• Title/Summary/Keyword: Quality Control Plan

Search Result 359, Processing Time 0.031 seconds

A Study on Establishment and Control of the Quality Control Policy (품질관리 방침의 설정과 관리에 관한 소고)

  • 이상억
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.8 no.11
    • /
    • pp.35-43
    • /
    • 1985
  • In this paper we will concentrate on the Quality Control Policy which should be enforced as a part of the Total Quality Control considers the global concepts, the establishment Procedures, and the evolution and operation of Quality control policy to achieve effectively it. For enforcement of the Qualify control policy shall be focused for considerations : (1) suggestion of the optimum control policy (2) suggestion of a comprehensive plan and promoting method quality control (3) suggestion of matters that need special consideration at the time of decision of a comprehensive management of control policy thereof. (4) A comprehensive Proposal (5) suggestion of a plan for progress of the Quality control system and the supplementary plan In the future, accordingly, establishment d its own policy control level is desirably more reasonable, and the Total Quality Control System that employes the control efficiency of periodical and systematic and rationalization and radical reform of the enterprise management problem as the restrictive conditions must be applied for quality control system.

  • PDF

Improvement Plan of Quality Control for 3D Geospatial Database (3차원 국토공간정보 품질관리 개선방안에 관한 연구)

  • Seo, Chang-Wan;Choi, Yun-Soo;Kim, Jae-Myeong;Kim, Young-Hak;Kim, Young-Gil
    • Spatial Information Research
    • /
    • v.17 no.2
    • /
    • pp.231-241
    • /
    • 2009
  • Recently, The importance of a quality control for implementing 3D geospatial database has being emphasized to build a 21st century knowledge society and an ubiquitous land. The improvement of 3D geospatial database quality control through establishing an integrated quality control makes data suppliers update data efficiently and users get high quality data. The purpose of this study was to derive the improvement plan of 3D geospatial database quality control through the analyses of the existing 3D geospatial database quality control and case studies. The results of this study are as follows. Firstly, we defined the concept of 3D geospatial database quality control. Secondly, we set the boundary, factors and process of 3D geospatial database quality control through classifying it in detail. Lastly, we drew improvement contents such as the quality control checklist by implementation process according to the improvement plan of 3D geospatial database implementation.

  • PDF

A Study on the Improvement of Efficiency for Quality Assurance Based on Quality-Bill of Material (Q-BOM(Quality-BOM) 기반의 품질보증 효율화 방안 연구)

  • Lee, Chang Hee;Yang, Kyung Woo;Park, Doo Il;Kim, S.
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.3
    • /
    • pp.457-463
    • /
    • 2013
  • Purpose: For effective quality assurance activities, BOM-based quality assurance method is presented. This study introduces various BOM conversions such as Q-BOM, T-BOM, and S-BOM based on M-BOM structure. Methods: Product quality control via Q-BOM manages inspection/audit information, overall supply-chain of product, part requirements, and inventory status. T-BOM manages part traceability, and S-BOM enables statistical control over key process and parts at various hierarchy levels. Results: Quality plan template was developed based on the study results of BOM system including Q-BOM, T-BOM, and S-BOM. Conclusion: Through BOM(Q-BOM, T-BOM, and S-BOM) study and development of quality plan template, more systematic and comprehensive quality management plan is achieved.

QUALITY MANAGEMENT OF ECOLOGICAL ENGINEERING

  • Ying-Mei Cheng;Been-Jyh Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1216-1222
    • /
    • 2009
  • Ecological Engineering (EE) refers to all sustainable engineering that can reduce damage to ecosystems and that adopts ecology as a base and safety as an orientation in order to implement conservation of biodiversity and sustainable development. In short, EE attempts to safeguard the ecological environment while any essential construction projects proceed. EE encompasses many fields, including construction skills, ecosystem preservation, landscape, and even related cultures and so on. Such variety results in greater complexity of construction, and, consequently, indirectly increases the difficulty of construction quality control. The objective of our research is to explore a promising model for EE via an extensive literature survey. This model includes three principal stages: plan-design, construction, and maintenance, along with individual accompanying phases concerned with quality control and vital management. In this article, a river restoration example is adopted to describe in detail the critical points of quality control in the three stages (plan-design, construction, and maintenance) of the construction life cycle. This study proposes an integrated structure for quality management of EE to guarantee its quality and to enhance its core applications in order to achieve long-lasting preservation of the environment.

  • PDF

An advanced nation's case study considering integrated control for construction work quality.safety.environment (건설공사 품질.안전.환경 통합관리를 고려한 해외 사례 고찰)

  • Kim, Dong-Hee;Kim, Woon-Soo;Jeong, Han-Gyo;Noh, Joung-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.819-823
    • /
    • 2008
  • Currently, the quality management, safety management and environment management of domestic construction work does not form a infrastructure for integrated control which have been developed according to the unique characteristics based on respective the law. In other words, the quality manager and safety manager of human resources is set to a legal arrangement personnel, but environment manager of human resources is not. In addition, quality management standard is to perform the work to PDCA(Plan-Do-Check-Action) system which is reflected in all of the requirements of KS A ISO 9001 standard, but safety management plan and hazard harmfulness prevention plan are not properly reflected P(Plan), C(Check) and A(Action) system and focusing on only 4 section Do(D) in KOSHA 18001 standard requirement. Moreover environmental management plan is not even established requirement. Through examining the operation practices of an advanced nation prior to building the integrated control standard for construction work qualify safety.environment, the possibility of applying domestic is reviewed, and then this study is going to research the operation practices of Singapore.

