• Title/Summary/Keyword: Man Hour

Search Result 227, Processing Time 0.029 seconds

Man-hour Reduction by Development of Library in a 3-D Design System for Plant Projects (플랜트 프로젝트용 3차원 디자인 시스템에서 라이브러리 개발을 통한 설계시간 감축)

  • Lee, Jung-Hyun;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.4
    • /
    • pp.68-72
    • /
    • 2009
  • This study discussed for library development of the 3 dimensional design system for the progressive developmental world wide plant industry. Its previous background had spatial limitation by utilizing 2 dimensional CAD. This work presented an effective mode for improving man-hour by applying with 3 dimensioal design system through theoretical definition, category, and means of basic man-hour. We researched an effective method for reducing man-hour through applied example on the actual project by comprehending affection of extra development for library on man-hour.

  • PDF

Job Improvement for Non-Fixed Order by Man-Hour Standardization (공수표준화에 의한 비정형발주형 작업에 대한 개선)

  • Kim, Dae-Sig;Cho, Myung-Hyun;Sohn, Kwon-Soo
    • Journal of Industrial Convergence
    • /
    • v.8 no.1
    • /
    • pp.19-31
    • /
    • 2010
  • The purpose of this study was to set the standard man-hour of welding work. The case study was conducted at C Tech where makes and installs conveyor. Because most of orders are non-fixed, all jobs are vary in shape and size. To conduct this study, drawings of sample were reviewed and compared with measured man-hours of welding works. As a result, the different ratio of expected require man-hour and measured man-hour was 4%. It is reasonable that the present applied efficiency of aimed man-hour is 85%.

  • PDF

A study of actual planning how to increase IT productivity by COCOMO II Model (IT산업 생산성 향상을 위한 프로젝트 실행계획 수립 방안 연구 - COCOMO II 적용사례)

  • Park, Cheol-Gu;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.2
    • /
    • pp.147-152
    • /
    • 2010
  • Project implementation plan is a blueprint that confirms project performance activities and specifies required man-hour, period and resource imput ratio. Various figures, the results of implementation plan, are predicted through estimation, and because of superiority of objectivity and repeatability, numerical formula-based estimation model is often used overseas. COCOMO model is the representative estimation model whose theories and formulas are publicized and it predicts the total man-hour required for software system development. This model is publicized in "Software Engineering Economics" written by Professor Barry Boehm of the U.S., and is the most widely applied numerical formula-based estimation model. This study is conducted to provide a series of methods that are optimal for KTDS environment by choosing COCOMO II model among various types of COCOMO models. In establishing implementation plan, COCOMO II model alone is not sufficient, it is necessary to link with and apply standard WBS system and standard man-hour. In establishing specific implementation plan, phased standard WBS system in order of the first phase of all the activities implemented in the project, Activity, Task, and Role, and the man-hour put into this should be distributed according to standard ratio from COCOMO II model's total man-hour. This study provides explainations by establishing standard WBS system and linking with COCOMO II model.

A Study on the Man-Hour Computation Based on MODAPTS in Automobile Assembly Line (MODAPTS 기반 자동차 조립공정 공수 산정에 관한 연구)

  • Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.1
    • /
    • pp.65-70
    • /
    • 2021
  • Domestic as well as global automobile manufacturers are making greater efforts in cost reduction to strengthen the competitiveness. In this study, we developed a program to effectively manage standard time of automobile assembly line, and confirm based on A-automobile factory data. For the purpose, we develop the system which is possible to manage standard time as well as calculate man-hour for automobile assembly line.

Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

A Study on the Method of Computing Standard Wartime Maintenance Man-Hour Incorporating Wartime Maintenance Condition (전장 정비환경을 고려한 전시 표준정비인시 산출방안 연구)

  • Kim, Min-Hyuk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.6
    • /
    • pp.477-483
    • /
    • 2021
  • In a military maintenance system, the standard maintenance man-hour of weapon systems is a tool to estimate the maintenance capabilities of maintenance units, provide standards for determining the maintenance needs and workload, and provide basic data for establishing a maintenance plan. The standard maintenance man-hours of major weapon systems have already been derived and used, but the standard maintenance man-hour in a wartime maintenance environment has not been computed. Therefore, the standard wartime maintenance man-hours need to be derived and This study proposes a process and method of computing the maintenance man-hours. In addition, this work suggests the criteria of collecting and screening data that is necessary for estimating the standard maintenance man-hours and introduces a methodology for analyzing the characteristics of maintenance man-hour distribution in the process. The proposed process first designs a model that reflects the wartime maintenance environment, selects statistical techniques, collects maintenance data, analyzes the descriptive statistics, estimates the distribution, and finally presents representative values of maintenance man-hour. Based on the proposed method, the standard wartime maintenance man-hours of the four weapon systems were calculated, and the distribution of the maintenance man-hours was analyzed to follow a lognormal distribution, and the method presented reliable results.

