• Title/Summary/Keyword: Rail freight facility

Search Result 4, Processing Time 0.028 seconds

Support Measures for Domestic Rail Freight (국내 철도 화물운송 지원제도 개선방안)

  • Mun, Jin-Su
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.151-160
    • /
    • 2009
  • Recently, the importance of rail in the carriage of freight is strongly emphasized. However, the role of rail in the carriage of freight has been decreasing. The purpose of this study is to suggest policy measures for increasing rail freight. Firstly, this study reviews the current situations of the rail freight in Korea and provides theories for the necessity of government support to rail freight transport. Various support measures are identified and evaluated. According to the evaluation, it is shown that the provision of subsidy for facility construction is the most desirable measure in the sense of cost effectiveness and durability of effect. Finally, detailed implementation strategies for the desirable support measures are suggested.

A Study on the Expansion of the Facility of Port Rail Depot (항만 철송장 시설규모 개선에 관한 연구)

  • Yun, Dong-Hee;Lee, Sang-Myoung;Lee, Yong-Sang
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3256-3263
    • /
    • 2011
  • Large scaled railway freight transportation facilities in harbors are located in Busan port and Gwangyang port. The port rail depot plays an important role as the departure and destination function of railway logistics. However, presently, it is not relatively vitalized because it is not reflect the railway freight transportation's characteristics such as scale of railway tracks or yards area. In addition, even if port rail depot is vitalized, processing capacity is already saturated. Therefore, it is difficult to increase rail transport quantity. To activate railway container transportation business, it is very necessary to recalculate the facility size of port rail depots. Focused on the Busan new port rail depot, this paper analyzes the problems of port rail depot facility that has currently opened and finds some alternatives to resolve them.

  • PDF

A Study on the Assigning Track of Freight Trains in a Rail Container Terminal (철도 터미널 화물열차 작업선배정에 관한 연구)

  • Kim, Kyung-Min;Park, Bum-Hwan;Kim, Dong-Hee;Hong, Soon-Heum
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1209-1214
    • /
    • 2010
  • In these days, rail container service is being more important because it has relatively simple network. In addition, small lot sizes of shipment, frequent shipment, and demand for flexible service are important characteristics in rail container transportation. Efficient container operation at terminals is important in reducing transportation costs and load/unload time. This paper describes the assigning track of freight trains in the railway freight terminal. The paper addresses the operational requirements and facility restrictions to construct a mathematical model for track assignment. In addition, it suggests several types of objectives for the model.

  • PDF

Method for increasing rail operation capacity of capital high speed rail with expanding the high speed railway service (고속철도 서비스 확대를 위한 수도권 고속철도 확충 방안 고찰)

  • Roh, Beung-Guk;Kim, Young-Bea;Shin, Dong-Won
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1254-1268
    • /
    • 2009
  • In 1998, because of the economic crisis called IMF Crisis in Korea, Kyungbu high speed railway project could run by modifying the original plan to open it as a 1st phase only by utilizing the existing railway lines from Seoul to Siheung and the other one from Daegu to Pusan. The modified plan includes that the line from Daegu to Pusan will be constructed as a second phase in next time. Starting railway operation with the changed plan, the combined application operation of high speed rail, passenger rail and freight rail was caused partly from Seoul to Siheung to run into capital area. As a result, the opinion for additional railway line construction is insisted continuously because the operation volume of passenger rail was forced to be reduced, the service quality of it was decreased and it became difficult to add new high speed services. Moreover, with regard to Honam high speed rail, the new construction plan of station in Kangnam metro area as a basement station for starting from Suseo was changed to the plan of turning out at Osong because of the economic effectiveness and this kept resident people in Kangnam metro area and southern Kyungki area unable to get the opportunity of high speed rail service benefit. After beginning of Kyungbu high speed railway operation, national transportation system developments are focused on high speed rail, and when the second phase construction of Kyungbu high speed rail, beginning operation of Kyungjeon line, Jeolla line double track construction, Honam high speed rail in 2014, is completed, the demand for high speed rail will be increased and it is unavoidable to make Kwangmyung station as a basement station and to reduce the number of passenger rail operation. At this moment, it is valuable to consider adding the railway line capacity in capital area to improve the transferring service for citizen who live in area without Kyungbu high speed rail station and to expand the service area from Kangbuk to Kangnam and southern Kyungki area. Accordingly, in this paper, the effective rail operation method, facility plan and the other issue to be reviewed for increasing capital high speed railway lines will be mentioned.

  • PDF