• Title/Summary/Keyword: PQMS

Search Result 13, Processing Time 0.025 seconds

Power Quality Monitoring System Using DWB on Distribution Automation System (DWB를 이용한 배전자동화 기반의 전기품질 모니터링 시스템 구축)

  • Kang, Moon-Ho;Lee, Heung-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.9
    • /
    • pp.86-93
    • /
    • 2011
  • The necessity of Power Quality(PQ) Management grow bigger because the disturbance strength in power system is increasing, on the other hand, the tolerance of electrical components is reducing with widely use of the IT and digital equipments. The domestic management standards on power quality are enacted based on the IEC standards in recent. Since the IEC standards defines the measurement and evaluation point on PQ as PCC(Point of Common Coupling) which is normally the point of penetration between customer and power company, the PQ monitoring system(PQMS) should be made to measure and manage the PQ of custom effectively. In this paper, therefore, the economical construction plan on PQMS using the wireless communication channel in distribution automation system is suggested, and the usefulness of the PQMS are shown by analyzing the PQM data with IEC standards.

A Study on the Economical PQMS of the Utility Distribution Power System (전력회사 관점의 배전계통 경제형 PQM 시스템 구축방안)

  • Park, Yong-Up;Lee, Keon-Hang
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.9
    • /
    • pp.1523-1529
    • /
    • 2010
  • This paper describes the distribution power system econimical PQMS(Power quality monitoring system) of Utility. Recently, the korea power quality standard has been established based on the IEC Std. By IEC Std., the power quality assessment point is measured in PCC(Point of common coupling). In this case, the utility has to construct PQM system in all customer PCC point and the PQ meter cost would be very high in order to acquire the suitable data. Also the distribution system would be encounter the communication overload problem due to the huge data. Accordingly the utilities could not apply to PQM system in the distribution power system by the cost and communication problem. In this paper, the proposed economical PQMS has the voltage and current signal reiteration function and FFT operation function is transferred the server. Also the voltage and current measurement channels are minimized by a classified substation construction.

Database Modeling for Pre-qualification Management System (Pre-qualification 관리 시스템을 위한 데이터베이스 모델링)

  • Do, Namchul;Park, JongJin;Lee, Jeongyoul;Lee, Jae Hyun
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.6
    • /
    • pp.407-416
    • /
    • 2013
  • Acting an important risk management tool for main contractors, pre-qualification has served a key marketing tool for subcontractors in various industries. Current industrial environment has required the time intensive pre-qualification ability to small and medium-size subcontractors as a matter of competitive business. In order to support the subcontractors, this paper proposes a database model for pre-qualification management system (PQMS) that automates the pre-qualification process by using information technologies. The modeling process consists of specifications for its requirements, functional modules, and a database model for the PQMS.

Power Quality Monitoring System with a New Distributed Monitoring Structure

  • Won, Dong-Jun;Chung, Il-Yop;Kim, Joong-Moon;Ahn, Seon-Ju;Moon, Seung-Il;Seo, Jang-Cheol;Choe, Jong-Woong
    • KIEE International Transactions on Power Engineering
    • /
    • v.4A no.4
    • /
    • pp.214-220
    • /
    • 2004
  • Power quality monitoring is the cornerstone for power quality analysis, diagnosis and improvement. The measurement of power quality (PQ) evolves from instantaneous metering to continuous monitoring. Furthermore, recent technologies enable us to construct more flexible, reliable, rapid and economical power quality monitoring system (PQMS). Therefore, this paper presents an improved PQMS with a new distributed monitoring structure. The proposed PQMS consists of a PQ meter, PQ analyzer and GUI. The PQ meter only collects raw data and the PQ analyzer performs power quality analysis. It has several advantages compared to conventional structures in economic efficiency, modularity, speed, etc. PQ monitoring algorithms to catch steady-state trends and to detect PQ events are also adapted to the proposed structure. Using the proposed structure and monitoring algorithm, a prototype PQMS is constructed and real-time testing is performed.

The field-test of Power Quality Meter and Power Management System in order to verify the performance (PQM 및 PQMS 성능검증을 위한 실증시험)

  • Choi, Sun-Kyu;Song, Il-Keun;Kwon, Tae-Ho;Han, Jae-Wook
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.235-239
    • /
    • 2005
  • This paper gives a field-test method and result of PQM(Power Quality Meter) and PQMS(Power Quality Management System). The field-test was carried out as our own method. So, the test method has several kinds of improvement in this paper because it is first time to try the field-test of the equipment. However, we expect that the test result of PQM & PQMS has been used as a reference data which makes a scheme of evaluating performance of the equipment that has been used or is developed.

