• Title/Summary/Keyword: Project Down Flow

Search Result 17, Processing Time 0.023 seconds

A study on the development of a web-based cost management system of building interior projects (웹을 기반으로 한 실내건축공사의 원가관리 시스템 개발에 관한 연구)

  • 송영규
    • Korean Institute of Interior Design Journal
    • /
    • v.13 no.3
    • /
    • pp.197-204
    • /
    • 2004
  • This study aims at the development of a cost management system in building interior projects. Renovation and remodeling is activated and expanded much more being compared with new building construction at present. After Interior project proceeding must get out of simple estimate and assumption, then its be needed a formal work process and computerized cost management. Proceeding a building interior project management was proceed in the office and the field. Cost break down, especially, depend on the field manger and used fiend managing money because its not checked by cost manager in office manger. For this study, cost factors are defined in terms of cost break-down interior works which consist of materials and labors. A data model for cost factors was developed, and a relational database is used to realize cost data management based upon this data model. Data input and output are achieved by internet from both of wired PC and mobile phone. This system can timely display a number of needed reports for cost management that identifies cash flow and predicts budget for cost break-down works in interior projects.

A study on how to find new project of Six Sigma (식스 시그마 프로젝트 개발에 관한 연구)

  • Lim, Sung-Uk;Yoon, Seong-Pil;Kim, Chang-Soo
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.5
    • /
    • pp.27-56
    • /
    • 2006
  • Prior to Six Sigma, many companies had adopted a policy management method designed to manage business performances through the top-down deployment of management policies. This policy management method and the Six Sigma CTQ Flow Down will make a good combination when their merits are developed and systemized as the management innovation program which enables to set up innovation targets along with management targets in the stage of strategic planning and to participate all the personnel from top management down in achieving th targets. This paper will help the companies implementing Six Sigma improve their management constitutions and achieve better management performances through the integration of policy management and Six Sigma.

Big Y development for line Yield Improvement in a Factor (Big Y 전개를 통한 장치 Line의 Yield 향상)

  • Moon Gi-Ju;Park Woo-Jong
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.4
    • /
    • pp.184-195
    • /
    • 2004
  • Current companies 집중 on how to operate and select projects to achieve the best result. 6sigma projects are chosen in the best suitable concept, which are solved by the 6Sigma experts according to the priority. And every project has to be launched not the view of individual management factors but the total factors, Big Y. Therefore, a process needs to be treated to connect the vital few factors in various processes to improve the yield, which is the main performance criteria in a manufacturing industry This report is to make the total optimization through the Vital-Few mapping between quality characteristics and process factors in a manufacturing line. Accordingly, it means to secure lower variance by making the CTP(Critical To Process) optimization and finally to improve the yield.

System Dynamics Approach to Progress Payment Regulations

  • JeongHoon Lee;Moonseo Park;Hyun-Soo Lee;Sungjoo Hwang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.181-187
    • /
    • 2013
  • The construction market condition is getting worse because of global constructions slow down, low profit, market contraction and so on. For these reason, most construction companies depend on public construction projects which possible to protect construction fee, known as progress payment, by laws. Despite this law, problems of progress payment are constantly occurring and it has been main factors that hinder the construction cost's cash-flow in construction project. To solve this problem, many researchers suggested various solutions but most of solutions were focused on specific target as owner, general contractor, and subcontractor. So, most of solutions were insufficient consider about interaction between contractors. Because of these reasons, it was hard to reflected policy. This research aimed to use system dynamics to develop the model for the application and payment based on the regulations and papers. Also, performed a developed model's verification based on progress payment regulation's basic objectives.

