• Title/Summary/Keyword: Project Network Diagram

Search Result 10, Processing Time 0.033 seconds

Relationship Analysis of Field Work in Beam-Column System Frame Work of the Precast Concrete Public Apartment Building (보-기둥구조 PC공동주택 골조공사 작업관계 분석)

  • Kim, Ki-Ho;Kim, Jin-Won;Kim, MIn-Jun;Lee, Dong-Gun;Sohn, Jeong-Rak;Lee, Bum-Sik
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.41-42
    • /
    • 2022
  • This study analyzed the process related to the linkage between on-site work targeting the middle size Precast Concrete(PC) public apartment building with beam-column system and prepared on-site works flow relationship diagram in which the wet process consists of core Critical Path(CP) to prepare a network diagram of the Precedence Diagram Method(PDM). Through this study, it is expected that it will be possible to maximize the project management capability by suggesting a method to minimize risk factors and the optimized process management of the beam-column system PC public apartment building.

  • PDF

A Study on the Application of Scheduling & Planning for Nuclear R &D Projects : Cas of LMR Project (원자력연구개발사업의 공정관리 적용 사례 연구)

  • 한도희
    • Journal of Korea Technology Innovation Society
    • /
    • v.2 no.3
    • /
    • pp.118-128
    • /
    • 1999
  • This study attempts to provide an efficient method for managing the Nuclear R&D projects. It should be noted that the technology and experiences to develop a well-balanced plan and mon-itoring for the R&D project are not yet well established when compared with the commercial con-structionand engineering projects. This study recommends that the R&D project manager utilize the scheduling techniques to establish an integral management system taking in to account the un-certainties in the research environment. Based upon the results of a case study for the Liquid Metal Reactor Design Technology Development Project which is led by the KAERI this study also con-firms that it is possible to run the national nuclear R&D projects with the Scheduling & Planning.

  • PDF

Case study of risk analysis using VERT (VERT를 이용한 위험 분석 사례연구)

  • 안병찬;이정구
    • Korean Management Science Review
    • /
    • v.12 no.3
    • /
    • pp.77-95
    • /
    • 1995
  • This paper shows the case study of risk analysis in an weapon system research and development project. For risk analysis, an advanced stochastic networking technique-VERT (Venture Evaluation and Review Technique) is used. Assumptions for activities of network diagram and conversion methods from PERT ( Program Evaluation and Review Technique) to VERT are discussed. Also, simulation result is presented and discussed.

  • PDF

A Critical Path Search and The Project Activities Scheduling (임계경로 탐색과 프로젝트 활동 일정 수립)

  • Lee, Sang-Un
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.12 no.1
    • /
    • pp.141-150
    • /
    • 2012
  • This paper suggests a critical path search algorithm that can easily draw PERT/GANTT chart which manages and plans a project schedule. In order to evaluate a critical path that determines the project schedule, Critical Path Method (CPM) is generally utilized. However, CPM undergoes 5 stages to calculate the critical path for a network diagram that is previously designed according to correlative relationship and execution period of project execution activities. And it may not correctly evaluate $T_E$ (The Earliest Time), since it does not suggest the way how to determine the sequence of the nodes activities that calculate the $T_E$. Also, the sequence of the network diagram activities obtained from CPM cannot be visually represented, and hence Lucko suggested an algorithm which undergoes 9 stages. On the other hand, the suggested algorithm, first of all, decides the sequence in advance, by reallocating the nodes into levels after Breadth-First Search of the network diagram that is previously designed. Next, it randomly chooses nodes of each level and immediately determines the critical path only after calculation of $T_E$. Finally, it enables the representation of the execution sequence of the project activity to be seen precisely visual by means of a small movement of $T_E$ of the nodes that are not belonging to the critical path, on basis of the $T_E$ of the nodes which belong to the critical path. The suggested algorithm has been proved its applicability to 10 real project data. It is able to get the critical path from all the projects, and precisely and visually represented the execution sequence of the activities. Also, this has advantages of, firstly, reducing 5 stages of CPM into 1, simplifying Lucko's 9 stages into 2 stages that are used to clearly express the execution sequence of the activities, and directly converting the representation into PERT/GANTT chart.

A building strategy of effective metropolitan circular railways (수도권 광역 순환전철 구축 전략)

  • Han, Woo-Jin;Park, Jeong-Soo
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.620-625
    • /
    • 2007
  • According to 'Metropolitan Traffic Network Plan' announced in 2001, radial railways which connect Seoul with satellite cities around Seoul appear gradually. And followed by this, social demand for circular metropolitan railways that can connect the radial railways horizontally is increasing. But existing plans about circular metropolitan railways has limits to propose only passing cities of the railways. If there is no detailed guideline for circular metropolitan railways, the each railway for circular line will be constructed individually and then it will be not effective circular railways totally. Additionally that railway project will be easily interrupted by popular complaints. Therefore "The basic plan for circular metropolitan railways" is needful to guide a right direction for circular metropolitan railways. In this paper, rough track diagram of 'node' station for circular metropolitan railways is proposed. It is essential part of the basic plan. If the track diagram of a node is publicized in advance and individually lines of circular metropolitan railways is enforced to followed it, all lines will has rich circular functionality. Finally, effective circular metropolitan railways can be built.

