• Title/Summary/Keyword: Multi-train simulation

Search Result 65, Processing Time 0.041 seconds

The Study on the Algorithm of Multi-Train Operation Simulation (다중 열차 운용시뮬레이션 알고리즘에 관한 연구)

  • Choi, K.H.;Gu, S.W.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07a
    • /
    • pp.477-479
    • /
    • 1999
  • This paper proposed train operation simulation algorithm, algorithm to determining operational mode and algorithm for train performance program, which play a important role in multi-train operation simulation. Using railway network modelling and signalling systems modelling already developed, these algorithms was presented.

  • PDF

Railway System Model for Multi-Train Traffic Simulator (다중열차 시뮬레이션을 위한 철도시스템 모델)

  • 김동희;김성호;오석문
    • Journal of the Korean Society for Railway
    • /
    • v.4 no.2
    • /
    • pp.47-54
    • /
    • 2001
  • Railway companies have been faced with many changes in the railway environment. To cope immediately with the influence of environment and to improve productivity, an efficient train operation system and related core technologies must be introduced. The railway system is composed of large scale infrastructures and high-cost trains. Simulation method is one of core technologies and also efficient tool for planning and analyzing these kinds of complex system. In this research, we review basic simulation programming models and present a modeling for the elements of railway system such as rail-line infrastructure, train, time table and operational route. Additionally, some considerations on the development of multi-train traffic simulator for KyongBu-line are discussed.

  • PDF

Considerations on the development of Multi-Train Traffic Simulator for KyongBu-Line (경부선 혼합 열차운용 시뮬레이션 개발에 관한 고찰)

  • 김동희;오석문
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.77-85
    • /
    • 2000
  • The railway system is composed of large scale infrastructures and high-cost trains. For planning and analyzing this kind of complex system, simulation method can be used for efficient tool. In this research, we review basic simulation programming models and present a modeling for the elements of railway system such as rail-line infrastructure, train, time table and operational route. Additionally, some considerations on the development of multi-train traffic simulator for KyongBu-line are discussed.

  • PDF

A Study Algorithm of AT Feeding Systems (AT 급전계통 해석 알고리즘 연구)

  • Chu, Dong-Uk;Kim, Jae-Cheol
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.51 no.4
    • /
    • pp.174-179
    • /
    • 2002
  • In this paper, the modified simulation algorithms of the Auto Transformer (AT) feeding electric train system were proposed. To obtain terminal voltage of train by using equivalent circuit or the AT feeding system, the iterative method is proposed for which determine the train voltages. The train voltages are iteratively calculated from the system voltage drop and line impedance. In the carte study, the proposed method is verified from actual operation data of the Kwa-Chon line. Also it is verified that the proposed method can be extent to the multi-train simulation tool. The terminal voltage of the multi-train can be calculated by using superposition principle and it is easily applied to the proposed method. Therefore, the proposed method can be a solution for the complexity of the circuit analysis in the existing methods.

A study on algorithm of AT feeding systems (AT 급전계통 전기철도 해석 알고리즘 연구)

  • Choo, Dong-Woog;Kim, Jae-Chul;Kim, Nak-Kyung
    • Proceedings of the KIEE Conference
    • /
    • 2001.07b
    • /
    • pp.1226-1228
    • /
    • 2001
  • In this paper, the modified simulation algorithms of the Auto Transformer (AT) feeding electric train were proposed. To obtain terminal voltage of train by using equivalent circuit of the AT feeding system, the iterative method is proposed for which determine the train voltages. The train voltages are iteratively calculated from the system voltage drop and line impedance. In the case study, the proposed method is verified from actual operation data of the Kwa-Chon line. Also it is verified that the proposed method can be extent to the multi-train simulation tool. The terminal voltage of the multi-train can be calculated by using superposition principle and it is easily applied to the proposed method. Therefore, the proposed method can be a solution for the complexity of the circuit analysis in the existing methods.

