A Strategy of Technology Development for the Railway System based on Railway Network (철도망 구축을 고려한 철도시스템의 기술개발전략)

  • Lee Hi-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.319-324
    • /
    • 2006
  • Studied was a strategy of technology development for railway system in terms of railway network. First, The successful launch of the Korean HST system has not only decreased logistics burden but also significantly transformed the Korean trunk-line railway network, revolutionizing the logistics and technology sectors and reinvigorating the Korean railway industry in one century. Korean railway industry sector is now investing to develop many different types of railway system(G7, Post G7, tilting train...) so that these kinds of various railway system development should be integrated with the National Inter-modal Transportation Network Plan. To secure sufficient capacity that is required by the National Railroad Plan, the railway industry needs to establish mid- and long-term train purchase and operation strategies in compliance with railway construction and operation policies. During a railway construction planning, train operators, based on their train operation strategies, should come up with measures to closely cooperate with project operators from the planning stage through to the opening of a railway system. To be more precise, train operators should establish long-term train procurement plans reflecting both long-term national railroad network plans and plans for each railway line in order to suggest appropriate roles and schedules for each line. Also, based on the long-term railway plan, directions should be decided concerning the research and development of trains in advance.

A Study of Wireless Communication Network Constructing Policy Plan for an Efficient Railroad System Infrastructure (효율적인 철도시스템을 위한 무선통신망 구축정책 방안연구)

  • Lee, Seungho;Kim, Sigion
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.4
    • /
    • pp.262-271
    • /
    • 2013
  • Wireless communication networks are recently taking an important role in railroad systems as railways now require high speed and high density operation with the aid of advanced information technology to improve maintenance efficiency and to handle passenger service growth. Train control systems are consequently changing from track circuitbased systems to communication-based systems. This paper analyses the role of wireless communication networks in recent railroad systems, reviews foreign cases, and then suggests a communication network constructing policy for increased transport capacity increase, securement of safety, and efficient train control.

A Study on the Process of Constructing a Long-Term Railway Network Plan (장기철도망 구축계획의 구축과정에 관한 연구)

  • Seo, Kwang Seok
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.3
    • /
    • pp.267-275
    • /
    • 2012
  • Long-term national railway building comprehensive review of the proposal had 100 in railway history, railway rail network plan. Planning routes for establishing a plan, but, considering the rail network, the plan was that could with the very important meaning in the What more economical route considering the costs and benefits of building a rail network under budget constraints, went through the process of background lines of business unit interval expenses to adopt a business unit interval. Especially in building the railway network, as well as the road plan was to reflect in order to build for the future railway facilities was secured examine the possibility of possible budget commitment. Budget of securing the transportation tax, gasoline tax, and other transportation facilities in order to secure and commit the current funding approach and Review Bodu possible budget scenarios based on it written. Was also enforce rail system built in reviewing the demand more than anything that can take advantage of the railway distance by railway and the merits of the competition means to compete in the form of the assumed situation. The rail network deployment plan, considering this was discussed, based on the results of the plan to establish the first annual or period of the plan change was based on the budget that was unknown.

A study on the moving picture transmission method between the accident sites and control center (철도 사고현장의 동영상 전송방안에 관한 연구)

  • Cho, B.K.;Chang, S.G.;Ryu, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07b
    • /
    • pp.1300-1302
    • /
    • 2003
  • CCTV network has been implemented to transmit the image information of platform, ticket gate and transfer section to local headquarters in the KNR(Korean National Railroad). But, communication system for transferring image information around accident field or wayside has not been established yet. thus, at present implementation of communication equipment is necessary for dynamic image of unspecified accident to be transmitted to headquarters. Copper cable communication network is run by KNR, but it is processing installation of optical cable in connection with the implemental plan for high-speed network from now on. And, the capacity of communication channel will be guaranteed much more than now between station and station, station and central headquarters when optical cable is completed. This study analyzes the image equipment of field for transmission and estimated matters to transmit image information of accident field to headquarters with using communication infrastructure. And, the study considers implemental method of communication network for long-distance image transmission from dozens to hundreds kilometers.

  • PDF

A Study on railway noise prediction and reduction of PSC-beam bridge (PSC-beam 교량에서 철도소음 예측 및 저감방안 연구)

  • Lim, Kwang-Man;Um, Ki-Young;Cho, Kook-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.320-328
    • /
    • 2011
  • The down town passage segment which follows in the straight line which follows recently in high speed of the railway and rail construction is increasing. Also according to quality of life improvement of the citizens whom follows in national income increase the resident demand only becomes larger day by day about a environmental creation which is comfortable and house environmental etc. Demand of the citizens is not the problem of today yesterday about like this railway mean of transportation and with the fact that continuously will increase in future. This study is to predict and reduce railway noise from the conventional PSC-beam bridges which passes through urban areas under the government strateges of speed and weight increases of railway. The purpose of this study is to recommend a proper noise prediction method for designing pleasant roadside environments. The railway design including existing line reconstructions should minimize curved alignment to increase train speed to 180~200km/hr under the government's long-term planing such as the 4th Comprehensive National Development Plan (2000~2020), National Intermodal Transportation Plan (2000~2019) and National Railroad Network Establishment Plan (2006~2015), Since the PSC-beam bridges are mainly used for bridge structures urban areas, noise measurements were performed and analyzed to recommend the noise prediction methods for each type and speed of train respectively.

