• Title/Summary/Keyword: Off-site

Search Result 597, Processing Time 0.028 seconds

Estimation of greenhouse gas (GHG) emission from wastewater treatment plants and effect of biogas reuse on GHG mitigation

  • Chang, Jin;Kyung, Daeseung;Lee, Woojin
    • Advances in environmental research
    • /
    • v.3 no.2
    • /
    • pp.173-183
    • /
    • 2014
  • A comprehensive mathematical model was developed for this study to estimate on-site and off-site GHG emissions from wastewater treatment plants (WWTPs). The model was applied to three different hybrid WWTPs (S-WWTP, J-WWTP, and T-WWTP) including anaerobic, anoxic, and aerobic process, located in Seoul City, South Korea. Overall on-site and off-site GHG emissions from S-WWTP, J-WWTP, and T-WWTP were $305,253kgCO_2e/d$, $282,682kgCO_2e/d$, and $117,942kgCO_2e/d$, respectively. WWTP treating higher amounts of wastewater produced more on-site and off-site GHG emissions. On average, the percentage contribution of on-site and off-site emissions was 3.03% and 96.97%. The highest amount of on-site GHG emissions was generated from anoxic process and the primary on-site GHG was nitrous oxide ($N_2O$). Off-site GHG emissions related to electricity consumption for unit operation was much higher than that related to production of chemicals for on-site usage. Recovery and reuse of biogas significantly reduced the total GHG emissions from WWTPs. The results obtained from this study can provide basic knowledge to understand the source and amount of GHG emissions from WWTPs and strategies to establish lower GHG emitting WWTPs.

ESTIMATION OF OFF-SITE DOSE AND RELEASE CONCENTRATION OF RADIOACTIVE LIQUID EFFLUENTS FROM RADWASTE TREATMENT SYSTEM IN KORI 3&4

  • Kim, H.S.;Son, J.K.;Kim, K.D.;Ha, J.H.;Song, M.J.
    • Journal of Radiation Protection and Research
    • /
    • v.26 no.3
    • /
    • pp.291-298
    • /
    • 2001
  • The designed release rate of liquid effluents from radwaste treatment system should be calculated and evaluated during normal operation, including anticipated operational occurrence and be assured that the release concentration and off-site dose at unrestricted area do not exceed the limits of regulation. The expected annual release rate and off-site dose for the currently operating nuclear power plants in Korea had been calculated and evaluated using PWR-GALE and LADTAP-II which was based on USNRC Regulatory Guide 1.109. Recently, the MOST Notice 2001-2 related to release concentration and off-site dose at unrestricted area was revised to reflect the concept of ICRP-60. It is necessary for KORI 3&4 to re-calculate the release concentration and off-site dose and to compare these results with the limits of regulation. As the results of assessment, we confirmed that the release concentrations were less than its limits of MOST Notice 2001-2 and the off-site dose at unrestricted area using K-DOSE60 was 3.61E-03 mSv/yr to the age of five for the effective dose, and 4.10E-2 mSv/yr to thyroid of the age of five for the organ equivalent dose. We also confirmed the off-site dose was within the limits of MOST Notice 2001-2. Therefore, the release concentration and off-site dose re-evaluated at unrestricted area in KORI 3&4 were well below the regulation limits of MOST Notice 2001-2.

  • PDF

A Case Study on Construction Cost Comparison for On-Site Construction and Off-Site Construction of Plant Project (플랜트 건설의 현장시공 및 모듈시공에 대한 공사비 비교 사례연구 - Pipe Rack을 대상으로 공사비 산정 -)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.25-34
    • /
    • 2023
  • The purpose of this study is to calculate and compare construction costs for On-Site Construction and Off-Site Construction in Plant Project. For this purpose, the target for calculating the construction cost was limited to the Pipe Rack(Steel Structure and Piping). The results derived according to the purpose of the study are as follows. 1)The direct construction cost for On-Site Pipe Rack construction was KRW 56 billion, with Steel Structure KRW 25.1 billion and Piping KRW 30.8 billion won. 2)Comparing the rate of change between On-Site Construction and Off-Site Construction, material costs increased by 1.9% and expenses by 192.1%, but labor costs decreased by -9.1%, resulting in a total direct construction cost increase of 8.4%. These results can be used as reference data to check the current status of the increase or decrease in construction costs when constructing Pipe Racks as Off-Site Construction.

