• Title/Summary/Keyword: Off-line station

Search Result 31, Processing Time 0.032 seconds

A Study on the Capacity of the Off-line Station for PRT System (PRT 시스템의 역수용 용량결정에 관한 연구)

  • Lee, Jun-Ho;Jeong, Rac-Gyo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.6
    • /
    • pp.1070-1074
    • /
    • 2010
  • In this study we deal with a simple computer simulation algorithm to decide the PRT station capacity. PRT system is different from the conventional rail traffic system in such point that the station is off-line so as to guarantee a very short headway. This characteristic has correlation with the accurate prediction of the line capacity and with the scale of the off-line station. In this paper physical factors and vehicles per hour that are necessary to decide the off-line station scale and the off-line station capacity, respectively, are shown through a simple compter simulations.

Analysis of Strategies for Installing Parallel Stations in Assembly Systems

  • Leung, John W.K.;Lai, K.K.
    • Industrial Engineering and Management Systems
    • /
    • v.4 no.2
    • /
    • pp.117-122
    • /
    • 2005
  • An assembly system (AS), a valuable tool for mass production, is generally composed of a number of workstations and a transport system. While the workstations perform some preplanned operations, the transport system moves the assemblies by special designed pallets from one station to another. One common problem associated with automatic assembly systems is that some assembly operations may have relatively long cycle times. As a consequence, the productivity, as determined by the operations with the longest cycle time, can be reduced significantly. Therefore, special forms of parallel workstations were developed to improve the performance of an assembly system. In this paper, three most commonly used parallel stations: on-line, off-line and tunnel-gated stations in a free transfer assembly system are studied via discrete event simulation. Our findings revealed that the off-line parallel system has the best performance because the two independent parallel stations can lower the buffer requirement; reduce the sensitivity to variability of processing time and balance of a line. On-line parallel systems were found to have a relatively poor performance, because the operations of two parallel stations block each other, and higher buffer capacity is required to achieve similar capacity. The tunnel-gated system was more efficient than the on-line system since the first parallel station can operate independently. More importantly, we have quantified the productivity of the three different strategies mentioned. Engineers can choose the optimal strategies for installing parallel stations under their working environment.

Optimal Inspection Plan for a Flexible Assembly Line

  • Yoo, Seuck-Cheun
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.18 no.1
    • /
    • pp.97-117
    • /
    • 1993
  • This paper considers inspection station location problem for a flexible assembly line that consists of multiple stages. By considering the trade-off between locating an station at an "early" stage and at a "late" stage, we have developed some dominance relations on a graph. Based on the dominance relations, we then present an algorithm that finds an optimal inspection plan and a heuristic approach that finds a near-optimal inspection plan. The effectiveness of these two algorithms is demonstrated by two numerical examples. numerical examples.

  • PDF

Development of Real-time Oceanographic Information System for Long Line Hanging Aquaculture Farm and Temperature Variation in the Coastal Area of the East Sea (수하식 양식장용 실시간 해양환경 관측시스템 개발 및 동해 연안의 수온변동 특성)

  • Yang, Joon-Yong;Kim, Lim-Hak;Lee, Joon-Soo;Hwang, Jae-Dong;Suh, Young-Sang;Kim, Dae-Chul
    • Journal of Environmental Science International
    • /
    • v.19 no.11
    • /
    • pp.1397-1405
    • /
    • 2010
  • Mass mortalities of cultivated organisms have occurred frequently in Korean coastal waters causing enormous losses to cultivating industry. The preventive measures require continuous observation of farm environment and real-time provision of data. However, line hanging aquaculture farm are generally located far from monitoring buoys and has limitations on installation of heavy equipments. Substituting battery pack for solar panels and miniaturizing size of buoy, newly developed system can be attached to long line hanging aquaculture farm. This system could deliver measured data to users in real-time and contribute to damage mitigation and prevention from mass mortalities as well as finding their causes. The system was installed off Gijang and Yeongdeck in Korea, measuring and transmitting seawater temperature at the sea surface every 30 minutes. Short term variation of seawater temperature, less than one day, in Gijang from June to July 2009 corresponded tidal period of about 12 hours and long term variation seemed to be caused by cold water southeast coast of Korea, particularly northeast of Gijang. Seawater temperature differences between Gijang station and the other station that is about 500 m away from Gijang station were $1^{\circ}C$ on average. This fact indicates that it is need to be pay attention to use substitute data even if it is close to the station. Daily range of seawater temperature, one of crucial information to aquaculture, can be obtained from this system because temperature were measured every 30 minutes. Averages of daily range of temperature off Gijang and Yeongdeok during each observation periods were about $2.9^{\circ}C$ and $4.7^{\circ}C$ respectively. Dominant period of seawater temperature variation off Yeongdeok was one day with the lowest peak at 5 a.m. and the highest one at 5 p.m. generally, resulting from solar radiation.

