• 제목/요약/키워드: Railway tunnel

검색결과 647건 처리시간 0.024초

Train induced dynamic response of a pedestrian tunnel under a four-track surface railway for different soil water contents

  • Farghaly, Ahmed Abdelraheem;Kontoni, Denise-Penelope N.
    • Geomechanics and Engineering
    • /
    • 제16권4호
    • /
    • pp.341-353
    • /
    • 2018
  • A reinforced concrete pedestrian tunnel is constructed under a four-track surface railway. Heavy rainfall and soil exposure to drying lead to soil with different water content throughout the year. A railway is an open utility that is subject to rainfall without control on the quantity of the water on it and when there is a tunnel under a railway, the water content of the soil around the tunnel is very influential. This research shows the effects of change of water content in the soil around a pedestrian tunnel under a four-track surface railway. The pedestrian tunnel and the soil block around the tunnel are modeled in 3D by the FEM and are studied under the vibrations induced by the moving trains on the four-track surface railway for different soil water contents and the effects of the soil water content on the dynamic behavior of the tunnel and the surrounding soil are demonstrated.

Aerodynamic effects of subgrade-tunnel transition on high-speed railway by wind tunnel tests

  • Zhang, Jingyu;Zhang, Mingjin;Li, Yongle;Fang, Chen
    • Wind and Structures
    • /
    • 제28권4호
    • /
    • pp.203-213
    • /
    • 2019
  • The topography and geomorphology are complex and changeable in western China, so the railway transition section is common. To investigate the aerodynamic effect of the subgrade-tunnel transition section, including a cutting-tunnel transition section, an embankment-tunnel transition section and two typical scenarios for rail infrastructures, is selected as research objects. In this paper, models of standard cutting, embankment and CRH2 high-speed train with the scale of 1:20 were established in wind tunnel tests. The wind speed profiles above the railway and the aerodynamic forces of the vehicles at different positions along the railway were measured by using Cobra probe and dynamometric balance respectively. The test results show: The influence range of cutting-tunnel transition section is larger than that of the embankment-tunnel transition section, and the maximum impact height exceeds 320mm (corresponding to 6.4m in full scale). The wind speed profile at the railway junction is greatly affected by the tunnel. Under the condition of the double track, the side force coefficient on the leeward side is negative. For embankment-tunnel transition section, the lift force coefficient of the vehicle is positive which is unsafe for operation when the vehicle is at the railway line junction.

효율적 방재시설을 위한 정량적 위험도 분석 (An effective prevention facilities for railway tunnel design by using Quantitative Risk Analysis)

  • 권순섭;신화철;정지승;민대홍
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1080-1084
    • /
    • 2007
  • Recently, as demands of new railway and the relocation of existing line, a number of tunnel structures have been constructed. Tunnel structures contribute to minimize the cost and time of transport, but in case of railway fire accident bring serious damages of human life caused by narrowness of shelter, smoke and high temperature, difficulty in rescue. For that reason, at the beginning of plan of tunnel, the optimum design of safety facility in tunnel for minimizing the risks and satisfying the safety standard is needed. In this study, QRA(Quantitative Risk Analysis) technique is applied to design of railway tunnel for assuring the safety function and estimating the risk of safety. The case study is carried out to verify the QRA technique for railway tunnels in Iksan-Sili.

  • PDF

고속화에 따른 철도터널의 단면규모 결정요소에 대한 고찰 (A Study on the Principal Factors of Rail Tunnel Cross-Section Design due to High Speed)

  • 류동훈;이현정;한상연;신현일;정병률;송충렬
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1487-1501
    • /
    • 2011
  • Recently, fast-growing up railway transportations. Because, regional traffic congestion problem solving and a period of rapid expansion to meet the demand of industries. In addition the government also suggest to new paradigm for the future 'Low Carbon, Green Growth' is presented as a new national vision. To meet the social needs and the time demands, Last of the railway increase very long tunnels and huge deep tunnels. Especially this trend accelerated high speed up in the tunnel, the revision of design criteria and research challenges are being actively improved. Mainly in the tunnel cross-section was under the control of the vehicle train speed 150km/hr by the construction of the vehicle cross-section of the tunnel. More than 200km/hr rail tunnel depending on the vehicle's speed caused the tunnel to the pressure fluctuations will be governed by the aerodynamic changes. Considering the economy to ensure the optimum cross-section of the railway tunnel to the description scheme is selected cross-section of the railway tunnel to determine the size domestic or international railway tunnel for the elements((based on fast Algorithm design criteria, the center line spacing, streetcar line, cross-sectional shape, sectoral issues, such as interface and aerodynamics) based on design practices and to review results. In this study, to propose guidelines depending on the size of a railway tunnel cross section for the size of the determining reasonable factors when designing the railway tunnel and cost-effective standards guidelines.