  • PDF

A Case of the Distribution Power System PQMS Construction & Harmonic Voltage Analysis (배전계통 PQM 시스템 구축 및 고조파전압 분석사례)

  • Park, Yong-Up;Lee, Keon-Hang
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.9
    • /
    • pp.108-117
    • /
    • 2010
  • The main contents of this paper are the PQM system construction case and distribution system harmonic voltage analysis. The PQM system has constructed by KEPCO in order to investigate power quality of distribution power system for new power quality standard of KEPCO. In result, we have confirmed that voltage harmonic measurement value of the high voltage contract customer 8 households is suitable the KEPCO harmonic standard tentative plan. And the voltage harmonic value of distribution line end side is not always more high than source side by harmonic current offset effect. In the future, acquired data by season, region, load from the PQMS will be used on the resonable harmonic standard enactment in KEPCO.

A case of the PQMS construction in the distribution power system (배전계통 고조파 상시감시 시스템 구축 및 측정사례)

  • Park, Yong-Up;Choi, Sun-Kyu;Lee, Byung-Sung
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.418-419
    • /
    • 2011
  • Recently, the korea power quality standard has been established based on the IEC Std. By IEC Std., the power quality assessment point is measured in PCC. In this case, the utility has to construct PQM system in all customer PCC point and the PQ meter cost would be very high in order to acquire the suitable data. Accordingly the utilities could not apply to PQM system in the distribution power system by the cost and communication problem. In this paper, the proposed economical PQMS(Power quality monitoring system) of Utility.

  • PDF

An Analysis the Distribution Power System Voltage Sag Case by a High Capacity Motor Connection (대용량 전동기 기동시 배전계통의 순간전압강하 발생사례 분석)

  • Park, Yong-Up;Lee, Keon-Hang
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.10
    • /
    • pp.143-148
    • /
    • 2010
  • Recently, the KEPCO is constructing the PQMS(Power Quality Monitoring System) each of the distribution line and will establish the voltage sag standard based on the long time measurement data of PQMS. The voltage sag prospect is difficult for the power system manager, however, the voltage sag forecasted is very important because the damage effect of the voltage sag is very broad. This paper describes the prospect formula of the voltage sag magnitude in the PCC(Point Common Coupling) by the starting current when the high capacity equipment is connected with the distribution line. To achieve this, this paper has proposed the sag prospect formula revision of KEPCO for the reliability improvement and the proposed formula has been applied the voltage sag real case to inspect the calculation procedure and reliability.

Development of Power Quality Monitoring System(PQMS) : Database Design for PQMS (전력품질 감시 시스템 개발(1): 전력품질 데이터베이스 설계)

  • Kim, Young-Il;Bahng, Soon-Jung;Han, Jin-Hee;Yun, Tae-Wook
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.128-130
    • /
    • 2003
  • Recently, with the increasing use of power semiconductors and microprocessors which are very sensitive to little change of power quality and power market being formed according to the reorganization of the power market, power providers and consumers show much interest in the power quality problem. This situation makes the demand creation of integrated system for power quality analysis and monitoring based on speedy and powerful functions by the growth of computer hardware and information technology, and besides advanced corporation already have created and employed power quality analysis and monitoring system. In this papers, it will be introduced that power quality database design-database is essential to integrated system-for managing effectively and confidently data from the power quality meters(PQM).

  • PDF

Development of Power Quality Analysis Program of Distribution Systems (실배전 계통의 전력품질 분석프로그램 개발에 관한 연구)

  • Cho, Yong-Gun;Kwon, Hun;Park, Yong-Bum;Lee, Kyoung-Bai;Kim, Sun-Il;Lee, Eun-Woo;Hong, Kyu-Seog;Kim, Jae-Eon
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.375-377
    • /
    • 2003
  • 수용가에게 영향을 끼치는 전력품질 문제를 다루기 위해서는 3상 전압변동, 전압불평형, 순간전압상승(Swell), 순간전압강하(Sag), 순간정전(Interruption)등의 발생시 측정된 Data들을 근간으로 하여 전력품질을 분석할 필요가 있다. 본 논문에서는 이를 위해 개발된 PQMS DataBase 분석프로그램을 소개하기로 한다.

  • PDF