Improved Scheme to Manage Engineering Man-hour in a Plant Project (플랜트 프로젝트에서의 설계시간 관리 기법 개선 방안에 관한 연구)

  • Shin, Ji-Roh;Moon, Seung-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.5 no.1
    • /
    • pp.51-59
    • /
    • 2009
  • The global plant construction market has grown dramatically since 2000. As the market grows, domestic EPC contractors are expanding to meet its needs and have made great strides in terms of economic indicators from a decade ago. Larger projects involve a number of risk factors, such as volatile oil prices, however, and thus require quantitative and elaborate project management techniques for the ultimate success of a project's profitability. In addition, many Korean companies face difficulties in predicting potential risks and problems due to a lack of experience in dealing with the global market trend toward projects based on the Cost-re(Cost Reimbursable) contract as opposed to those based on the LSTK(Lumpsum Turnkey) contract. This study will examine methods and types of man-hour management according to plant project contract types. Further, it will explore the man-hour management system for successful completion of projects by satisfying the client's needs and enhancing the convenience in engineers' using the system. Additionally, this study will analyze the current system and identify its problems to address potential problems.

  • PDF

Shell platings manufacturing M/H inference and comparison using Artificial Neural Network and Gentic Programming (인공신경망과 유전적 프로그래밍을 이용한 선체 곡가공 M/H 추론 및 비교)

  • Shin, Yong-Wook;Ha, Duk-Ki;Jo, Moon-Hee;Kim, Su-Young
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2003.10a
    • /
    • pp.163-166
    • /
    • 2003
  • Hull form designers have to design a ship with satisfying an economical, technical and environmental demand. When it is concerned by a technical and environmental demand, there will be a economical demand left to criticize optimization. In this case, there were used to be requirements which needs to meet only a best performance not concerning about input of Human resource. Life cycle's cost contains building cost and operation cost so that now we need to check Man Hour cost in building a ship. This research shows a correlation between hull form information, i.e. curvature, length, breadth and thickness of surface and Man Hour of the Shell plating manufacture with using Artificial Neural Network and Gentic Programming. This study will support to classify initial work, to have a high assumption possible through predicting a Man Hour and to provide a guide book to infer a building cost and a economical optimization hull form.

  • PDF

A Study on the Productive Capacity Setting of Women's Jacket (여성 재킷의 생산능력 설정을 위한 연구)

  • Kim, Jin-Sun;Shim, Kyu-Nam;Oh, Soon
    • Fashion & Textile Research Journal
    • /
    • v.13 no.2
    • /
    • pp.269-278
    • /
    • 2011
  • This study aims at setting up productive capacity which can be usefully utilized for work management of apparel manufacturers. So as to achieve this goal, an apparel manufacturing company which has been operated by miniline system in Seoul was selected. Standard time and man-hour were calculated to create the accurate productive capacity by observing and measuring a work flow included cutting, sewing and finishing processes. And the result is as following. The standard time for each process was presented as cutting process 47004.5s, sewing process 671050.5s and finishing process 22426.3s. And 15284.4ms was computed as total procession man-hour per day of the manufacturer which is organized of 16 people. Also, the procession man-hour for each process was revealed as cutting process 396.7ms(2.6%), sewing process 14509.3ms(94.9%) and finishing process 378.5ms(2.5%). +Surplus was found in the productivity for each process included the cutting process(outshell, lining and seam process), the sewing process(preparation and arrangement process) and the finishing process. But, additional man-hour 52436.18ms was required because the productive capacity was calculated as -surplus(-13.9%) in the sewing process(part and assembly process). Therefore, a work schedule was planned based on the previous result. However, loading can be ideal when a capacity and a load become '0'. The object company should find the way to reduce allowance(26.25%) of the sewing process through reconstruction of consciousness and improvement in functions with analyzing works of operators. Also, they need to consider an additional supplement of the personnel.