• Title/Summary/Keyword: Operation rule curve

Search Result 30, Processing Time 0.029 seconds

Operation rule curve for supplying urban instream flow from reservoir (도시 하천유지유량 공급의 저수지 운영 방법)

  • Noh, Jae-Kyoung;Lee, Jae-Nam
    • Korean Journal of Agricultural Science
    • /
    • v.38 no.1
    • /
    • pp.163-172
    • /
    • 2011
  • To provide the operation rule curve for suppling instream flow to urban stream from reservoir, the Soho reservoir with watershed area of 7.4 $km^2$ and total water storage of 2.58 $Mm^3$ was planned at the headwaters of the Daejeoncheon. Daily streamflow was simulated and using the simulated streamflow and desired instream flow, the operation rule curve by Senga method was drawn and evaluated through reservoir operation. Senga method is derived by accumulating the differences between streamflow and desired instream flow adversely. Water storages were simulated on a daily basis to supply urban instream flow from Soho reservoir, but the amount of supplying instream flow to urban stream was not nearly increased comparing with that of normal operation that does not used the rule curve. Thereafter the new simulation-based operation rule curve was derived and applied to supply instream flow from Soho reservoir. In normal operation, the amount of instream flow was shown to 15,000 $m^3$/d, but it was increased to 27,700 $m^3$/d in withdrawal limited operation using the new derived rule curve, in which the applicability of this rule curve was proved. Also comparing with the flow duration curves at station just before urban Daejeoncheon stream without and with upstream Soho reservoir, the 95th flow was decreased from 1.64 mm/d to 1.51 mm/d, and the 355th flow was increased from 0.17 mm/d to 0.30 mm/d. Monthly streamflows during October to March were increased from 10.6~24.1 mm to 24.1~34.0 mm with the increasing rate of 141~227%.

Operation Rule Curve for Reservoir with Low Areal Ratio of Watershed to Downstream Paddy Field (유역배율이 작은 저수지의 이수관리방법)

  • Noh, Jae-Kyoung
    • KCID journal
    • /
    • v.18 no.1
    • /
    • pp.68-80
    • /
    • 2011
  • To provide a operation rule curve for reservoir with low ratio of watershed area to paddy field area, Duckyong reservoir with watershed area of $15.8km^2$ and paddy field area of 1,071ha was selected, in which 4 meters are being heightened and full water levels will be increased from EL.26.0m to EL.30.0m, total water storages from 365.6M $m^3$ to 708.0M $m^3$. There was no operation rule curve that satisfied over 90% reliability of water supply in reservoir with watershed area of 1.48 times of paddy field area. The differences between observed and simulated reservoir daily water storages were minimized to determine parameters for simulating reservoir inflow in case of paddy field area of 550ha from 1991 to 2010. A operation rule curve was drawn to have a maximum storage with total water storage, which was in paddy field area of 700ha with ratio of 2.3 between watershed area and paddy field area. This case showed that annual irrigation water supply was 668M $m^3$ and instream flow of 57M $m^3$, water supply reliability of 55.6% in normal operation, and annual irrigation water supply was 605M $m^3$ and instream flow of 38M $m^3$, water supply reliability of 95.6% in withdrawal limited operation. Water supply reliabilities showed 35.6% without flood regulation and 17.8% with flood regulation in existing reservoir before heightening.

  • PDF

Evaluation of the State of Drought by the Operation Rule Curve in the Irrigation Reservoir (관개저수지의 기준저수량 곡선에 의한 한발 평가)

  • 이재면;김영식;김태철
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.117-122
    • /
    • 1999
  • The state of drought was evaluated by the operation rule curve. From the present percentage of reservoir storage and the operation rule curve, it could be determined to ristrict the irrigation water supply to a certain level and eventually to overcome the shortage of water in the irrigation reservoir.

  • PDF

A Rotational Irrigation Scheduling for an Irrigated Paddy Blocks with Operation Rule Curve (이수관리곡선에 의한 논 관개지구의 윤환관개모형)

  • 김태철;이재면;이덕주
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.5
    • /
    • pp.67-76
    • /
    • 2003
  • The principal operation rule of irrigation reservoir is to accelerate the water use and supply water actively when water is sufficient, and to restrict water use and supply water deficiently in order not to stop the irrigation activity when water is scarce. In drought seasons. water should be saved in order to keep the reservoir not to be dried up during the irrigation season. It is important to know how much water should be saved, depending on the rice-growing season and water storage volume. For the drought control of irrigation reservoirs. the rotational irrigation scheduling in paddy with the operation rule curve developed in this study could be utilized as a software program to install TM/TC system for irrigation water supply by automation facilities.

Management of Irrigation Reservoir to Overcome Drought by Operation Rule Curve and WWW (이수관리곡선과 WWW 에 의한 관개저수지의 이수관리)

  • 민진우;문종필;김영식;박승기;김태철
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.81-86
    • /
    • 1998
  • It is difficult to know how to restrict the amount of water supply in the drought season, because there is no objective standard rules. The purpose of the study is to present management rules to overcome the drought in the irrigation reservoir by forecasting the water level and restricting water supply according to the operation rule curve and the pattern of rotation-irrigation system. From the operation rule curve drawn up by analyzing the observed water level of reservoir, the water supply rules and rotation-irrigation patterns using WWW and GIS are suggested.

