• Title/Summary/Keyword: Nuclear communication board

Search Result 5, Processing Time 0.023 seconds

Design of Communication Board for Communication Network of Nuclear Safety Class Control Equipment (원자력 안전등급 제어기기의 통신망을 위한 통신보드 설계)

  • Lee, Dongil;Ryoo, Kwangki
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.19 no.1
    • /
    • pp.185-191
    • /
    • 2015
  • This paper suggest the safety class communication board in order to design the safety network of the nuclear safety class controller. The reactor protection system use the digitized networks because from analog system to digital system. The communication board shall be provided to pass the required performance and test of the safety class in the digital network used in the nuclear safety class. Communication protocol is composed of physical layer(PHY), data link layer(MAC: Medium Access Control), the application layer in the OSI 7 layer only. The data link layer data package for the cyber security has changed. CRC32 were used for data quality and the using one way communication, not requests and not responses for receiving data, does not affect the nuclear safety system. It has been designed in accordance with requirements, design, verification and procedure for the approving the nuclear safety class. For hardware verification such as electromagnetic test, aging test, inspection, burn-in test, seismic test and environmental test in was performed. FPGA firmware to verify compliance with the life-cycle of IEEE 1074 was performed by the component testing and integration testing.

Design of Uni-directional Optical Communication Structure Satisfying Defense-In-Depth Characteristics against Cyber Attack (사이버공격에 대비한 심층방호 특성을 만족하는 단방향 광통신 구조 설계)

  • Jeong, Kwang Il;Lee, Joon Ku;Park, Geun Ok
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.2 no.12
    • /
    • pp.561-568
    • /
    • 2013
  • Instrumentation and control system in nuclear power plant performs protecting, controling and monitoring safety operation of Nuclear Power Plant. As cyber attack to the control equipment of instrumentation and control system can cause reactor shutdown and radiation release, it is required to design the instrumentation and control system considering cyber security in accordance with regulatory guides and industrial standards. In this paper, we proposed a design method of uni-directional communication structure which is required in the design of defense-in-depth model according to regulatory guides and industrial standards and we implemented a communication board with the proposed method. This communication board was tested in various test environments and test items and we concluded it can provide uni-directional communication structure required to design of defense-in-depth model against cyber attack by analyzing the results. The proposed method and implemented communication board were applied in the design of SMART (system-integrated modular advanced reactor) I&C (instrumentation and control) systems.

The Implementation of Testing Board forSingle Event Upsets

  • Lho, Young-Hwan;Kim, Ki-Yup
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.5 no.2
    • /
    • pp.28-34
    • /
    • 2004
  • One of the major problem encountered in nuclear plants and satellites design isEMI (Electro-Magnetic Interference) and EMC (Electro-Magnetic Compatibility).Here, our focus is to implement the test board for checking SEU (Single EventUpsets); the effects of protons on the electronic system. The SEU results from thelevel change of stored information due to photon radiation and temperature in thespace environment. The impact of SEU on PLD (Programmable Logic Devices)technology is most apparent in ROM/SRAM/DRAM devices wherein the state ofstorage cell can be upset. In this paper, a simple and powerful test techniques issuggested, and the results are presented for the analysis and future reference. In ourexperiment, the proton radiation facilitv (having the energy of 50 MeV with a beamcurrent of 60 uA of cyclotron) available at KIRAMS (Korea Institute of RadiologicalMedical Sciences) has been applied on a commercially available SRAM manufacturedby Hynix Semiconductor Company.

Implementation of crowbar circuit for high-speed discharge·charge switching and its characteristic analysis (고속 방전·충전 스위칭 전원차단회로 설계 제작 및 특성분석)

  • Lee, Min-woong;Cho, Seong-ik;Lee, Nam-ho;Jeong, Sang-hun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.21 no.5
    • /
    • pp.885-892
    • /
    • 2017
  • In this paper, we proposed a novel crowbar circuit for high-speed discharge charge switching to solve discharge charge-time delay of supply voltage in the conventional crowbar circuit. The proposed circuit is designed to increase the charge-speed after high-speed discharge of supply voltage, thereby reducing the time exposed to radiation damage and, the normal operation time of electronic system after passing the pulse radiation. The simulation of the discharge charge-times before the implement of the hardware is conducted using Cadence's pspice tool, and DUT (Device Under Test) board is fabricated in the device level. The comparison measurement of the crowbar circuits is performed on the satellite-electronic device for 24V. As the result, we confirmed the high-speed function of the proposed circuit by improvement of the discharge-speed 96.8% and the charge-speed 27.3% as compared with the conventional circuit.

The Construction Work Completion of the Fuel Test Loop (핵연료 노내조사시험설비 설치공사 완료)

  • Park, Kook-Nam;Lee, Chung-Young;Chi, Dae-Young;Park, Su-Ki;Shim, Bong-Sik;Ahn, Sung-Ho;Kim, Hark-Rho;Lee, Jong-Min
    • Proceedings of the KSME Conference
    • /
    • 2007.05a
    • /
    • pp.291-295
    • /
    • 2007
  • FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL consists of In-Pile Test Section (IPS) and Out-Pile System (OPS). FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. Task Force Team was organized to do a construction systematically and the communication between members of the task force team was done through the CoP(community of Practice) notice board provided by the Institute. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. Without a sweet of the workers of the participating company of HEC(Hyundae Engineering Co, Ltd), HDEC(HyunDai Engineering & Construction Co. Ltd), equipment manufacturer, and the task force team, it is not possible to install the FTL facility within the planned shutdown period. The Commissioning of the FTL is on due to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

  • PDF