A Study on the Design Meghod for PSC I Girders with additional Prestress (프리트스레스를 단계적으로 도입하는 PSC I형 거더의 설계에 관한 연구)

  • 한만엽;김양현;진경석
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.04a
    • /
    • pp.375-380
    • /
    • 1999
  • It is required efficient section shape like bulb-tee girders with high strength concrete to construct long span bridges economically. However, the trpical design method for PSC I-girders include bulb-tees, the concrete girder prestressed only one time at same time. But in this paper, new design method prestress increases as each load-stress stage. The incrementally prestressed concrete (IPC) girders can reduce the required area of grider section and extend span length by additional prestress. So it is able to construct long span bridges economically by using IPC girders.

  • PDF

Flexural Behavior of Precast PSC Segmental I Girder (Precast PSC-Segmental I형 거더의 휨거동에 관한 연구)

  • Hong, Sung Nam;Kim, Kwang Soo;Park, Sun Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3A
    • /
    • pp.421-428
    • /
    • 2006
  • This study was performed by using experiment to minimize behavior difference of Monolithic and segmental Girder and to prove the design concept of the PSI (Precast PSC-Segmental I Grider). A full scale girder test was performed in four different cases, the monolithic girder, the segmental girder type-1, the segmental girder type-2 and the segmental girder type-3. The monolithic girder that was produced in one body 25 m span and the segmental girder that was jointed 5-sliced 5 m segment. The girder was built by as one body prestressing the tendons after manufacturing the segmental girder, and second prestressing after the casting of the slab concrete. The test result shows that the measured values were almost same or slightly bigger than the theoretical values which means that the PSI girder bridges concept came out to be reliable.

Long Term Monitoring of Prestressing Tension Force in Post-Tension UHPC Bridge using Fiber Optical FBG Sensor (FBG 광섬유센서가 내장된 7연 강연선을 이용한 포스트텐션 UHPC 교량의 긴장력 장기모니터링)

  • Kim, Hyun-Woo;Kim, Jae-Min;Choi, Song-Yi;Park, Sung-Yong;Lee, Hwan-Woo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.28 no.6
    • /
    • pp.699-706
    • /
    • 2015
  • This paper presents results of one-year monitoring on prestressing force of a 7-wire steel post-tensioning strand which is installed in a UHPC(ultra high performance concrete) bridge with 11.0 m long, 5.0 m wide, and 0.6 m high by using a FBG-encapsulated 7-wire steel strand. The initial prestressing forces and the prestress changes during a vehicle load test were measured using the FBG-encapsulated strand. The results show that the FBG-encapsulated 7-wire strand is very effective for monitoring the prestress forces even the change in the tension force is very small. Additionally, it was indicated that selection of the thermal expansion coefficient which is used for the temperature correction shall be carefully carried out.