  • PDF

Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities (작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법)

  • Yi Kyoo Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.75-80
    • /
    • 2000
  • In scheduling multi-unit projects, several alternatives can exist in network construction due to repetitiveness of their activities. Project duration is affected not only by the duration of each activity but also by the arrangement of repeating activities in such projects. This paper provides a network compression method that assigns predecessors to each activity to minimize its float time. Different to the previous efforts that utilized line of balance as the base scheduling-model, this research adopts precedence diagram arranged in two coordinates, the space axis and the resource one. This method seeks the most appropriate predecessors for each activity in each direction of the two coordinates for the purpose of minimizing the idle resource and space. This activity arrangement method was applied to a multi-unit apartment-construction project, to prove its capability of network compression. The result shows that the method successfully sought room for saving construction duration by changing the activity arrangement. The network compression method presented in this research can be utilized in multi-unit construction projects such as apartment complex projects.

  • PDF

An Extraction and ANP Importance Analysis for Competence Factors of Junior Grade CM Engineer (초급 건설사업관리기술자(CMr)의 요구역량 추출 및 ANP 중요도 분석)

  • Yang, Jinkook;Kim, Sebeom;Lee, Sangbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.58-64
    • /
    • 2017
  • Construction Management (CM) is being utilized as an efficient project management system. Construction management system provide scientific management techniques as well as the expert's service with the expertise. Accordingly, CM services demand is continuously increasing in construction project. Construction Management engineer grade is distinguished by the Index of Construction Engineer's Competency (ICEC). Construction management engineer requires a higher score than the other fields. However, junior grade CM engineer can get grade according to the education and qualification. This study was conducted junior grade CM engineer depth interview after analyzing the problem of the current CM engineer grade system. As a result, this study was to extracted the 23 kind competence factors. And, competence factors were five area grouped using affinity diagram method. Next, we analyzed the importance utilizing the Analytic Network Process (ANP) technique. As a result, high priority areas were analyzed to be quality and cost areas associated with project management.

Inland Logistics Forwarding System based on Supply Chain Management : ILOF (공급사슬기반의 육상물류중개시스템 개발에 관한 연구)

  • 박남규;최형림;김현수;박영재;손형수
    • Journal of Information Technology Application
    • /
    • v.3 no.2
    • /
    • pp.67-82
    • /
    • 2001
  • The ILOF project addresses the needs of logistics industrial organizations to reduce information processing time, improve added and residual value of information and reduce processing and transportation costs. It deals with the information supply chain information systems shared by vertical partner as important entity, whose performance and optimization very significantly affects the efficiency and performance of logistics industries. This paper deals with logistics information exchange systems based on supply chain management, focusing on sharing database and processes between partners such as shipper, logistics broker, transportation company, shipping company etc., for smoothing the information flow, enhancing consumer service and reducing communication fee and labour costs. The significance of contribution of this research is the provision of a model for logistics information exchange including entity relationship diagram, data flow diagram and functions which is able to facilitate the formulation of a customer driven supply chain information network, there by enhancing the competitive edge of companies in logistics industries on local and global basis.

  • PDF

4D BIM based Workspace Planning Process in Building Construction Project (4D BIM 기반의 건설프로젝트 작업공간 계획 프로세스)

  • Choi, Byungjoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Hyunsoo;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.175-187
    • /
    • 2013
  • Each participant in building construction project requires their own workspace to execute their activities. In this environment, inappropriate workspace planning in construction site causes workspace conflicts which result in a loss of productivity, safety hazard and poor-quality issues. Therefore, workspace should be regarded as one of the most important resources and constraints have to be managed at construction site. However, current construction planning techniques such as Gantt chart, network diagram and critical path method have proven to be insufficient to workspace planning. This paper contains formalized process for workspace planning in 4D BIM environment to prevent workspace related problems in construction project. The proposed process in this paper represents workspace occupation status for each activity and suitable solutions for identified workspace conflicts by integrating workspace attributes and activity execution plan. Based on the result of this study, project manager will be able to prevent probable workspace conflicts and negative effect on project performance by devising appropriate workspace plan during preconstruction phase.

Design Strategies for Ecological Restoration Using System Dynamics - Focused on 2015 Miryang-si Jayeon Madang Development Project - (시스템 다이내믹스를 활용한 생태복원 설계 전략 - 2015 밀양시 자연마당 조성사업을 사례로 -)

  • Ham, Eun-Kyung;Song, Ki-Hwan;Chon, Jinhyung;Cho, Dong-Gil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.43 no.6
    • /
    • pp.86-97
    • /
    • 2015
  • "The Jayeon Madang Development Project("JMDP")" is a project being promoted by the Ministry of Environment to create a cultural space and a natural rest area within the city. Abuksan, located at Abuksan in Gyeongsangnam-do Miryang-si Naeil-dong, has suffered a substantial amount of environmental degradation over time, so the need for ecological restoration made it a natural choice for the location of the JMDP's site. The purpose of this study is to examine ecological restoration design strategies used in Abuksan as part of the JMDP using system dynamics. The national archery center, hole, and arable land sites are key restoration areas in Abuksan that have faced with ecological problems. In this study, we identified the status of each site, determined key strategies being implemented, and designed based on the strategies implemented up to this point for solving problems associated with each sites through the use of causal loop diagrams. The results of the causal loop diagram analysis are as follows. The national archery center site was designed around strategies including planting green manure crops and introducing hugelkultur to reduce soil acidification and green network degradation. The hole site was designed as a constructed wetland based on the emergence of hygropreference vegetation, hydrated by rainwater collected at the bottom of hole, ecological and cultural benefits of such an environment. The arable land site restoration design was built around planting native vegetation on one part of the arable land site after soil quality improved and around restoration of grassland and a dry wetland on the other part of the site to reduce soil acidification, erosion, and green network degradation. This study is a significant attempt to apply principles of system dynamics to ecological restoration by providing the design strategies using comprehension of some problems in the ecosystem feedback loops, which has not been used before in general design processes for ecological restoration.