• Title/Summary/Keyword: Map revision

Search Result 64, Processing Time 0.026 seconds

Frequent Unscheduled Revision of National Base Map with Vehicle-Based Mobile Mapping System (차량 MMS를 이용한 국가기본도 수시 수정)

  • Kim, Chang-Woo;Yun, Hong-Sic;Hwang, Jin-Sang;Jeong, Tae-Jun;Shin, Dong-Jun
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2010.04a
    • /
    • pp.311-313
    • /
    • 2010
  • This study is on the adapting vehicle-based mobile mapping system to the frequent unscheduled revision of 1:5000 scale national base map. We analyzed map layers which could be built by vehicle-based mobile mapping systems and studied surveying methods for each layers. Also, the methods of maintain surveying accuracy to satisfy accuracy standards of national base map were suggested. The maps of Yeouido, Hyangnam, and Suwon area were revised by vehicle-based mobile mapping system on a trial bases and possibility of utilizing vehicle-based mobile mapping system for map revision was analyzed. As a results it was revealed that vehicle-based mobile mapping systems were adequate for a irregular revision of national base map.

  • PDF

Benefit analysis model of the national map revision program using replacement cost method (대체비용법을 이용한 수치지형도 갱신사업의 편익분석 모형 연구)

  • Son, Hwamin;Yang, Sungchul;Ga, Chillo;Yu, Kiyun;Huh, Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.1
    • /
    • pp.79-87
    • /
    • 2013
  • This study proposed a method to analyze the economic benefit of the national map revision program using the replacement cost method. The replacement cost method measures the benefit of a project as the minimum cost to replace functions of the project with those of alternative goods or services in an existing market. Thus, the demands on 1/5,000 topographic map revision in 18 administrative tasks such as city and district management planning were surveyed in three local autonomous entities. Then the cost to alternatively fulfill the demands was estimated with the standard construction estimating system for the field surveying and surveying results in commercial GIS companies for the site investigation. With this cost estimation model, the benefit of the current national map revision program to the local autonomous entities was estimated as 265,960,999 won. And cost benefit ratios according to several revision frequencies from 0.5 to 4 year were also compared to find the optimal frequency.

Estimating the Application Possibility of High-resolution Satellite Image for Update and Revision of Digital Map (수치지도의 수정 및 갱신을 위한 고해상도 위성영상의 적용 가능성 평가)

  • 강준묵;이철희;이형석
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.20 no.3
    • /
    • pp.313-321
    • /
    • 2002
  • Supplying high-resolution satellite image, we take much interest in the update and the revision of digital map and thematic map based on the satellite image. This study presented the possibility of the update and the revision to the existing digital map on a scale of l/5,000 and 1/25,000 to take advantage of the IKONOS satellite image. We performed geometric correction to make use of the ground control points of the existing digital map in IKONOS mono-image and created ortho-image by extracting digital elevation model from three dimensional contour data and altitude on the existing digital map. We revised changed features in the method of screen digitizing by overlapping orthorectified satellite image and existing digital map and flawed features of the unchanged area on the satellite images for positional accuracy analysis. As a result, rectification error is calculated at $\pm$3.35m by RMSE. There is a good possibility of update of digital map under the scale of 1/10,000. It is possible to the update of the large scale digital map over the scale of l/5,000, as if we used the method of stereo image and ground control point surveying.

Analysis of Overlay Accuracy in Digital Topographic Map and Cadastral Information Using Ortho Image map (정사투영 영상지도에 의한 수치지형도와 지적정보의 중첩정확도 분석)

  • Kang, Joon-Mook;Choi, Jong-Hyun;Kang, Young-Mi
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.7 no.2 s.14
    • /
    • pp.57-68
    • /
    • 1999
  • In case of topographic information construction it is most important as basemap determines the success or failure of GIS It is argument that digitizing works of basemap are divided by NGIS and PBLIS. So, it have to accompany the combination and application of cadastral information for constructing a usful basemap. In this study, we generated ortho image map using 1:5,000 aerial-photography image, present the comparative analysis for the overlay accuracy and map revision of topographic and cadastral information using ortho image map to base map. So, we present application schemes for land use, environment, and city planning field as well as union database by overlaying of image map and cadastral information.

  • PDF

An Implementation of a Map Building Algorithm for Efficient Traveling of Mobile Robots (이동로봇의 효율적인 주행을 위한 맵 빌딩 알고리즘의 구현)

  • Kim, Jong-Hwa;Kim, Jin-Kyu;Lim, Jae-Kwon;Han, Seong-Bong
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.32 no.1
    • /
    • pp.184-191
    • /
    • 2008
  • In order for a mobile robot to move under unknown or uncertain environment, it must have an environmental information. In collecting environmental information, the mobile robot can use various sensors. In case of using ultrasonic sensors to collect an environmental information, it is able to comprise a low-cost environmental recognition system compared with using other sensors such as vision and laser range-finder. This paper proposes a map building algorithm which can collect environmental information using ultrasonic sensors. And also this paper suggests a traveling algorithm using environmental information which leads to the map building algorithm. In order to accomplish the proposed traveling algorithm, this paper additionally discusses a position revision algorithm.

