• Title/Summary/Keyword: Performance test load

Search Result 1,980, Processing Time 0.029 seconds

Structural Performance Evaluation of System Scaffolding for Elevator Installation Work (엘리베이터 설치 작업용 시스템 비계의 구조 성능 평가)

  • Jong Moon Hwang;Gi Yeol Lee
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.3
    • /
    • pp.61-68
    • /
    • 2023
  • This study performed a structural performance evaluation of a system scaffolding for elevator installation work developed in previous studies. The structural performance was evaluated via a structural test conducted to apply the working load specified in the design standard. The deflection of the horizontal member and the stress of each member constituting the system scaffolding were measured. Consequently, the structural safety evaluation including structural behavior and required performance was performed using the deflection and stresses measured from the structural test. The structural test and safety evaluation results based on the heavy working load corresponding to the design load indicated that the deflection, which is the performance criterion of the horizontal member, did not exceed the allowable value. Further, each member's stress, which is a safety evaluation indicator, did not exceed the allowable strength for both horizontal and vertical members with bending behavior and fordable bracing with tensile behavior, while also satisfying the required safety factor. In addition, the results confirmed the safety against deformation, partial damage, and destruction owing to excessive and maximum load. Therefore, the system scaffolding developed in this study satisfies both the structural performance and safety required by the design standards; thus, it can be applied to elevator installation work sites.

Vibration Fatigue Analysis of Automotive Fuel Tank Using Transfer Function Method (Transfer Function Method를 이용한 자동차 연료탱크의 진동 피로 해석에 대한 연구)

  • Ahn, Sang Ho
    • Journal of Auto-vehicle Safety Association
    • /
    • v.12 no.3
    • /
    • pp.27-33
    • /
    • 2020
  • In this paper, the process of predicting efficient durability performance for vibration durability test of automobile parts using vibration test load on automobile fuel tank is presented. First of all, the common standard load that can be applied to the initial development process of the automobile was used for the fuel tank and the vulnerability of the fuel tank to the vibration fatigue load was identified through frequency response analysis. In addition, the vulnerability of the fuel tank was re-enacted through vibration durability test results, and the scale factor was applied to the standard load. In order to predict the vibration durability performance required for detailed design, vibration fatigue analysis was performed on the developed vehicle with the frequency of vibration severity equivalent to the durability test, and the vulnerability and life span of the fuel tank were identified through the process of applying weights to these selected standard loads, thereby reducing the test time of the development vehicle.

Fatigue characteristics of the IT girder for railroad (철도교용 IT거더의 피로특성)

  • Choi, Sang-hyun;Lee, Chang-soo
    • Journal of the Society of Disaster Information
    • /
    • v.6 no.2
    • /
    • pp.119-130
    • /
    • 2010
  • In designing a railroad bridge, the fatigue is one of the main factors to be considered for ensuring safe operation. Especially, for a new type of a structural member, which has not been adopted to railroad bridges, the fatigue performance should be checked. In this paper, the fatigue characteristics of an IT girder are examined. The IT girder is a new type of a prestressed concrete girder which has two prestressed H-beams in the top of the girder to give the girder additional sectional capacity. To obtain the fatigue performance, a 10m IT girder specimen is designed, and a repeated load test is performed by applying the load cyclically two million times. The magnitude of the repeated load is determined considering the stress level under the service condition. During the test, static load tests are performed to identify the stiffness degradation. The fatigue performance of the girder is checked according to the Japanese and the CEB-FIB design codes. The fatigue test result shows that the IT girder satisfies both design codes.

Experimental Evaluation of the Performance of Large-Capacity Mounts for Naval Shipboard Equipments (함정탑재장비용 대용량 마운트의 성능시험평가)

  • Moon, Seok-Jun;Kim, Heung-Sub;Park, Jin-Woo;Park, Jin-Ho;Oh, Kwang-Suk;Jeong, Jong-Ahn
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.52 no.3
    • /
    • pp.275-281
    • /
    • 2015
  • Mounts for shipboard equipment in naval ships play an important role for vibration and shock suppression. New large-capacity resilient mounts, SDR-D30 and SDR-D45, have been developed. This paper involves performance tests for the mount which have maximum load of 30 kN and 45 kN, respectively. The performance tests have been carried out for several mounts based on military standards, such as MIL-M-19863D(SH), MIL-M-21693C(SH), MIL-M-17508F(SH), and MIL-S-901D(NAVY). The test items consist of deflection at upper rate load test, dynamic stiffness, uniformity, static load-deflection(axial, transverse and longitudinal), drift test, fatigue test, and shock test. From these performance tests, it is confirmed that the two mounts have good performances based on military standards.

Parameters Estimation Characteristics of Five-Phase Squirrel-Cage Induction Motor within Over Current Load (과전류 부하에서 5상 농형 유도전동기의 정수 특성)

  • Kim, Min-Huei
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.7
    • /
    • pp.38-46
    • /
    • 2015
  • This paper propose a variable parameter estimations for variable over current load of five-phase squirrel-cage induction motor(IM) to servo control system. In order to high performance control of AC motor using a field oriented control(FOC) and direct torque control(DTC) algorithm, there are required precise motor parameters for slip calculation, flux observer, controller gain, torque command of current components, rotor position, speed estimation, and so on. We are suggest a analyzed estimation results of the motor parameters that developing five-phase squirrel-cage IM have a stator of concentrated winding for experimental within variable over current load at rated input frequency. There are results of stator winding measurement, no-load test, locked-rotor test, variable over current load test, and estimated parameters of equivalent circuits using manufactured experimental apparatus by IEEE Standard Test Procedure for Polyphase Induction Motors and Generators 112-2004.

