• Title/Summary/Keyword: Offshore Plant

Search Result 403, Processing Time 0.032 seconds

A Study on the Entry of Korean Shipping & Logistics Company into the Offshore Plant Logistics Service Market

  • Shin, Seok-Hyun;Kwon, Moon-Kyu;Park, Jin-Hee;Park, Young-Kyu
    • Journal of Navigation and Port Research
    • /
    • v.39 no.2
    • /
    • pp.125-130
    • /
    • 2015
  • Korea is worldwide top manufacturer of offshore plant industry, while shown weakness in high-valued offshore plant service industry (OPSI). The governmental support policies and studies for fostering programs are centered on shipbuilding and engineering sector. On the other hand, offshore logistics service sector among the programs is neither included as governmental fostering support sectors nor ever-studied. Domestic shipping and logistics companies have many experience of handling various project, heavy-lift cargo and even super blocks on shipbuilding industry. However they are faced with lack of appropriate heavy carrier and others. So for their successful entering into offshore plant logistics market, systematic preparation, studies and supporting policies are highly recommended.

Development and Working Efficiency of Supporting Program for the Parametric Electrical Outfit Production Design of Offshore Plant Based on PML (PML 기반 파라메트릭 해양플랜트 전장생산설계 지원 프로그램 개발 및 업무 효율성 연구)

  • Kim, Hyun-Cheol;Kim, Jong-Myung
    • Journal of Ocean Engineering and Technology
    • /
    • v.33 no.3
    • /
    • pp.205-213
    • /
    • 2019
  • Recently, because of the global recession of the offshore plant industry and low-cost orders, there has been increasing interest in strengthening the competitiveness of domestic companies for the design and production technologies of offshore plants. However, in the offshore plant design field, the Plant Design Management System (PDMS), which is a 3D CAD program for plant layout developed by AVEVA Marine, is already commonly used as offshore plant design software and widely used in large domestic shipyards and cooperative design companies. Under this background, we have been thinking about ways to design better with the existing software. In this study, we developed a parametric design program to maximize the efficiency and reduce the working time for offshore plant electrical outfit production design based on the Programmable Macro Language (PML) of PDMS. We also examined its performance. By applying the developed program to the offshore plant module selected as an application example, it was confirmed that a 50% improvement in the work efficiency of cable tray design could be obtained compared with the existing method, with work efficiency improvements of 80% or more in other field design work.

A Study on Siting of HVAC Offshore Substation for Wind Power Plant using Submarine Cable Cost Model (해저케이블 비용 모델을 이용한 HVAC 해상변전소 적정 위치 선정에 관한 연구)

  • Won, Jong-Nam;Moon, Won-Sik;Huh, Jae-Sun;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.4
    • /
    • pp.451-456
    • /
    • 2013
  • Development of the technologies for offshore wind power is proceeding actively and the installation capacity is continuously increasing because of its many advantages in comparison with the land wind power. Accordingly, project for Southwestern 2.5GW offshore wind power plant is in progress in Korea. Design of electric power systems for offshore wind power plant is very important due to its high investment and operational costs. Hence, it needs to be designed in order to minimize costs. This way can be employed in determining the installation location of offshore substation for HVAC wind power plant. According to the offshore substation site, MV inter-array cable and HV export cable lengths vary and they change a total cost regarding submarine cable. This paper represents cost models with variables which are MV inter-array cable and HV export cable lengths to locate the offshore substation for HVAC wind power plant. It is classified into submarine cable installation cost, reactive power compensator installation cost, ohmic losses, and unsupplied energy cost. By minimizing a total cost, an appropriate installation site of the offshore substation is determined.

A Study for Definition and Classification of Offshore Units (해양시설 용어 정의 및 분류 체계에 관한 일고찰)

  • LIM, Youngsub;KWON, Do Joong;LEE, Chang-Hee
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.29 no.3
    • /
    • pp.689-701
    • /
    • 2017
  • In recent offshore industries, various ambiguous terms have been used without clear definition or classification, causing difficulties in legal, technical, and educational understanding and usage. For an example, the commonly used term of 'Offshore Plant' in Korea is not an universal word technically. There has been no clear technical or legal definition about the 'Offshore Plant' and its classification is also very ambiguous; sometimes it is used to refer offshore oil and gas production platform or it is used to mean offshore renewable power generation plant in some cases. To build a conceptual framework, therefore, this paper suggests a classification of offshore units (1) using internationally agreed terms, (2) agreed with the technical classification used by the ship classification society and (3) being able to include not only the current but also future concepts of offshore units.

Risk-based Design of On-board Facility for Lifting System Field Test of Deep-sea Mining System (심해저 광물자원 양광시스템 실증 시험을 위한 위험도 기반 선상 설비 설계)

  • Cho, Su-gil;Park, Sanghyun;Oh, Jaewon;Min, Cheonhong;Kim, Seongsoon;Kim, Hyung-Woo;Yeu, Tae Kyung;Jung, Jung Yeul;Bae, Jaeil;Hong, Sup
    • Journal of Ocean Engineering and Technology
    • /
    • v.30 no.6
    • /
    • pp.526-534
    • /
    • 2016
  • This study had the goal of designing onboard structures for a pre-pilot mining test (PPMT), which is required for the commercialization of the deep-sea mining industry. This PPMT is planned to validate the performance of a hydraulic lifting system and verify the concept of operating through a moon-pool in the east sea, Korea. All of the onboard equipment and facility were designed by KRISO. Because the test was performed at the first development, it is difficult to determine what risk will occur in the facility. Therefore, risk-based design is required in the facility for the PPMT, which includes the facility layout, failure mode and effect analysis (FMEA), and risk reduction plan. All of the expected performances of the lifting system itself and the onboard facilities were qualitatively validated using the risk-based design.