Revision of 1/1,000 digital Map for Application of 3Dimensional Geospatial Data (1/1,000 수치지도의 수정을 위한 3차원 공간정보의 활용 방안)

  • Lee, Hyunjik
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.32 no.2
    • /
    • pp.77-86
    • /
    • 2014
  • As raster-based high quality and resolution spatial information has appeared, 1/1,000 digital map lost either its recognition or uses because of insufficient new modified and updated information. Therefore, this study analyzed the linkage between three-dimensional spatial information and 1/1,000 digital map, and also suggested a modification plan of 1/1,000 digital map, made by three-dimensional spatial information. In fact, some area of Incheon and Busan were presented with the modification plan of 1/1,000 digital map as three-dimensional trial models. These trials reflected possibilities of modification by qualitative and quantitative analysis of 1/1,000 digital map, using three-dimensional object model.

Update/Revision of Digital Map by Using the Drawing of Work Completion Surveying (준공측량도면을 이용한 수치지도 수정/갱신)

  • Kim, Won-Dae;Lee, Kang-Won;Park, Hong-Gi
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.8 no.1 s.15
    • /
    • pp.85-95
    • /
    • 2000
  • There is a recent emphasis on the need for updating and revision of existing digital maps as more digital maps are used and produced. Various type of data sources, such as photographs, ground surveyed data and satellite images, are used in the revision and the updating process. The process is very time consuming and costly, especially for small regional areas. This study, attempts to present an effective update/revision method using the as-built surveying drawings and the accuracy of the digital map which has been updated and revised using this method was also investigated. This study showed that by using as-built surveying drawings of scale 1/1,200 to update a digital map of scale 1/1,000, the resulting accuracy satisfied the requirements of the national digital map accuracy specification for the corresponding scale. The necessity of the existence of the necessary drawings and maps is a requirement of this process and it is also suggested that densification of local control points especially in the urban areas is necessary for producing accurate as-built surveying drawings. This would require the establishment of rules and regulations which would require constructions to perform as-built surveying, immediately after the construction has been completed.

  • PDF

The Improvement of Code DGPS Positioning Accuracy for LBS (LBS를 위한 코드 DGPS 위치 정확도 향상에 관한 연구)

  • 강준묵;조성호;임영빈
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.11a
    • /
    • pp.29-32
    • /
    • 2004
  • Purpose of this study is to maximize inflection of code DGPS for LBS. Compare calibration method with pseudo range revision method for this and decides revision method. Also, examine variation that occur by inconsistency of satellite association of user and standard department for problem solution by satellite association. Model revision information through AR model who use RLSLF and minimises satellite association problem. I wish to do optimized code DGPS of digital map so that is possible through an experiment.

  • PDF

A Methodology for Digital Cadastre on Large National Estate - Focusing on Cadastral Map Revision - (대규모 국·공유지의 디지털 지적정리 방안 - 지적도면 정비를 중심으로 -)

  • Lee, Won-Hui;Kang, Sang-Gu;Jung, Wan-Suk
    • Journal of Cadastre & Land InformatiX
    • /
    • v.45 no.1
    • /
    • pp.137-150
    • /
    • 2015
  • The methodology on digital cadastre(World Geodetic System Conversion) needs to be specified because the primary target site is discussed for large national estate such as road, river etc. on nationwide. Comprehensively reviews on similar cases and literature reviews to make a methodology for digital cadastre on large national estate, cadastral map revision is required before converting to World Geodetic System. The revisions are on subdivision survey or the other surveys to the necessary area through inspection of geometry and attributes. And the researcher pointed out the need of registration conversion and union of parcel to remove small parcel or to remove the inconsistency of land use type. Basically a systematic maintenance of cadastral map is necessary because the World Geodetic System Conversion unresolved the poor cadastral map quality to digital cadastre on large national estate.

Application of QuickBird Imagery for the Production of Digital Map (수치지도 제작을 위한 QuickBird 영상의 활용)

  • Kang, Joon-Mook;Yoon, Hee-Cheon;Kim, Youn-Gwan;Park, Joon-Kyu
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.1
    • /
    • pp.63-71
    • /
    • 2008
  • Recently according to supplying high resolution satellite imagery, we take much interest in the update and the revision of digital map and thematic map based on the satellite images. This study analyzed the modeling accuracy for QuickBird imagery and produced the digital map on a scale 1 to 5000 by way of showing an example. find an exhibition digital map was analyzed the positioning accuracy for the presentation of the possibility and the utility in the production and the revision to the digital map using QuickBird imagery. In order to analyze accuracies of constructed data, the digital topographic maps of 1:5000 scale which were produced by Korea National Geographic information Institute(NGI) were used. As a result, the RMSE was calculated at ${\pm}2.207$ m and 2.39 m in x and y direction respectively and it is within the permissible accuracy required for mapping on a scale of 1 to 5000 on the mapping rule notified by the National Geographic Information Institute. It is expected that the results of this study will be fully used in the field of large scale digital mapping and be utilized as basic information in applied field of the production and the revision of digital map.