• Title/Summary/Keyword: Maintenance Program

Search Result 1,234, Processing Time 0.034 seconds

Study on tooth mortality after periodontal therapy (치주 치료 후 치아 상실에 관한 연구)

  • Kim, Hyung-Seop;Seok, Jeong-Jin;Kim, Hyun-Chul;Lee, Su-Jeong;Choi, Seoung-Hwan
    • Journal of Periodontal and Implant Science
    • /
    • v.33 no.2
    • /
    • pp.215-223
    • /
    • 2003
  • The main goal of periodontal treatment is the long-term maintenance of teeth. Periodic maintenance program is need to prevent periodontal disease and maintain healthy periodontium. Hirschfeld and Wasserman(1978) studied 600 treated periodontal patients. This study categorized periodontal patients using well-maintained, downhill, extreme downhill groups. The purpose of our study is to evaluate effect of periodontal treatment and analyse tooth loss after periodontal treatment using this classification. The study population of j9 patients had been treated and maintained for mean 5.8 years. All patients were on a periodic maintenance program at 2-, 3-, 4, or 6-month intends. The avenge age of the patients at the time of original therapy was 49.6 years. To analyse tooth loss, modified classification was used on the basis of response to therapy using by Hirschfeld and Wasserman in 1978. The results were as follows : 1. 59 treated patients were lost mean 1.42 teeth per patient for 5.8 years of maintenance period. 2. Maxillary first molars were most frequently lost but mandibular lateral incisors were lost no tooth during maintenance period. 3. Tooth mortality received surgical treatment had similar to received nonsurgical treatment. 4. Tooth loss was more frequent in maxillary teeth than mandibular teeth, and posterior teeth than anterior teeth, and more frequent tendency in male than female.

Development the Preventive Maintenance Template of the Nuclear Steam Turbine based on EPRI PMBD (EPRI의 예방정비기초자료에 근거한 원전 증기터빈의 예방정비기준 개발)

  • Lee, Byoung Hak;Lee, Hyuk Soon
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.6 no.1
    • /
    • pp.1-8
    • /
    • 2010
  • The existing maintenance program is focused on time-based maintenance to inspect and repair components according to maintenance period, rather than condition-based maintenance or predictive maintenance. The preventive maintenance template of the steam turbine has been developed for optimizing maintenance procedure and improving reliability and availability of the steam turbine of nuclear power plants based on EPRI PM template methodology and EPRI technical reports about preventive maintenance.

  • PDF

Case Study on Technology and Regulation Improvement of Subway Maintenance Monitoring (지하철 유지관리 계측의 기술 및 제도 개선방안 연구)

  • 우종태;김홍석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.303-308
    • /
    • 2000
  • By means of analyzing of monitoring technology and monitoring regulation based on maintenance monitoring system installed in subway tunnel section, it needs monitoring system, development of operating program, monitoring analyzing system and development of analysis method, establishment of maintenance monitoring standard specification, and performance of responsible monitoring supervision for applying to subway monitoring maintenance effectively in future. It requires specialized monitoring and legislation of monitoring subcontract, improvement of monitoring work contract method, establishment the standard payment of monitoring, and effective calibration and correction of monitoring system in the plan of improving monitoring regulation.

  • PDF

Steam Generator Management Program (원전 증기발생기 관리프로그램)

  • Cho, Nam-Cheoul;Kim, Moo-Soo;Lee, Kwang-Woo
    • Proceedings of the KSME Conference
    • /
    • 2003.04a
    • /
    • pp.610-616
    • /
    • 2003
  • Recently, the common concern of nuclear power industry in the development of technology mitigating and preventing the aging of steam generator tubes prevails, because the trends of steam generator flaws at Uljin unit #1,2 and KSNP(Korea Standard Nuclear Power Plant) impose a burden on the operation of nuclear power plant. While the regulatory agency is demanding the establishment of the advanced general performance maintenance system, the steam generator management program adapting advanced technology is being developed which may comply with EPRI PWR SG Guidelines based on NEI 97-06 ‘ General Guidelines including all the maintenance aspects consist of the tube integrity assessment criteria, repair limit, allowable leakage level, water chemistry will be composed in order to obtain the approval of regulatory agency and be applied to Nuclear power plant early 2005. This presentation is to introduce maintenance state including SG tube degradation and main contents of advanced SG management program being developed, and futhermore update present and future plan, and estimate the alternation after the completion.