  • PDF

A Study on Model Test for Spilway of Fill Dam (Fill Dam의 방수로모형실험에 관한 고찰)

  • 강병익
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.12 no.4
    • /
    • pp.2090-2123
    • /
    • 1970
  • This paper is a report on the research of experimental model test of Andong Fill Dam, which has been planned by the Government of Korea as a project, of its over-flowing capacity in spillway, creation of minus pressure and structure of anti-water impulse in over-flow weir. Andong Fill Dam is one of the project of master development plant for water resources, locating at Nakdong River side of Korea, and is aimed to have a multi-purpose dam for flood-control, irrigation, water power, urban and industrial water supply. This dam is planned to erect in fill-dam type due to the improper soil foundation and condition for concrete dam. The refore for the proper and advantageous points, this is designed as center core fill dam. By a model minimized of Andong Fill Dam, held an experimental model test on water quentity of reservir, discharges of overflow part, low pressure and anti-water impulse of overflow part, which was conducted an experiment by flowing aspects through each section of spillway to find the changes of water pressure and that of water level, and corrected the section of each part in order to conduct a check on the creation of minus pressure not to be over acted to the allowable bundary of the section structure; and for the prevention of concentated scouring at the down stream side of flow.

  • PDF

SHIHMEN SEDIMENT PREVENTION DIVERSION TUNNEL PLANNING AND DESIGN

  • Ho-Shong Hou;Ming-Shun Lee;Percy Hou
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.168-172
    • /
    • 2009
  • Shihmen reservoir was started in May 1963. The main purposes of Shihmen reservoir are for agriculture, power supply, flood control and tourism. Shihme Asn dam is an earth dam. Its crown height is 133m above mean sea level, with length 360 m, watershed 763.4 km2, and maximum volume 309 million cms. Turbidity in Shihmen dam was severely affected by typhoons Aere (2004) and Masa (2005). Increased deposition after Aere was 28 million cms. Turbidity at Shihmen Canal Inlet is 3000 NTU (Nephelometry Turbidity Unit). Sediment sluicing strategies for downstream channel are demanded. Therefore, diversionary sediment preventing channel is planned in the upstream of Shihmen reservoir. Finally, turbid flow in tunnel channel is bypassed and diverted its flow down to downstream.

  • PDF

An Economic Analysis with the Productive Rate of Return (생산투자수익률을 적용한 생산투자사업의 경제성 분석)

  • Kim, Jin Wook;Son, Immo;Shin, Jaiwook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.1
    • /
    • pp.50-56
    • /
    • 2017
  • The IRR (internal rate of return) is often used by investors for the evaluation of engineering projects. Unfortunately, it is widely known that it has serial flaws. Also, External rate of returns (ERRs) such as ARR (Average Rate of Return) or MIRR (MIRR, Modified Internal Rate of Return) do not differentiate between the real investment and the expenditure. The PRR (Productive rate of return) is faithful to the conception of the return on investment. The PRR uses the effective investment instead of the initial investment. In this paper, we examined two cases of the engineering project. the one is a traditional engineering project with financing activity, another is the project with R&D. Although the IRR has only one value, it overestimates or underestimate profitabilities of Engineering Projects. The ARR and the MARR assume that a returned cash reinvest other projects or assets instead of the project currently executing. Thus they are only one value of a project's profitability, unlike the IRR. But the ARR does not classify into the effective investment and non-investment expenditure. It only accepts an initial expenditure as for an investment. The MIRR also fails to classify into the investment and the expenditure. It has an error of making a loss down as the investment. The IRR works as efficiently as a NPW (Net Present Worth). It clearly expresses a rate of return in respect of an investment in an engineering project with a loan. And it shows its ability in an engineering project with a R&D investment.

