• Title/Summary/Keyword: Office building construction

Search Result 307, Processing Time 0.031 seconds

A COST DATA-BASED ESTIMATING MODEL FOR FINISHES IN THE KOREAN PUBLIC OFFICE BUILDING PROJECTS

  • Joon-Oh Seo;Sang H.Park;Choong-Wan Koo;Jong-Hoon Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.685-691
    • /
    • 2009
  • Recently, public office building projects are being recognized by many construction engineers and researchers, as the critical projects in the construction industry. The project budgets have sometimes exceeded due to the lack of core knowledge, experiences, skills and experts concerned in cost planning and estimating in the pre-construction stage. It has been highlighted that planning and estimating effectively the cost of public office building projects as critical in the design stage. Within this context, some cost data books and systems, such as RSMeans cost data systems and Spon's price book, have been systematically developed and used by many construction cost managers and organizations in order to effectively estimate and use their project budgets. As a result of this research, a cost estimating model for finishes has been developed, considering the cost data used in public office building projects.

  • PDF

Construction of a 300-Meter Vertical City: Abeno Harukas

  • Mizutani, Kenichi;Hirakawa, Kiyoaki;Nakashima, Masato
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.3
    • /
    • pp.199-207
    • /
    • 2015
  • Abeno Harukas is the tallest building in Japan and is located in Abeno, which is one of the three main railway transport nodes in Osaka. This building has a height of 300 meters, and its lowest levels are 30 meters below ground. It contains a department store, museum, offices, a hotel, and an observatory. In this urban renewal project, a section of the department store that encloses the station was dismantled and replaced by a supertall building complex, while infrastructure was simultaneously constructed, including: upgrades to the station and the existing department store, improved connections to the subway and pedestrian bridges, and a new pedestrian walkway over the road. In this paper, the ingenious erection processes, newly developed technologies, and precise construction management techniques are introduced for Japan's tallest building.

The Work Scope of Remodelling for the Intelligent Office Building (기존 사무소건축의 IB화를 위한 리모델링 작업범위)

  • Park, Keun-Joon;Koo, Soo-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.75-83
    • /
    • 2004
  • The IB is normally defined in terms of BA, OA, security system, information processing and telecommunications services However, the buildings being already in existence are deficient in two areas. One of these areas is building envelope and plan. The other area is mechanical, electrical and structural systems which do not provide the environmental quality required by IB. Existing technology and design knowledge are available to address these deficiencies. Especially, the office buildings being already in existence must meet IB requirement in order to achieve desirable office environment. They are a building envelope, moisture control, properly-located windows, shafts for duct, telephone and electric closets and acoustical environments. In this paper, a new approach to construct the work scope of remodelling the office building being already existence is described by contrasting the building performance criteria of IB. It concludes by speculating on the consequences of extrapolating the results of study to remodelling the office building being already existence.

A Preliminary Studty on the Efficient Management Manpower Staffing According to the Building Size -Focused on Office Buildings- (건축규모에 따른 관리인력의 효율적 배치에 관한 기초연구 -오피스 건물을 중심으로-)

  • Lee, Won-Suk;Kim, Shin-Eun;Kim, Sun-Kuk;Lee, Dong-Hoon;Won, Il-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.191-194
    • /
    • 2010
  • Construction companies are now trying a variety of cost-cutting strategies in the midst of recent slump of construction market. Notably, contract workers and local hires are accounting for increasing portion of management manpower as a part of their cost-reduction drive. However, construction site manpower researches to date have focused primarily on productivity analysis of site laborers, with little attention to the productivity of site management resources. This study aims to analyze the staffing status of office building construction site management manpower in reference to project size. Conclusions herein will provide basic inputs for subsequent attempts to build a model to enable efficient staffing of construction site management manpower.

  • PDF

A Process for Replacing BIM Property Information about Internal Finishing of Office Building in Design Phase (업무시설 설계단계 BIM 내부마감 속성정보 교체 프로세스)

  • Han, Ji-Ho;Nam, Dong-Hee;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.207-208
    • /
    • 2023
  • The procedure of predicting the construction cost and selecting the best alternative is performed based on comparative review of each building case. In the case of office building, it is required continuously until design is complete, since the owner requirements are various and likely to change during the design process compared to a standardized apartment. However, since the comparison work for each alternative in practice uses only the unit construction cost, there is no correlation between the alternative and the final result, and it is difficult to quantitatively determine the effect of the determined design factor on the total construction cost. It is needed that a means to support the generation of design alternatives using similar building cases during the design phase. This paper proposes a BIM-based data replacing process to support creating and comparison of design alternatives of internal finishing for office building. When design alternatives are created through the proposed process, it is possible to compare several similar cases with current project under equivalent design circumstance. Because only some finishing properties are replaced while maintaining the shape information such as the length, height, and base constraint of the object to be replaced.