  • PDF

Development of Multi-Reservoir System Operation Rule Curves for Hydropower Maximization in the Nam Ngum River Basin of Lao PDR (라오스 남능강 유역 다중 저수지 시스템의 최적 수력발전 운영규정 곡선 개발)

  • Lee, Hyun-Jae;Jang, Woong-Chul;Lee, Il-Ju;Lee, Jin-Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.803-814
    • /
    • 2022
  • The Lao government is continuously developing hydro-power dams in addition to the existing eight power plants in the Nam Ngum River basin and is expanding the power capacity of the existing power plants to meet the expected increase in electricity demand. Accordingly, the Lao government has requested an update on the existing reservoir operating rule curve in order to run the power plants efficiently. To this end, this study reviewed the current independent operating system as well as the joint operating system in order to maximize the annual power generation produced by a power plant by using CSUDP, general-purpose dynamic programming (DP) software. The appropriate operating regulation curve forms (URC/LRC, MRC) were extracted from the DP results, and the annual power generations were simulated by inputting them as the basic operating data of the reservoir operation set of the HEC-ResSim program. By synthesizing the amount of the annual power generation simulated, the existing operation regulation curve, the operational performance, and the opinion of the field operator, the optimal reservoir operation regulation curves that maximize the annual power generation of the target power plant were developed. Results revealed that a system operating in conjunction with the reservoir produces about 2.5 % more power generation than an independent reservoir due to the synergistic effect of the connection.

Rural Water Supply from the Irrigation Reservoir

  • 김대철;박성기
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.37 no.E
    • /
    • pp.47-54
    • /
    • 1995
  • Irrigation water has been mainly used for paddy rice. Irrigated paddy land tends to be recently converted to land for green house, farm house, and rural-industrial complex. Consequently, demand of water for crops, domestic & industrial, rural recreations, small-scaled hydropower, livestocks, and environment in the rural area, so called rural water, is rapidly increasing. In order to supply rural water, water in the existing irrigation reservoir could be enlarged by repairment of irrigation canal and reinforcement of irrigation reservoir, and be saved by the operation rule curve, utilization of dead water, and balanced storage management.

  • PDF

Evaluation of Supplying Instream Flow by Operation Rule Curve for Heightening Irrigation Reservoir (이수관리곡선에 의한 증고저수지의 하천유지유량 공급 가능성 평가)

  • Lee, Jae-Nam;Noh, Jae-Kyoung
    • Korean Journal of Agricultural Science
    • /
    • v.37 no.3
    • /
    • pp.481-490
    • /
    • 2010
  • Baekgog reservoir is located in Jincheon county, Chungbuk province, of which full water levels will be heightened from EL. 100.1 m to EL. 102.1 m, and total storages from 21.75 $Mm^3$ to 26.67 $Mm^3$. The simulation for reservoir inflow was conducted by DAWAST model. The annual average irrigation water was estimated to 33.19 $Mm^3$ supplied to 2,975 ha and the instream flows could be allocated with 0.14 mm/d from October to April with annual average of 2.52 $Mm^3$. The operation rule curve was drawn using inflow, irrigation, and instream flow requirements data. The reservoir water storage was simulated on a daily basis in case of both normal and withdrawal limit operation. In case of normal operation, the annual average irrigation water supply increased from 31.95 $Mm^3$ to 33.32 $Mm^3$, the instream water supply from 2.40 $Mm^3$ to 2.44 $Mm^3$, the water storages from 15.74 $Mm^3$ to 19.88 $Mm^3$, and the water supply reliability from 77.3 % to 81.6 %. In case of operation with withdrawal limit, the amount of instream water supply was 2.52 $Mm^3$ from reservoir regardless of the condition while the water storage increased from 16.77 $Mm^3$ to 20.65 $Mm^3$. The irrigation water supply capacity was appropriate for the case of normal operation with 2 m heightened condition. The present instream water supply capacity was 35,000 $m^3$/d (6.86 $Mm^3$/y) while 42,000 $m^3$/d (8.36 $Mm^3$/y) in 2 m heightened condition in case of withdrawal limit operation.

A Comparative Study of Reservoir Operations for Flood Control of the Chungju Dam (홍수시 충주댐 운영방안의 비교검토)

  • 이길성;정동국
    • Water for future
    • /
    • v.18 no.3
    • /
    • pp.225-233
    • /
    • 1985
  • To develop a simulation strategy of multi-reservoir operation in flood season, the single dam operations methed for the Chungju dam are investigated in the Han river basin. Thus, spillway rule curve, rigid ROM, and linear decision rules are applied for control operations, subject to the restrictions imposed by the river and the reservoir characteristics. The storage and release and control/utility efficiencies for several floods are calculated. The variation of control coefficients with respect to the return period are also examined. As the results of this comparative study, the optimal operation method can be selected in terms of the magnitude of flood. With inflow forecasting, the flood control operation can be greatly improved by variable coefficients rigid ROM and linear decision rules.

  • PDF