A Research on The Generation of Bus Stop Information by The Line Using Passenger's Boarding and Getting off Information on Smart Cards (교통카드 이용자 승차 및 하차 정보를 이용한 버스 노선별 정류장 정보 생성 모형 연구)

  • Yoo, Bong-Seok;Choo, Sang-Ho
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.12 no.5
    • /
    • pp.873-882
    • /
    • 2017
  • Smart cards are currently used in about 150 locales, including the metropolitan ares, and are utilized as a policy base for various public areas, including public transportation, bus fares, and public transportation requirements. However, excluding the metropolitan area and some metropolitan areas, there are many areas where the existing BIS data was unable to match station information on the data and Smart cards itself are not available on the bus stop information by the line. The purpose of this research was to produce bus stop information generated by the bus stop based on the bus route, and the actual stop information generated by the model presented in the study was derived by matching the actual station information.

Development of Coating Robot Automation System Based on OLP for Radiators in PPS (페키지형 발전시스템용 라디에이터의 OLP 기반 코팅로봇 자동화시스템 개발)

  • Kim, Seon-Jin;Lee, Jong-Hwan;Lho, Tae-Jung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.2
    • /
    • pp.585-591
    • /
    • 2013
  • A robot automation system for coating uniformly a big radiator used in PPS(Packaged Power Station), which consists of 6-axis robot with spray gun, travelling vehicle, supply device of coating paint and thinner with pressured air, HMI controller and robot path OLP(Off-Line Programming), was developed. Experimental results on an optimum operation condition show that a coating thickness is $43{\mu}m$, which is satisfied to a design reference of $25-100{\mu}m$. A productivity of the developed coating robot automation system based on OLP is about 12.6 times of that of manual operation.

Optical Line Monitoring System Using Optical Cable Closure (광케이블 접속함체를 이용한 광선로 감시시스템)

  • Jung, So-Ki;Chae, Woong-Sik
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.38A no.7
    • /
    • pp.592-602
    • /
    • 2013
  • The purpose of this study is to optical cable closure and fiber line monitoring system. The current optical cable closure cases have not had any systems that help the central control station recognize opening as well as closing the cases in real-time when opening B2B and B2C lines. to solve this problem, it is considered to create systems that go off alarms, real-time fault location immediately, set alarms for open and close monitoring optical cable closure, and inspect regularly whether optical cables are deficient when monitoring the optical line in real-time and cutting them, in this paper, the monitoring system whose the central control station finds an optical signal block immediately and goes off the alarms when line workers separate components like a connector or a tray from the optical cable closure through OTDR. this study can contribute to stabilize the network quality through the quick and effective operation of the cables.

PMCR-A Power Mapping and Calibration Routing for 600 MWe CANDU-PHW Reactors

  • Oh, Se-Ki;G.Kugler
    • Nuclear Engineering and Technology
    • /
    • v.11 no.4
    • /
    • pp.275-286
    • /
    • 1979
  • In 600 MWe CANDU-PHW reactors PMCR will be used on-site for calibration of the regional overpower system. PMCR will be executed off-line in one of the station computers. The program calculates accurate channel power maps by incorporating a fuel turnup dependent flux to power conversion algorithm. Fuel turnup is calculated by PMCR, hence it is independent of other software. Extensive comparisons with the uniform flux/power conversion approximations were made. Significant improvements in power mapping accuracy are achieved with PMCR.

  • PDF

A Study on Rail Station-Influenced Area Development Combined with the Optimal Connection and Transfer Facility (적정연계환승체계를 감안한 역세권개발방안에 관한 연구)

  • Chung, Chul;Kim, Sigon;Kim, Yeonkyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.519-525
    • /
    • 2012
  • This study suggests 3 different elements to develop a rail station-influenced area effectively. Above all, several typical models of TOD (Transit Oriented Development)are suggested. They consider the land use types around a rail station, characteristics of a rail station whether it serves a single line or multiple lines. a method of developing a rail station-influenced area. Secondly, the optimal level of service is suggested for connection facility and access modes. Finally, the allocation criteria of on-and-off facility to provide convenient transfer activity.

Development of Equipment Measuring Insulation Resistance of High-Power Cables in Operation at Power Station (발전소에서 운전 중인 고전력 케이블의 절연저항의 변화를 감시하는 장치의 개발)

  • Um, Kee-Hong;Kim, Bo-Kyeong
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.16 no.4
    • /
    • pp.159-164
    • /
    • 2016
  • In or to generate high electric power in increasing demand, power station should operate facilities to meet requirement. The scale of electric power equipment is increasing in both size and complexity. With unexpected accidents at power facilities or power stations happening, substantial socioeconomic losses in an industrial society is caused. A major cause of unexpected accidents is deterioration of dielectrics, isolating two conductors electrically. In order to detect the deterioration processes of power cables, the operation status of power cables should be monitored on a regular basis. We have invented and installed equipment at Korea Western Power Co., Ltd., located in Taean, in order to predict and prevent the deterioration status of dielectrics destruction of power cables. The main line in Y-connection to the secondary coils of transformer delivers electric power to the external devices. The equipment we developed is the one measuring insulation resistance of cables operation in on/off status with respect to the main line. We present the equipment in terms of operation and configuration of hardware side.