  • PDF

A Study on the Reasonable Selection of New Ward Office Building Site Using Analytic Hierarchy Process (AHP기법을 활용한 공공청사 신축 부지의 합리적인 선정에 관한 연구)

  • Lim, Byung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.75-82
    • /
    • 2008
  • The purpose of this study is to present the rational decision process for new ward office building site. AHP Technique used in this study considers both quantitative and qualitative factors on the basis of decision maker's intuitive, reasonable or unreasonable judgement by giving weight through mutual comparision of publicity factors. The evaluaion factors were refer to another five ward office there were executed these kinds of new site selection before. These standards are composed of 6 middle groups and classified into 9 detailed standards. Alternative building sites are five places in this district. The final evauation standards are Accessibility, Urban Expansion Possibility. Distrct balance, Environment, Financing. Development easiness. And It became clear that the priority of evaluation is Financing > Urban expansion > Accessibility > Development easiness > District balance > Environment. In conclusion, it was determined that alternative " E " is the most adequate place for new ward office building.

Who Occupies the Green Building: a Case of Australia

  • Kim, Sumin;Kim, Jinu;Lim, Benson T.H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.549-553
    • /
    • 2015
  • For successful outcome of real estate development projects, it is important to understand the potential tenants as they drive the demand for properties. The aim of this study is to investigate tenant characteristics of the Australian green office building sector. The specific objectives are to; (1) compare and contrast the increment trend of green buildings within the green office building sector; (2) identify the tenancy profile of green buildings; (3) ascertain the possible industry concentrations within the current green building sector; and (4) explore the relationship between green building occupants' characteristics and their tenancy. Descriptive statistics shows that Finance, Insurance and Real Estate (FIRE) industries along with government owned companies are the major tenants of green office buildings in the NSW State of Australia. In particular, real estate companies occupy more than half of the NSW based green office buildings whilst one third of them are the tenants of the 6-star rated buildings - the highest rated building in the current form of Australian Green Star accreditation scheme.

  • PDF

A Study of the Daylighting Performance in Obstructed Office Building in Urban Area (오피스 건물에서 인접건물이 자연채광 성능에 미치는 영향)

  • Park, Woong-Kyu;Ki, Hyun-Joo;Jeong, Chan-Woul;Song, Doo-Sam
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.5
    • /
    • pp.101-108
    • /
    • 2014
  • The performance of the daylighting in buildings depends on building site and shape. As an energy saving design strategy, daylighting is a key issue in green building design. In this paper, the influence of the adjacent or obstructed building on daylighting performance of the office building in urban area was analyzed. A typical office building about 20 storeys with obstructed buildings has been modeled and simulated using Radiance. The parametric simulations have been performed to analyze the influence of the daylighting performance (illuminance, luminance) of the analyzed office. The results show that the possibility of the glare was decreased when the obstructed building is located in south, also the illuminance level was significantly decreased. When the obstructed building is located in north, the changes of the illuminance level and luminance possibility were somewhat small compared to the unobstructed condition. The daylighting performance of the analyzed building was most affected by the obstructed building in winter season.

The Meaning of "modern style (hyundae-sik)" in Related Documents of the ROK Office in the 1950s (1950년대의 한국에서 신축 정부청사 관련 문건에 나타난 "현대식"의 의미)

  • Lee, Sumin;Woo, Don-Son
    • Journal of architectural history
    • /
    • v.27 no.5
    • /
    • pp.17-26
    • /
    • 2018
  • In 1961, the Republic of Korea's first newly-constructed government building was completed. The government building, as ROK office, was erected as a twin with the USOM office in Sejong-ro. The reason why the ROK office and the USOM office were erected as a twin building is that the two offices were part of Foreign Operation Administration's Seoul Buildings Project in 1954. Within the project, the FOA office and the ROK office were rarely separated, and naturally, the ROK office was built according to the US standards. The planning, design, and construction phases which led by the US government were involved in the US architecture, engineering-construction companies. Because those AEC companies were familiar with the US technology and standards. In the phase of construction, Korean companies took part in the process under the supervise of Vinnell Corporation. The US expected to transfer its 'modern' and 'developed' technology through this process. The completed ROK office was widely known as the 'modern style (hyundae-sik)' building, which was body forth as glasses and new facilities. These factors were what the US emphasized for exporting architecture. The modifier, 'modern style (hyundae-sik)', given to the ROK office in the 1950s was a synonym for any new feeling that had never been seen hitherto. The newness of the ROK office, the 'modern style (hyundae-sik)' building, was specified as materials and facilities that indicates modern technology while in the absence of adequate knowledge.

A study of LCA(Life Cycle Assessment) to a office building remodeling - Focused on Electrical Equipment - (사무소건축 리모델링에서의 전과정 평가에 관한 연구 - 전기 부분을 중심으로 -)

  • Lee, Seon-Dong;Yoo, Ho-Chun
    • Journal of the Korean Solar Energy Society
    • /
    • v.24 no.3
    • /
    • pp.85-92
    • /
    • 2004
  • Environmental issues become one of today's central concerns due to draining natural resources and environmental pollution. Architecture is given a great deal of weight on the evoking environmental pollution. In this point of view, polluting factors in architectural planning and construction were predicted in advance and alternative plans were studied, In investigation of alternative plans, both environmental pollution and economical efficiency of various alternatives were considered. A office building was analyzed for energy consumption and construction environmental load by appling LCA. Applying LCA to a office building includes a total amount of materials and energy consumption, environmental impacts and economical efficiency evaluation. In present study, LCA applied to electrical part of a office building and economical efficiency evaluation was considered.