  • PDF

Development of the Quality of Service management program using the fourth generation language (제4세대 언어를 사용한 서비스품질 관리 프로그램의 개발)

  • 박순달;정호연;서정대;김태호
    • Korean Management Science Review
    • /
    • v.9 no.1
    • /
    • pp.41-52
    • /
    • 1992
  • The QOS(Quality of Service) recognized by the customer will become the most important thing under the competitive telecommunications market. Korea Telecom is going to develop many system to manage the telecommunication network, to improve the level of QOS, and to increase the revenue. Operation and Maintenance Adiministration System is one of the systems developed to meet those purposes efficiently. This system gathers qualities data from telephone offices or operation centers and analyze the results of QOS improvement activities and evaluate overall QOS. And also system makes it possible to improve the cost/effectiveness of operation and maintenance of telecommunication network. Operation and Maintenance Administration System has four functional modules, i.e., the user interface module, the database management module, the QOS management module, and the database conversion module. The purpose of this study is to develop the QOS management program, one of the four functional modules of the system,using FOCUS 4GL/DBMS. Since Operation and Maintenance Administration System is developed using FOCUS 4GL, every user can handle and maintain the system very easily and reduce system backlogs.

  • PDF

Program Slicing in the Presence of Complicated Data Structure (복잡한 자료 구조를 지니는 프로그램 슬라이싱)

  • Ryu, Ho-Yeon;Park, Joong-Yang;Park, Jae-Heung
    • The KIPS Transactions:PartD
    • /
    • v.10D no.6
    • /
    • pp.999-1010
    • /
    • 2003
  • Program slicing is s method to extract the statements from the program which have an influence on the value of a variable at a paricular point of the program. Program slicing is applied for many applications, such as program degugging, program testing, program integration, parallel program execution, software metrics, reverse engineering, and software maintenance, etc. This paper is the study to create the exact slice in the presence of Object Reference State Graph to generate more exactly static analysis information of objects in the program of the presence of complicated data structure.

The Program Development for Building Pavement Maintenance and Rehabilitation System (포장도로 유지관리 시스템 구축을 위한 프로그램 개발)

  • 조병완;태기호;한재호;최혜미;권병철
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.1009-1014
    • /
    • 2002
  • In this study, developed economical and scientific Pavement Management System(PMS) that can produce suitable maintenance method through judgement and analysis of pavement condition exactly, to overcome past unscientific pavement management limitations. First, on the basis of data of the inside and outside of the country on PMS, composed logical algorithm such as pavement condition investigation and analysis, detailed naked eye investigation, whole system estimation etc., and it verified that this algorithm is suitable system through the inside and outside of the country PMS research examples and results of detailed naked eye investigation. Also, developed easily usable PMS program and PMS_GIS program with such logical algorithm.

  • PDF

Today's Nuclear Challenge: Maintenance and Radiation Exposure

  • Willis, Chales A.
    • Nuclear Engineering and Technology
    • /
    • v.7 no.2
    • /
    • pp.159-165
    • /
    • 1975
  • The Nuclear power industry today faces a serious and rapidly emerging problem in reactor maintenance and occupational radiation exposure control. The basic problem is the need for much maintenance on nuclear power plants. The problem is seriously compounded by radiation exposure control requirements. Many studies are underway seeking solutions tut the industry is developing rapidly and new plants will not await the results of such studies. It is essential that attention be given to maintenance and exposure control in all phases of plant design, construction and operation.

  • PDF

System-Level Maintenance Strategy for Steel Bridges based on Life-Cycle Analysis (생애주기분석을 통한 강교량 시스템수준의 유지관리 전략)

  • Park, Kyung Hoon;Lee, Sang Yoon;Kim, Jung Ho;Cho, Hyo Nam;Kong, Jung Sik
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.2
    • /
    • pp.259-268
    • /
    • 2008
  • This paper proposes a method to establish an optical lifetime maintenance strategy for deteriorating bridges in consideration of life-cycle performance and cost. A program is developed based on the proposed method, which can generate optimum maintenance scenarios not only at the individual member level but also at the system level of the bridge. By applying the developed program is studied through the comparative analysis of maintenance strategies generated at each level. According to the results of comparison between maintenance strategies of the member-level analysis and system-level analysis. It is expected that the establishment of a maintenance strategy through the bridge system-level analysis considering target, members reflects practical and reasonable results.