Application of Multi-step Undervoltage Load Shedding Schemes to the KEPCO System

  • Shin, Jeong-Hoon;Nam, Su-Chul;Lee, Jae-Gul;Choy, Young-Do;Kim, Tae-Kyun;Song, Hwa-Chang
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.4
    • /
    • pp.476-484
    • /
    • 2009
  • This paper deals with improvements to the special protection schemes (SPS) which have been applied to the low probability and high impact contingencies in the Korea Electric Power Corporation (KEPCO) system since 2004. Among them, the SPS for voltage instability in the Seoul metropolitan area is considered in this paper, and is a form of event-based undervoltage load shedding with a single-step scheme. Simulation results based upon a recent event that occurred on 765kV lines show that the current setting values of the SPS have to be revised and enhanced. In addition, by applying response-based multi-step undervoltage load shedding (UVLS) schemes to severe contingencies in the system, more effective results than those of the existing single-step SPS can be obtained. Centralized and distributed UVLS schemes are considered in the simulation. ULTC-based load recovery models and over excitation limiters (OXL) for the KEPCO system are also included in the long-term voltage instability studies.

The Affections of System Stability on Replacing the Synchronous Condenser in Jeju Island (제주 동기조상기 교체에 따른 계통안정성 영향 연구)

  • Chang, Byung-Hoon;Yoon, Jong-Su;Han, Jeong-Yeol;Shim, Jeong-Woon;Kang, Sang-Gyun;Lee, Byong-Joon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.10
    • /
    • pp.1715-1720
    • /
    • 2007
  • The CSC-based HVDC system links the Jeju system to the mainland system. Because CSC-based HVDC is installed in Jeju, the reactive power is needed to transfer active power through the HVDC. In order to supply reactive power, switched capacitors and synchronous condensers are installed in Jeju system. The deterioration of established synchronous condensers, however, causes a reactive power supply capability decline and high maintenance cost. It brings about the instability of Jeju system and the incremental of maintenance and repair costs. In the future the installation of wind generators and additional HVDC system would aggravate the stability of Jeju system. Therefore, it needs to consider a countermeasure against above problems. In this paper, Analysis of several contingencies of Jeju system was peformed, and some contingencies caused voltage-reactive power problem was known. CPF method was introduced in order to make countermeasures to replace the synchronous condensers and to solve the voltage-reactive power problem. The location and capacity of reactive power sources were also decided. It could guarantee medium and long term stability of Jeju system.