• Title/Summary/Keyword: Payability

Search Result 7, Processing Time 0.026 seconds

A Study on Optimal Selection System for the Engine Horsepower of fishing Vessels Longer than 24m (24m 이상 어선의 최적 기관마력 설정 모형에 관한 연구)

  • 박제웅;이근무
    • Journal of Ocean Engineering and Technology
    • /
    • v.17 no.2
    • /
    • pp.77-84
    • /
    • 2003
  • The excessive cost of building ships causes the instability of payability, which manage poorly fishing vessels longer than 24m. As a result, an officer evades embarkation and a vicious circle is repeated. In this study, the optimal engine horsepower system for fishing vessels longer than 24m was invented to develop the most efficient engine horsepower, and also a database program for the most efficient engine horsepower has been developed based on the type of and their size.

A Case Study on the MRI Profitability of a General Hospital (한 종합병원의 MRI 채산성 사례 연구)

  • Kang, Chang-Yeol;Song, Sung-Ho;Lim, Kyeong-Tae
    • The Korean Journal of Health Service Management
    • /
    • v.4 no.1
    • /
    • pp.145-156
    • /
    • 2010
  • The purpose of this study is one of high price medical equipment wished to grasp propriety factor about the MRI introduction, analyzing payability through cost accounting into compensation. It was investigated from January 1 to December 31, 2007 about the MRI of a General Hospital. Expectation availability was 23.2 cases, but actual availability did achievement more than 196.1% with 45.5 items. It is estimated that there are a lot of occurrence cases because great reasons that actual availability increases more than expectation availability is excellent resolving power than a CT, and is device that prefer to reason back that radiation damage is less in person body. The followings show the main results of this study. 1. The MRI was construed in order of cost accounting, wave and personnel expenses 45.4%, administrative expenses 53.0%, and material costs 1.6%. 2. According to CVP (Cost-volume-profit) analysis, BEP (Break Even Point) profit is 173,931,428 won for 11 months, and break even usage number of items are 37.5 cases, and separation usage number of items were confirmed by 1.4 cases. Therefore, was construed that can achieve BEP within 11 months though usage number of items keeps 1.4 items day to create the MRI's hospital operation profit. 3. Estimated limit profitability appears high by 96.7%, exceed fixed charges even if when is non-benefit and when it is benefit consider variable, is judged that the MRI's addition induction helps in hospital management enhancing earning rates.

A Railway Construction Efficiency Plan by Using Project Management Information System (프로젝트정보관리시스템을 활용한 철도공사 효율화 방안)

  • Lee, Tai-Sik;Park, Jang-Hee;Kim, Young-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1532-1537
    • /
    • 2004
  • Downtown traffic culture of the car focus of our country have developed. But, it was been interested in railroad to saturation of situation, environmental problem. Also, it is getting interest which is international by departure point of network connecting from Europe to Northeast Asia. Private capital project of railroad is activated but Construction companies payability is real that is worsen day by day. Therefore, Construction companies is destroying element enterprise's inefficiency and the waste, be interested in Project Management Information System as part of information. I wish to approach in efficiency of railway construction by presenting professional construction company's Project Management Information System.

  • PDF

A Study on Development of Construction Engineering Business Survey Index (건설엔지니어링 기업경기실사지수 개발에 관한 연구)

  • Kim, Hyun-Woo;Chin, Kyung-Ho;Lee, Kyo-Sun;Kim, Mi-Ri
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.54-62
    • /
    • 2012
  • Currently, construction engineering industry of high value and rapid growing has been viewed as a future oriented industry. Thus, compared to other industries, its analysis system for business trend seems insufficient. This research has developed a business survey index model targeted for construction engineering industries, and business trends for 4/4 quarter of 2011 as well as 1/4 quarter of 2012 were surveyed as important traits were analyzed. Business Survey Index of Construction Engineering has been constructed in form of an index in order to accurately judge different economic states of the industry such as funding areas, human resources, payability, ordering scale, status of domestic and foreign markets, Difficulties in Management, and improvements in policies. In the future, CEBSI will not only be applied on the construction engineering industry, but it will also be used as the economic state of all construction industries as well as the prospect data. Thus, it will be utilized as basic resources that can establish systematic and accurate policies.

A Study on the Determination of Grout Injection Volume according to the Angle of Mine Cavity (채굴적 경사에 따른 그라우트 주입량 결정에 관한 연구)

  • Lee, Byung-Yoon;Jeon, Seok-Won;Kim, Tae-Hyun;Cho, Jung-Woo;Kim, Kwan-Il;Kim, Tae-Hyok;Kim, Soo-Lo
    • Tunnel and Underground Space
    • /
    • v.19 no.2
    • /
    • pp.107-122
    • /
    • 2009
  • Insufficient reinforcement for maximizing payability and benefits in mining cavities causes subsidence problems and it threatens residents' lives and properties. So many reinforcement management methods are developed and now various methods are being applied in the field. Among them, a filling method which sends reinforcement materials in the cavities is used extensively. However, domestic geological condition and coal mining methods are so complicate that make many steep cavities. Because of those problems, it is difficult to apply foreign methods directly, which is valid for horizontal cavities. In this study, the injection volume of quick setting grouting material which is developed for filling cavities in domestic condition and the shape of consolidated bodies are investigated. And a programming method for estimating proper injection amounts of filling materials is proposed. The results are verified by numerical analysis using UDEC.

Development of Intelligent Excavating System;Introduction of research center (지능형 굴삭시스템 개발;연구단 소개)

  • Seo, Jong-Won;Park, Chang-Woo;Jang, Dal-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.197-204
    • /
    • 2007
  • Nowadays, the construction industry is suffering from the decrease of labor productivity caused by the lack of skilled workers and the aging labor forces. The hazardous work conditions and safety problems still exist at the construction sites. The earthwork operation is not the exception. The number of skilled earthwork equipment operators has been rapidly reduced and the equipment needs to be operated in dangerous / hazardous work sites. Thus, through the development of intelligent excavating system, Intelligent Excavating System(I.E.S) research team tries to enhance the safety of work environment, productivity, quality, and payability of the earthwork operation. It is also expected that this research contributes to the development of fundamental construction automation technologies and to the creation a new market sector.

  • PDF

Probabilistic Analysis using Economical Evaluation for Shale Gas Development (셰일가스 개발 시 확률론적 분석 기법을 이용한 경제성 평가)

  • Moon, Young-Jun;Moon, Seo-Yoon;Gil, Seong-Min;Shin, Hyo-Jin;Lim, Jong-Se
    • Journal of the Korean Institute of Gas
    • /
    • v.22 no.2
    • /
    • pp.21-28
    • /
    • 2018
  • In recent years, payability of shale gas production has worsened due to oil and gas price declines resulting from sharply increasing shale gas production. Reliable economic evaluation in shale gas development has become important. In this study, Monte Carlo simulation of probabilistic analysis technique was applied to analyze the economic feasibility considering the uncertainty involved in shale gas development. For this, the range of major variables is set and a random number is generated to derive the probability distribution of Net Present Value(NPV) and Internal Rate of Return(IRR). Consequently, we estimated the probability that the feasibility of the project is evaluated to be positive when developing shale gas in the study area. In addition, sensitivity analysis of major parameters affecting economic efficiency in shale gas development was carried out, and the effect of major variables in economic evaluation for commercial production was identified. In the future, this study could be used to make decision for shale gas production by presenting the range of variation of economic index and probability value.