  • PDF

An Efficient Model and Algorithm to Allocate Rail Track Capacity Considering Line Plans (노선 계획을 고려한 철도 선로 용량 배분 최적화 모형 및 해법)

  • Park, Bum Hwan;Chung, Kwang Woo
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.6
    • /
    • pp.466-473
    • /
    • 2014
  • Recently, there is has been significant interest in the allocation systems of rail track capacities with considerations of the multiple train operating companies. The system indicates both a well-defined procedure and an algorithmic method to allocate the rail track capacities. Among them, this study considers the algorithmic method to derive the optimal timetable for the trains, which the companies propose together with their arrival and departure times at each station. However, most studies have focused on the adjustment of the departure and arrival times without conflicts, which could result in incompatible allocations with the line plan, which would result in an insufficient number of trains on each line to satisfy the demands. Our study presents a new optimization model and algorithm for the allocation problem in order to reflect the predetermined line plan. Furthermore, we provide the experimental results that were applied to the Korean high-speed railway network including the Suseo lines.

A Study on the Construction Demand for Network of Metro Railroad in Busan-Ulsan-Gyeongnam Area - In the place of National Road No.7 - (부울경 광역도시철도망 구축 필요성에 관한 연구 - 국도 7호선 중심으로 -)

  • Choi, Yang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.771-778
    • /
    • 2011
  • Preliminary feasibility study on Busan metro line #1 in Yangsan line (Nopo-Bukjeong) depending on active volume of mass transportation between Yangsan city and Busan city was conducted. As the study concluded that it's valid, the necessity to establish the metro railroad network connecting to Busan, Ulsan and Gyeongnam Province is demanded to improve the transportation issues in Ungsang area vulnerable to metro service and to drive the balanced development between metropolitan cities. In addition, the volume of transportation depending on methods in target areas and road traffic assignment are surveyed to put a stress on the necessity to establish the metro railroad network. As the demand of transportation for alternative lines is predicted, the budget and benefits for construction for each alternative line set for the rough economic analysis depending on traffic volume for each method and traffic assignment results. The total project budget necessary for construction of proposal line #1 set as effective one among target three lines in this project is calculated in 794.32 billion won. Construction accounts for the most expensive in expenses for project and contingency allowances, purchases for vehicles and collateral expense are followed in orders. However, compensation for lands is not counted. In particular, according to economic analysis in proposal #1, ratio of benefit/cost (B/C) is 0.584, net present value (NPV) is -217.47 billion won, the internal rate of return (IRR) is analyzed in 0.604 %. At the current stage, it is not economically feasible, but the B/C is 0.737 in long-term upon construction of Yangsan line between Wolpheong and Yongdang which is proposal line #3. Therefore, when Busan metro basic plan is reorganized to aim the benefit of residents in Ungsang area vulnerable to the metro service, we think it must be necessary to establish the metro railroad network connecting to Busan-Yangsan-Ulsan which is proposal line #2 by extending the existing Sinjeong line and including this task line in high-ranked plan related to metro railroad.

The study for image transmission method using communication equipment of KNR (철도연변의 통신설비를 이용한 화상전송방안에 관한 연구)

  • Cho, B.K.;Chang, S.G.;Ryu, S.H.;Kim, J.K.
    • Proceedings of the KIEE Conference
    • /
    • 2003.04a
    • /
    • pp.429-431
    • /
    • 2003
  • CCTV network has been implemented to transmit the image information of platform, ticket gate and transfer section to local headquarters in the KNR(Korean National Railroad). But, communication system for transferring image information around accident field or wayside has not been established ret. thus, at Present implementation of communication equipment is necessary for dynamic image of unspecified accident to be transmitted to headquarters. Copper cable communication network is run by KNR, but it is processing installation of optical cable in connection with the implemental plan for high-speed network from now on. And, the capacity of communication channel will be guaranteed much more than now between station and station. station and central headquarters when optical cable is completed. This study analyzes the image equipment of field for transmission and estimated matters to transmit image information of accident field to headquarters with using communication infrastructure. And, the study considers implemental method of communication network for long-distance image transmission from dozens to hundreds kilometers.

  • PDF

Estimation of Line Utilization Rate and Track Maintenance Time of Conventional Railway (일반철도의 선로이용율과 선로 유지보수시간 추정)

  • Ki, Hyungseo;Park, Dongjoo;Kim, Dongsoo;Kim, Haengbae
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.638-644
    • /
    • 2012
  • In this study, we numerically estimated available and unavailable time of conventional railway by examining 60% which is known as average range of track utilization efficiency. We also estimated track repair time for maintenance which is the main factor of making track utilization change and analyzed appropriate estimated time. The railway's safety should be guaranteed by appropriate railway operating plan and by adequate rail facilities maintenance. At the same time, daily railway train 'Dia's recovery power should be reflected to the management plan. Considering these factors, we examined mechanical equipment and the national rail network in order to rationally estimate track repair time of the maintenance and to secure spare time in case of train delays. It was found that track utilization efficiency was more or less 60%.

An Iterative Linear Approximation Algorithm for a Unified Model of Traffic Assignment and Line Planning in Railway Networks (통행배정-노선계획 통합 모형을 위한 선형 근사화 알고리듬 개발)

  • Park, Bum Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.2
    • /
    • pp.140-147
    • /
    • 2014
  • Line planning is an important step to determine the optimal frequencies of trains given the forecasted demand for each train type. The main input data for line planning is the leg traffic demand which can be derived using suitable traffic assignment models. However most assignment models require a line plan, in other words, train frequencies or headways, so that inconsistent results just by the procedural approach to find an optimal line plan after determining leg traffic can be avoided. This paper suggests a unified model that can consider the traffic assignment and line planning, simultaneously. We further provide an elaborated approximation algorithm and, finally, provide experimental results determined for the Korean railway network.