• Title/Summary/Keyword: Quay process for shipbuilding

Search Result 2, Processing Time 0.016 seconds

A Study on the Conceptual Design of Quay Process Monitoring System (안벽공정 모니터링 시스템의 개념 설계에 관한 연구)

  • Kim, Ho-Kyeong;Ko, Dae-Eun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.10
    • /
    • pp.426-431
    • /
    • 2016
  • In quay processes in shipyards, it is difficult to manage workers and to maintain secure working environments because at least 1,000 people can occupy the quay at the same time. In this study, a system was designed to monitor the environment and processes of quay operation. In order to lower initial investments and the costs of maintenance and operation, the entire system consists of six connected components. Considering the communication environment of the shipyard site, Wi-Fi and the LoRa communication protocol were selected for the system. The feasibility of the communication protocols was verified by data transmission tests in the field. The designed system can provide real-time information about employees working in the quay area, the safety status of moored ships on the quay, and step-by-step alarms in dangerous situations based on the detected information. The system is expected to prevent or greatly reduce safety hazards.

Decision Supporting Methodology and System Based on Theory of Constraints for Optimal Product Portfolio Strategy in Shipbuilding Industry (제약이론을 기반으로 한 최적제품조합 의사결정 지원 방법론 및 시스템)

  • Kim, In-Il;Han, Seong-Hwan;Kwon, Min-Chull
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.3
    • /
    • pp.362-371
    • /
    • 2009
  • Shipbuilding is a typical 'build to order' industry. It has a business model that generates revenues from building various ships and offshore products in accordance with owner's requirements at each production stage. Under uncertainty in shipping market, it is very essential for the shipbuilder to prepare the fast and competitive decision for product portfolio strategy in order to maximize contribution margin by exploiting production facilities and constraints. In this study, we introduce the unique decision supporting methodology for the optimal product portfolio sets based on Theory of Constraints(TOC). This methodology is established by adopting the concept of Drum Buffer Rope(DBR) in constraints planning and Throughput Accounting (TA) in management accounting of TOC. In addition, Decision Supporting System(DSS) is implemented. This DSS system provides a throughput estimator with reflecting the cost structure of shipbuilding industry and a resource simulator built on heuristic algorithms to operate major constraint-resources in shipyard such as dock, quay and pre-erection area etc. Several examples are presented to show that the proposed methodology and system can effectively support the strategic decision-making process of a global shipbuilding company.