A new research program that aims to establish an external audit system to radiotherapy QA in Japan

  • Shimbo, Munefumi;Tabushi, Katsuyoshi;Endo, Masahiro;Ikeda, Hiroshi
    • Proceedings of the Korean Society of Medical Physics Conference
    • /
    • 2002.09a
    • /
    • pp.17-18
    • /
    • 2002
  • Last year, a three-year research program was started in order to establish an external audit system to radiotherapy QA in Japan. It consists of questionnaire surveys, mailed (off-site) dosimetry and visited (on-site) dosimetry at radiotherapy facilities in Japan. The first questionnaire was sent to all Japanese radiotherapy facilities in October 2001, surveying basic QA procedures at each facility. 628 answers were returned with the return rate of 87%. In February 2002, the second questionnaire was sent. Off-site and on-site dosimetry have been tested in several facilities, and will be started soon. We anticipates that this program will gradually grow to a radiotherapy quality control center similar to Radiological Physics Center at MD Anderson Hospital.

  • PDF

Development of Web-based Off-site Consequence Analysis Program and its Application for ILRT Extension (격납건물종합누설률시험 주기연장을 위한 웹기반 소외결말분석 프로그램 개발 및 적용)

  • Na, Jang-Hwan;Hwang, Seok-Won;Oh, Ji-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.5
    • /
    • pp.219-223
    • /
    • 2012
  • For an off-site consequence analysis at nuclear power plant, MELCOR Accident Consequence Code System(MACCS) II code is widely used as a software tool. In this study, the algorithm of web-based off-site consequence analysis program(OSCAP) using the MACCS II code was developed for an Integrated Leak Rate Test (ILRT) interval extension and Level 3 probabilistic safety assessment(PSA), and verification and validation(V&V) of the program was performed. The main input data for the MACCS II code are meteorological, population distribution and source term information. However, it requires lots of time and efforts to generate the main input data for an off-site consequence analysis using the MACCS II code. For example, the meteorological data are collected from each nuclear power site in real time, but the formats of the raw data collected are different from each site. To reduce the efforts and time for risk assessments, the web-based OSCAP has an automatic processing module which converts the format of the raw data collected from each site to the input data format of the MACCS II code. The program also provides an automatic function of converting the latest population data from Statistics Korea, the National Statistical Office, to the population distribution input data format of the MACCS II code. For the source term data, the program includes the release fraction of each source term category resulting from modular accident analysis program(MAAP) code analysis and the core inventory data from ORIGEN. These analysis results of each plant in Korea are stored in a database module of the web-based OSCAP, so the user can select the defaulted source term data of each plant without handling source term input data.

A Study of the Decision Making System in adopting Off-Site Construction Method in the Initial Stage Considering the Building Project Characteristics -Focused on Structure Work of Apartment Housing- (건축 프로젝트 특성을 고려한 초기 단계에서의 Off-Site Construction 공법 도입 여부 의사 결정 시스템 개발 - 공동주택 골조공사 중심으로 -)

  • Lee, Sungho;Cha, Heesung;Son, Bosik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.89-97
    • /
    • 2022
  • Recently, various problems such as reduced productivity, insufficient inflow of skilled manpower, reduced quality, and concerns about increasing safety accidents have appeared in the domestic construction industry. Stakeholder of construction project are considering the Off-Site Construction (OSC) method rather than the conventional on-site construction as an alternative. Despite the importance of decision making in the early stage of the adoption of OSC, there is a lack of methodologies for rational decision making. In this study, a decision making system has been developed to derive the final construction cost score by deriving the project characteristics, selecting the construction difficulty index, and developing a cost model for each construction method alternatives to calculate the standard construction cost. Using this system, the OSC method can be effectively evaluated in terms of its feasibility in the early stage of construction

A Method to Calculate Off-site Radionuclide Concentration for Multi-unit Nuclear Power Plant Accident (다수기 원자력발전소 사고 시 소외 방사성물질 농도 계산 방법)