Durability Evaluation of Hybrid Expansion Joint System with Improved Replacement (보수성을 개선한 복합형 신축이음장치(HRS) 내구성 평가)

  • Jung Woo Lee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.2
    • /
    • pp.1-7
    • /
    • 2023
  • Durability was evaluated by performing a full-scale vertical load fatigue test and a wheel load performance test on the HRS, which reduces the replacement time of the existing expansion joint and improves serviceability to allow partial replacement by lane. As a result of the vertical load fatigue test, the maximum stress of the rail-type expansion joint is 170 MPa, which is about 47.8% of the yield strength of the HRS expansion joint rail 355 MPa. The vertical load fatigue test of the HRS expansion joint with improved serviceability set the size and load of the load plate according to the road bridge design standards, did not show any fracture behavior in the vertical load fatigue test and the wheel load performance test 2 million times, and its durability and safety were verified.

Performance Tests and Development of the Cyclic Load Device Using a Bellows (벨로우즈를 이용한 반복 하중부과장치의 개발 및 성능시험)

  • Choi, Myoung-Hwan;Cho, Man-Soon;Park, Sung-Jae;Kim, Bong-Goo
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.31 no.9
    • /
    • pp.903-909
    • /
    • 2007
  • A fatigue capsule is one of the special capsules to investigate the fatigue characteristics of the nuclear materials during an irradiation test in a research reactor, HANARO. In this study, the performance test and the preliminary fatigue test results by using a cyclic load device newly developed for a fatigue capsule are described. In order to obtain the characteristics such as a realization and a controllability of the periodic wave shape and the relationship between the pressure and the load, a spring and rigid bar specimens are used. The fatigue test for the 316L stainless steel specimen with 1.8mm in diameter and 12.5mm in gage length is also performed under the same conditions as the temperature($550^{\circ}C$) of the specimen during irradiation tests. As a result of the test, the fracture of the specimen occurs at a total of 70,120 cycles(about 12 days), and the displacement in this case is 2.02 mm. It is expected that these results will be used for determining test conditions and a comparison of the in-pile fatigue test results.

Load Simulator with Power-Recovery Capability Based on Voltage Source Converter-Inverter Set (전력회수 능력을 갖는 전압원 컨버터-인버터 세트로 구성된 부하모의장치)

  • Bae B.Y.;Han B.M.
    • Proceedings of the KIPE Conference
    • /
    • 2004.11a
    • /
    • pp.76-80
    • /
    • 2004
  • This paper describes a load simulator with power-recovery capability, which is based on the voltage source converter-inverter set. The load simulator described in this paper can save the electric energy that should be consumed to test the operation and performance of the distributed generation system and the power quality compensator. The load simulator consists of a converter-inverter set with a DSP controller for system control and PWM pulse generation. The converter operates as a universal load to model the linear load and the non-linear load, while the inverter feed the energy back to the power source with harmonic compensation. The load simulator can be widely used in the lab to test the performance of the distributed generation system and the power quality compensator.

  • PDF

Load Simulator with Power-Recovery Capability Based on Voltage Source Converter-Inverter Set (전력회수 능력을 갖는 전압원 컨버터-인버터 세트로 구성 된 부하모의 장치)

  • Bae Byung-Yeol;Han Byung-Moon
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.54 no.4
    • /
    • pp.181-187
    • /
    • 2005
  • This paper describes a load simulator with power-recovery capability, which is based on the voltage source converter-inverter set. The load simulator described in this paper can save the electric energy that should be consumed to test the operation and performance of the distributed generation system and the power quality compensator. The load simulator consists of a converter-inverter set with a DSP controller for system control and PWM pulse generation. The converter operates as a universal load to model the linear load and the non-linear load, while the inverter feed the energy back to the power source with harmonic compensation. The load simulator can be widely used in the lab to test the performance of the distributed generation system and the power quality compensator.

After-fracture behaviour of steel-concrete composite twin I-girder bridges: An experimental study

  • Lin, Weiwei
    • Steel and Composite Structures
    • /
    • v.42 no.1
    • /
    • pp.139-149
    • /
    • 2022
  • To simplify the design and reduce the construction cost of traditional multi-girder structural systems, twin I-girder structures are widely used in many countries in recent years. Due to the concern on post-fracture redundancy, however, twin girder bridges are currently classified as fracture critical structures in AASHTO specifications for highway bridges. To investigate the after-fracture behavior of such structures, a composite steel and concrete twin girder specimen was built and an artificial fracture through the web and the bottom flange was created on one main girder. The static loading test was performed to investigate its mechanical performance after a severe fracture occurred on the main girder. Applied load and vertical displacement curves, and the applied load versus strain relationships at key sections were measured. To investigate the load distribution and transfer capacities between two steel girders, the normal strain development on crossbeams was also measured during the loading test. In addition, both shear and normal strains of studs were also measured in the loading test to explore the behavior of shear connectors in such bridges. The functions and structural performance of structural members and possible load transfer paths after main girder fractures in such bridges were also discussed. The test results indicate in this study that a typical twin I-girder can resist a general fracture on one of its two main girders. The presented results can provide references for post-fracture performance and optimization for the design of twin I-girder bridges and similar structures.