Development of Hard-wired Instrumentation and Control for the Neutral Beam Test Facility at KAERI

  • Jung Ki-Sok;Yoon Byung-Joo;Yoon Jae-Sung;Seo Min-Seok
    • Journal of Electrical Engineering and Technology
    • /
    • v.1 no.3
    • /
    • pp.359-365
    • /
    • 2006
  • Since the start of the KSTAR (Korea Superconducting Tokamak Advanced Research) project, Instrumentation and Control (I&C) of the Neutral Beam Test Facility (NB-TF) has been striving to answer diverse requests arising from various facets during the project's development and construction phases. Hard-wired electrical circuits have been designed, tested, fabricated, and finally installed to the relevant parts of the system. In relation to the vacuum system I&C, controlling functions for the rotary pumps, a Roots pump, two turbomolecular pumps, and four cryosorption pumps have been constructed. I&C for the ion source operation are the temperature and flow rate signal monitoring, Langmuir probe signal measurements, gradient grid current measurements, and arc detector circuit. For the huge power system to be monitored or safely operated, many temperature measurement functions have also been implemented for the beam line components like the neutralizer, bending magnet, ion dump, and calorimeter. Nearly all of the control and probe signals between the NB test stand and the control room were made to be transmitted through the optical cables. Failures of coolant flow or beam line vacuum pressure were made to be safely blocked from influencing the system by an appropriate interlock circuit that will shut down the extraction voltage application to the system or prevent damages to the vacuum components. Preliminary estimation of the beam power through the calorimetric measurement shows that 87.9% of the total power of the 60kV/18A beam with 200 seconds duration is absorbed by the calorimeter surface. Most of these I&C results would be highly appropriate for the construction of the main NBI facility for the KSTAR national fusion research project.

Performance improvement of BOP Components for 1kW Stationary Fuel Cell Systems to Promote Green-Home Dissemination Project (그린홈 보급확대를 위한 건물용 연료전지 보조기기의 성능 향상)

  • Lee, Sunho;Kim, Dongha;Kim, Minseok;Jun, Heekwon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.89.1-89.1
    • /
    • 2011
  • According to green growth's policy, green-home dissemination's projects are promoting. Among them, stationary fuel cell systems are receiving attention due to high efficiency and clear energy. But it need absolutely to develop cost down technologies and improve system durability for commercialization of the fuel cell system. To achieve this objectives, in 2009, the Korean Government and "Korea Institute of Energy Technology Evaluation and Planning(KETEP)" launched into the strategic development project of BOP technology for practical applications and commercializations of stationary fuel cell systems, named "Technology Development on Cost Reduction of BOP Components for 1kW Stationary Fuel Cell Systems to Promote Green-Home Dissemination Project". This paper introduces a summary of improved BOP performances that has been achieved through the 2nd year development precesses(2010.06~2011.05) base on 1st year development precesses(2009.06~2010.05). The major elements for fuel cell systems are cathode air blowers, burner air blowers, preferential oxidation air blowers, fuel blowers, cooling water pumps, reformer water pumps, heat recovery pumps, mass flow meters, electrical valves, safety valves and a low-voltage inverter. Key targets of those elements are the reduction of cost, power consumption and noise. Invert's key targets are development the low -voltage technologies in order to reduce the number of unit cell in fuel cell system's stack.

  • PDF

The Role of Corporate Social Responsibility for Sustainable Growth: An Exploratory Case Study on Auto Corporations (지속성장을 위한 사회적 책임(CSR)의 전략적 활용: 중국 내 자동차 기업에 대한 탐색적 사례연구)

  • Baek, Seoin;Kwon, Sang-Jib
    • Knowledge Management Research
    • /
    • v.16 no.3
    • /
    • pp.103-128
    • /
    • 2015
  • This study sheds light on the role of corporate social responsibility in firms' growth by investigating how and what corporate social activities may flow down china auto industry market. This study results based on in-depth case studies from 5 international auto corporations suggest that positive diverse corporate social responsibility amplified that the influence of commitment to the customer on firm's brand loyalty and sustainable growth. The most important thing is that strategic corporate social responsibility activities including new venture creation support and national project program will have a positive influence on the firm's growth and brand reputation. We build on advanced solutions to examine the unique and joint activities of auto corporations based on china auto industry market and important factors affecting sustainable growth in auto corporations. Contributions and implication of this study for current and future corporate social responsibility research are discussed.