent both accident and injury likely to occur in live line works for power transmission lines.

Development of Live-line Insulator Tester and Its Application to 154kV Power Lines - Part 1 : Tester Development (활선애자점검기의 개발 및 154kV 선로에의 적용 - 제1부 : 점검기 개발)

  • Lee, Jae-Kyung;Park, Joon-Young;Cho, Byung-Hak;Oh, Ki-Yong
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.59 no.1
    • /
    • pp.83-88
    • /
    • 2010
  • A new live-line insulator tester was developed to detect faulty insulators in 154kV power transmission lines. This paper is the first part of the two-part paper and deals with its tester development. The developed tester has the following characteristics. First, it automates parts of the insulator inspection process by using a sensor and an actuator, and secondly, it sustains its weight by itself, not by a lineman. Finally, it measures the insulation resistance of an insulator together with its distribution voltage to provide more information for its analysis and diagnosis. These leads to the improvement of its operation efficiency, measurement reliability and usability. Its effectiveness was validated by live-line field tests in actual power lines.

A Study on the Characteristic of Electrical Construction Work for Prevention of Electric Shock Accident (감전재해 예방을 위한 전기공사업의 특성에 관한 연구)

  • Choi, Sang-Won
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.5
    • /
    • pp.29-34
    • /
    • 2014
  • The live line working is inherently dangerous as the workers have to work under the risk of electrical shock and most of works are carried out at height. The live line working need the some specific techniques and higher level safety measures such as a risk assessment to carry out works safely, but the electrical construction companies performed live-line working are usually small-sized companies. They have less capacity to have own safety management system. This study intended to conduct an in-depth analysis on the cause of electric shock accidents to provide basic data for policy proposing taking into considering the past eleven years for a long-term plan. And the aim of this study is to propose the policy about the equipment performance standards and/or worker's safety standards to revise the standards for preventing electric shock accidents, moreover, co-relation of the electrical work order form and on safety workings, especially electrical construction company/work.