  • PDF

A Study on the Linear Modeling of Wheel/Rail Interaction for the Train Dynamics (철도차량 동특성 해석을 위한 휠/레일 상호작용의 선형모델링 연구)

  • 박찬경;박기준;박준서;배대성
    • Proceedings of the KSR Conference
    • /
    • 1998.05a
    • /
    • pp.517-524
    • /
    • 1998
  • A liner numerical model of the wheel-rail interation and the track geometry is developed for multi-body dynamics program. The simulation results are very simulation to these of VAMPIRE simulation. This program can be used for the analysis of train dynamic performance.

  • PDF

Simulation-based Optimal Design Method for the Train Overhaul Maintenance Facility (열차 중수선 시설의 최적 설계를 위한 시뮬레이션 분석 방법)

  • Um, In-Sup;Jeong, Soo-Dong;Oh, Jung-Hun;Lee, Hong-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.2
    • /
    • pp.291-301
    • /
    • 2009
  • This paper presents the optimal design and analysis method of the train overhaul maintenance facility based on the simulation. Because the train is composed of a coach or more, we design the simulation model after analyzing the operation of train into train, coach, coach's body parts and wheel parts and soon. In simulation analysis, we consider the critical (dependent) factors and design (independent) parameters for the selection of alternatives and optimal design. Therefore, Multi Criteria Decision Making (MCDM) is proposed for the selection of alternatives and optimal method in order to find the optimal design factors. The case study for the above approach is used for the electronic locomotive overhaul maintenance facility. This paper provides a comprehensive framework for the train overhaul maintenance facility design using the simulation, MCDM and optimal methods. Therefore, the method developed for this research can be adopted for other enhancements in different but comparable situation.

Development of a Train Performance Simulation S/W for The Performance Analysis of High Speed Railway System(2) (고속전철 시스템 성능해석을 위한 열차 주행시뮬레이션 S/W 개발(2))

  • Lee, Tae-Hyung;Hyun, Seung-Ho;Chung, Heuing-Chai;Hwang, Hee-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1381-1383
    • /
    • 2000
  • A multi-train operation simulation software is under development, in this G7 Project for a High Speed Train System, to simulate the running performance, power consumption, signalling and operation. In the first stage, a Train Performance Simulation (TPS) software is introduced in this paper. This is a core module of whole system and gives some parameters of a train, e.g., its position, speed traction and braking power and electric power system state, etc. In this paper, calculation technique was used for voltage drop at the train's positions and major posts along the catenary line. The final program will be used as an evaluation tool for system performance in constructing a new line or introducing a new train system.

  • PDF

An Object-Oriented Railway Model for Multi-Train Operation Simulation (객체지향 철도 모델에 의한 다중 열차운행 시뮬레이션)

  • 최규형
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.11 no.5
    • /
    • pp.193-200
    • /
    • 2003
  • A computer simulation program to evaluate the performance of railway systems and train operation plans and the effects of new technologies is provided. The program has the functions of tracing the movements of trains on railway network following the indication of railway signalling system and obeying all kinds of operation rules. An object-oriented technique is applied to model railway system effectively, and it is expected that the program code can be reused easily for other railway simulation programs. Dedicated graphic user interface displaying the simulation outputs by animation during simulation process makes the program convenient to use. Simulation results on the train operations on Kyung-bu line show the proposed program is promising.

AC/DC Converter Design of The Korean Type Multi-Propulsion System (한국형 다중추진시스템의 주전력변환기 설계)

  • Jho Jeong-Min;Jung Byung-Su;Cho Heung-Jae;Kim Su-Yong;Sung Ho-Kyung
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.54 no.3
    • /
    • pp.127-133
    • /
    • 2005
  • Korean multi-propulsion system consists of a synchronous alternator driven by a gas turbine driving synchronous alternator coupled to a rectifier - DC link - DC/DC converter and traction system based on modification of the G7 high-speed train. The simulation modules include turbine engine system, alternator, rectifier, DC/DC converter and power management module. Simulation for the multi-propulsion system such as a modular is presented in order to confirm the system stability for loads with uncertain input impedances and control loop speeds. This paper deals with various simulation modules with a specific control loop to help the development of the real lame-scaled system.