  • Lee, Hye Rin;Lee, Gee Man;Jung, Woo Sik
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.6
    • /
    • pp.144-156
    • /
    • 2018
  • Level 3 Probabilistic Safety Assessment (PSA) is performed for the risk assessment that calculates radioactive material dispersion to the environment. This risk assessment is performed with a tool of MELCOR Accident Consequence Code System (MACCS2 or WinMACCS). For the off-site consequence analysis of multi-unit nuclear power plant (NPP) accident, the single location (Center Of Mass, COM) method has been usually adopted with the assumption that all the NPPs in the nuclear site are located at the same COM point. It was well known that this COM calculation can lead to underestimated or overestimated radionuclide concentration. In order to overcome this underestimation or overestimation of radionuclide concentrations in the COM method, Multiple Location (ML) method was developed in this study. The radionuclide concentrations for the individual NPPs are separately calculated, and they are summed at every location in the nuclear site by the post-processing of radionuclide concentrations that is based on two-dimensional Gaussian Plume equations. In order to demonstrate the efficiency of the ML method, radionuclide concentrations were calculated for the six-unit NPP site, radionuclide concentrations of the ML method were compared with those by COM method. This comparison was performed for conditions of constant weather, yearly weather in Korea, and four seasons, and the results were discussed. This new ML method (1) improves accuracy of radionuclide concentrations when multi-unit NPP accident occurs, (2) calculates realistic atmospheric dispersion of radionuclides under various weather conditions, and finally (3) supports off-site emergency plan optimization. It is recommended that this new method be applied to the risk assessment of multi-unit NPP accident. This new method drastically improves the accuracy of radionuclide concentrations at the locations adjacent to or very close to NPPs. This ML method has a great strength over the COM method when people live near nuclear site, since it provides accurate radionuclide concentrations or radiation doses.

Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction (OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출)

  • Jun, Young-Hun;Bae, Byung-Yun;Yun, Won-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF

Offsite Risk Assessment on Flammable Hazard Site (가연성물질 저장설비의 사고시 사업장외에 미치는 영향평가)

  • Lee, Dong Hoon;Park, Kyo Shik;Kim, Tae Ok;Shin, Dong Min;Shin, Seo Yun
    • Korean Journal of Hazardous Materials
    • /
    • v.3 no.1
    • /
    • pp.52-58
    • /
    • 2015
  • Since the HF release in 2012 in Korea, it became one of the most significant to evaluate consequence to the vicinity of industry facilities handling hazardous materials. BTX plant is selected to assess off-site risk to check whether the facility satisfies the Chemical Control Law by Korea Government. Accident scenarios were listed using process safety information. The scenarios having effect to the off-site were selected and assessed further according to guideline provided by Korea government. Worst case and alternative scenarios including other interested scenarios were evaluated using ALOHA. Each evaluated scenario was assessed further considering countermeasures. The results showed that the facility handling chloric acid is safe enough and needed no further protections at the moment.

Suggestions for Increasing Utilization of KORA for Supporting the Off-site Risk Assessment System (화학사고 장외영향평가 지원 프로그램(KORA)의 활용도 증대를 위한 제언)

  • Kim, Jungkon;Ryu, Jisung;Ryu, Taekwon;Kwak, Sollim;Lim, Hyeongjun;Choi, Woosoo;Jung, Jinhee;Lee, Jieun;Lim, Dongyeon;Yoon, Junheon
    • Journal of Environmental Health Sciences
    • /
    • v.44 no.2
    • /
    • pp.124-132
    • /
    • 2018
  • Objectives: All enterprises intending to install and operate hazardous chemical handling facilities should prepare an off-site risk assessment (ORA) report that evaluates the impact of potential chemical accidents on the surrounding environment and population. This study was conducted to introduce the process of development and the functioning of the Korea Off-site Risk Assessment support tool (KORA) developed by the National Institute of Chemical Safety and to suggest manners to increase its utilization. Additionally, this article provided an overview of KORA. Methods: In order to identify problems with and refinements for KORA, the required items for each phase of KORA were derived by analyzing the Chemical Control Act and related administrative regulations. Results: The functions of KORA made receptor-considered assessment of chemical accidents possible, but several limitations were found in particular phases, such as the analysis of impact range, consideration of sensitive receptors, and assessment of environmental receptors. Conclusion: In this study, we suggested manners to increase the utilization of KORA. It is anticipated that the further research suggested in the study could contribute to the stabilization of the KORA system.