A Study on the Simplified Model for the Weight Estimation of Floating Offshore Plant using the Statistical Method (통계적 방법을 이용한 부유식 해양 플랜트의 중량 추정용 간이 모델 연구)

  • Seo, Seong-Ho;Roh, Myung-Il;Ku, Nam-Kug;Shin, Hyun-Kyung
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.50 no.6
    • /
    • pp.373-382
    • /
    • 2013
  • The weight of floating offshore plant, such as an FPSO(Floating, Production, Storage, and Off-loading unit) and an offshore wind turbine, is important for estimating the amount of production material and for determining the production method. Furthermore, the weight is a factor which affects in the building cost and production time of the floating offshore plant. Although the importance of the weight has long been recognized, the weight has been roughly estimated by using the existing design and production data, and designer's experience. To solve this problem, a simplified model for the weight estimation of the floating offshore plant using the statistical method was proposed in this study. To do this, various data for estimating the weight of the floating offshore plant were collected through the literature survey, and then the correlation analysis and the multiple regression analysis were performed to generate the simplified model for the weight estimation. Finally, to examine the applicability of the developed model, it was applied to examples of the weight estimation of an FPSO topsides and an offshore wind turbine. As a result, it was shown that the developed model can be applied the weight estimation process of the floating offshore plant at the early design stage.

Experimental Study of Water Impact Loads on Symmetric and Asymmetric Wedges (대칭 및 비대칭 2차원 쐐기의 입수 충격에 관한 실험적 연구)

  • Kim, Kyong-Hwan;Lee, Dong Yeop;Hong, Sa Young;Kim, Young-Shik;Kim, Byoung Wan
    • Journal of Ocean Engineering and Technology
    • /
    • v.28 no.3
    • /
    • pp.209-217
    • /
    • 2014
  • In the present study, the water impact loads on two-dimensional symmetric and asymmetric wedges were mainly studied. The impact pressure and force were measured during a vertical drop of the symmetric and asymmetric wedges. The measured pressure was compared with analytic solutions. The measured force at a local area of the wedge was compared with the integrated pressures and analytic solutions. Some findings on symmetric and asymmetrical wedge drops are presented, and the reliability of the force sensor used for the measurement of the local impact force is discussed.

Study of Process for Offshore LNG Production (해상에서의 LNG 생산을 위한 공정 고찰)

  • Kim, Seung-Hyuk;Ha, Mun-Keun;Kim, Byung-Woo;Sadasivam, M.;Koo, Keun-Hoe
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.119-123
    • /
    • 2002
  • Liquefied Natural Gas(LNG) continues to attract modern gas industries as well as domestic markets as their main energy source in the recent years. This is mainly because LNG is inherently cleaner and more energy efficiency than other fuels. Offshore LNG production plant is of interest to many oil producing companies all over the world. This article discuss about the production process encountered while developing such a production facility. Typical offshore oil and gas processing required for oil stabilization and other optional units that can be added to the facilities. The production process can broadly be divided into five major units namely, (i) Oil Stabilization unit, (ii) Gas Treatment unit, (iii) Methane Recovery unit, (iv) Distillation unit and (v) LNG Liquefaction unit. The process simulation was carried out for each unit with a given wellhead composition. The topside facilities of offshore LNG production plant will be very similar to the process adopted in offshore processing platform along with the typical onshore LNG production plant. However, the process design problems associated with FPSO motion to be taken care of while developing floating LNG production plant.

  • PDF

An Experimental Analysis of the Impact of Green Water on Offshore Platforms with Green Water Protectors of Various Shapes

  • Lee, DongHyun;Jeon, MyungJun;Nguyen, Van Minh;Yoon, Hyeon Kyu
    • Journal of Advanced Research in Ocean Engineering
    • /
    • v.2 no.3
    • /
    • pp.136-149
    • /
    • 2016
  • Green water impact occurs frequently on offshore platform due to waves with a height greater relative to the freeboard of the structure. This phenomenon exerts a large impact load on the deck. In this paper, offshore platform models with green water protectors of various shapes were fixed to the center of a 3D wave tank to measure the impact pressure acting on the various points on deck and protectors. The impact pressure distribution differed depending on the protector shape, and various patterns of wave creeping up the protector were observed. The protector shape that exerted the lowest pressure impact on the deck will be useful in the deck design of offshore platform, and the model test results will be expected to be used for designers to select the best protector form.

Optimal design of offshore production considering market demand (시장 수요를 고려한 Offshore Production의 최적화 설계)

  • Kim, Chang-Su;Kim, Si-Hwa
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2014.10a
    • /
    • pp.53-55
    • /
    • 2014
  • Offshore 에서의 oil & gas 생산은 해상이라는 환경으로 인한 고유의 특성 때문에 항상 다수의 변수들에 영향을 받으며, 막대한 비용이 소요되기 때문에 비용을 최소화하며, 비용 대비 수익을 최대화시키기 위한 optimal design이 필수이다. 본 논문은 가상의 offshore plant와 이에서 생산된 oil의 수요지들을 설정하여 시장수요에 따른 offshore 생산의 최적화 문제를 연구대상으로 하며, 다수의 offshore oil fields를 보유한 major oil company가 당면할 수 있는 offshore production에 관한 문제를 일반화하여 정의하고, 이윤을 극대화시킬 수 있는 최적화 모형을 혼합정수계획모형(mixed integer programming)으로 정식화 하였다. 최적화 모형의 해는 Microsoft office excel solver를 통해 구하였으며 그 계산실험의 결과를 요약하여 보고한다.

  • PDF