  • PDF

The Establishment of Roles and Titles of Quality Control Personnel for Construction Project Quality Assurance (건설공사 품질확보를 위한 품질관리 관련자의 역할 및 호칭 정립)

  • Lee, Chang-Hyo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.871-878
    • /
    • 2017
  • The quality control personnel of the construction work shall establish and execute the quality control plan or the quality test plan and check the qualification of the used materials according to the process, the management of the test and inspection equipment, the quality education, the own quality inspection and measures. Management and quality test of Korea and plays an important role in preventing accidents. However, related organizations did not explicitly disclose their roles in quality testing and quality control tasks while changing the names of quality control personnel to test personnel and quality managers when revising related laws and regulations and the application of labor costs. Therefore, a research of this is needed to improve conflicting situation. In this study, the ambiguous title relation to the quality control persons is improved to meet the requirements of the construction work based on related laws and regulations, and each role and title is classified as 'quality tester' and 'quality manager'. In other words, the person who carries out the quality test of the "Construction Quality Test Standard" specified in the Guideline for Quality Management of Construction Projects shall be the "Quality Tester" and the person who performs the quality control plan establishment and execution work specified in the Enforcement Rule of the Construction Technology Promotion Act shall be referred to as the 'Quality Manager'.

Methodology of Application to Air Quality Model to Evaluate the Results of the Enforcement Plan in Seoul Metropolitan Area (수도권 지역의 대기환경관리 시행계획 추진결과 평가를 위한 대기질 모델링 적용 방법)

  • Yoo, Chul;Lee, Dae-Gyun;Lee, Yong-Mi;Lee, Mi-Hyang;Hong, Ji-Hyung;Lee, Seok-Jo
    • Journal of Environmental Science International
    • /
    • v.20 no.12
    • /
    • pp.1647-1661
    • /
    • 2011
  • The Government had devised legislation of Special Act and drew up guidelines for improving air quality in Seoul Metropolitan area. In 2007 local government of Seoul, Incheon and Gyeonggi conducted the results of application policy by reduced air pollutants emission for the first time. Although there was reduction of air pollutant emission in each local government, it was ineffective as expected using air pollution monitoring database. Therefore we worked out a way to prepare modeling input data using the results of enforcement plan. And we simulated surface $NO_2$ and PM10 before and after decrease in air pollutants emission and examine reduction effects of air pollution according to enforcement regulation except other influence, by using MM5-SMOKE-CMAQ system. Each local government calculated the amount of emission reduction under application policy, and we developed to prepare input data so as to apply to SMOKE system using emission reduction of enforcement plan. Distribution factor of emission reduction were classified into detailed source and fuel codes using code mapping method in order to allocate the decreased emission. The code mapping method also included a way to allocate spatial distribution by CAPSS distribution. According to predicted result using the reduction of NOx emission, $NO_2$ concentration was decreased from 19.1 ppb to 18.0 ppb in Seoul. In Gyeonggi and Incheon $NO^2$ concentrations were down to 0.65 ppb and 0.68 ppb after application of enforcement plan. PM10 concentration was reduced from 18.2 ${\mu}g/m^3$ to 17.5 ${\mu}g/m^3$ in Seoul. In Gyeonggi PM10 concentration was down to 0.51 ${\mu}g/m^3$ and in Incheon PM10 concentration was decreased about 0.47 ${\mu}g/m^3$ which was the lower concentration than any other cities.

A NUETROSOPHIC SINGLE ACCEPTANCE SAMPLING PLAN WITH QUALITY PARAMETERS

  • S. JAYALAKSHMI;M. GOPINATH
    • Journal of applied mathematics & informatics
    • /
    • v.42 no.1
    • /
    • pp.179-187
    • /
    • 2024
  • In the Quality Control and inspection processes, the use of attribute sampling strategies is crucial. In this study, we incorporate the neutrosophic fuzzy acceptance sampling plan method to present a fresh approach to attribute sampling plans. Utilizing the benefits of neutrosophic fuzzy sets, the proposed sampling plan method models and assesses the acceptance standards for attribute sampling. We compare the suggested method to already-in-use attribute sampling techniques plans with new attribute six sigma sampling techniques plan is proposed in order to verified its efficacy. The outcomes show the neutrosophic fuzzy acceptance sampling plan's superiority in terms of its capacity to manage uncertainties, account for ambiguity, and produce more precise quality evaluation outputs.

Quality Inspection Plans for Products Sold under Warranty (보증하(保證下)에 판매(販賣)되는 제품(製品)의 품질검사계획(品質檢査計劃))

  • Kim, Yeong-Ho;Lee, Chang-Hun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.11 no.2
    • /
    • pp.11-18
    • /
    • 1985
  • Three types of warranty policies are considered. They are (1) free warranty policy for repairable products, (2) free warranty policy for nonrepairable products, and (3) rebate warranty policy. Under each warranty policy, a single sampling attribute plan with non-destructive testing is considered. A sampling plan is characterized by the sample size and the acceptance number. For each case, characteristics of an optimum sampling plan are discussed and determined, which minimize the warranty cost and the corresponding quality control cost within the assigned producer's risk and consumer's risk.

  • PDF