  • PDF

Hard rock TBM project in Eastern Korea

  • Jee, Warren W.
    • 한국암반공학회:학술대회논문집
    • /
    • 한국암반공학회 2008년도 국제학술회의
    • /
    • pp.33-41
    • /
    • 2008
  • The longest tunnel has been halted at Daekwanryung by the failure of the host country of the Winter Olympiad in 2014, but modern High-Power TBM will come to Korea to excavate these long tunnels to establish the better horizontal connection between the western and eastern countries to improve the strong powerful logistic strategy of Korean peninsula. Train operation provides a key function of air movements in a long underground tunnel, and heat generation from transit vehicles may account of the most heat release to the ventilation and emergency systems. This paper indicates the optimal fire suppress services and safety provision for the long railway tunnel which is designed twin tunnel with length 22km in Gangwon province of Korea. The design of the fire-fighting systems and emergency were prepared by the operation of the famous long-railway tunnels as well as the severe lessons from the real fires in domestic and overseas experiences. Designers should concentrate the optimal solution for passenger's safety at the emergency state when tunnel fires, train crush accidents, derailment, and etc. The optimal fire-extinguishing facilities for long railway tunnels are presented for better safety of the comfortable operation in this hard rock tunnel of eastern mountains side of Korea. Since year 1900, hard rock tunnel construction has been launched for railway tunnels in Korea, tunnels have been built for various purposes not only for infrastructure tunnels including roadway, railway, subway, and but also for water and power supply, for deposit food, waste, and oils etc. Most favorable railway tunnel system was discussed in details; twin tunnels, distance of cross passage, ventilation systems, for the comfortable train operations in the future.

  • PDF

터널 화재발생시 시뮬레이션 프로그램을 통한 승객대피계획 (A study on the rescue design of passengers for railway tunnel fire accidents by using simulation program)

  • 권순섭;이종선;이관호;권우성
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1770-1773
    • /
    • 2007
  • Fire accident in tunnel is one of the most critical railway accidents, together with overturning of train by derailment and train crash. Tunnel structures contribute to minimize the cost and time of transport, but in case of railway fire accident occurring bring serious damages of human life caused by narrowness of shelter, poisonous smoke and high temperature raised at the inside of tunnel. For that reason, at the beginning of plan of tunnel, the optimum design for rescue of passengers is needed. For the detail and most suitable design for rescue of passengers, many tunnel designer substituted simulation program for mock examination by its high cost and effort. In this study, simulation program techniques, such as Fluent and Simulex, are applied for verifying the rescue design of passengers reduced the risk when fire accident occurred at tunnel utilizing of case study for planned railway tunnels shows 1,245m length in Iksan-Sili area.

  • PDF

철도용 고효율 친환경 경량방음터널 기술개발 (A Development of the Light Weight Noise Tunnel on a High Degree of Efficiency and Environmentally Friendly for Railway)

  • 손정곤;박광현;류래언
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2014년도 춘계학술대회 논문집
    • /
    • pp.487-490
    • /
    • 2014
  • These Days a lot of Noise Complaints in vicinity of Railway has been more increase than before. Almost 1/3 Residences who lives in Railway side are Exposure to Noise Pollution. Since the Apartment Buildings around Railway are getting more higher, so those of the Noise Barrier are not best solution anymore. We are going to make a New Plane with the state of the art technology for Railway Noise Abatement Control. Our Goal are focus on a development of Light Weight Noise Tunnel designed by new absorption mat'l and tunnel Stucture on the Overbridge and Viaduct of existing Railway. New Noise Tunnel will be reducing their weight more than 30% against Road Traffic One and also 10dB(A) Noise Reduction against Noise Barrier.

  • PDF

전기 철도 터널 내 전력설비의 효율적 설계 및 구현 (An Efficient Electric Installation Design and Implementation for Electric Railway Tunnels)

  • 이규대;전정표;김광호
    • 산업기술연구
    • /
    • 제31권B호
    • /
    • pp.23-26
    • /
    • 2011
  • The efficiency and performance of electric facilities in electric railway tunnels are quite important factors for operation and maintenance of railway since most of maintenance works for railways are doing during the night. Specially, in the railways like Gyeong-Chun Line passing through many mountains, many parts of railways are constructed with tunnels. So, this paper proposes the efficient electrical installation design scheme for railway tunnel considering the system performance, economics, and the reliability of power supply to tunnel electric facilities. Finally, the proposed design scheme is implemented to the tunnel design for Gyeong-Chun Line (Electric Railway).

  • PDF

고속철도 터널입구에서 형성되는 압축파의 특성에 관한 연구 (Characteristics of High-Speed Railway Tunnel Entry Compression Wave)

  • 김희동;김태호;이종수;김동현
    • 대한기계학회논문집B
    • /
    • 제23권2호
    • /
    • pp.234-242
    • /
    • 1999
  • Flow phenomena such as the pressure transients Inside a high-speed railway tunnel and the Impulsive waves at the exit of the tunnel are closely associated with the characteristics of the entry compression wave, which is generated by a train entering the tunnel. Tunnel entrance hood may be an effective means for alleviating the Impulsive waves and pressure transients. The objective of the current work is to explore the effects of the train nose shape and the entrance hood on the characteristics of the entry compression wave. Numerical calculations using the method of characteristics were applied to one-dimensional, unsteady, compressible flow field with respect to high-speed railway/tunnel systems. Two types of the entrance hoods and various train nose shapes were employed to reveal their influences on the entry compression wave for a wide range of train speeds. The results showed that the entry compression wave length increases as the train nose becomes longer and the train speed becomes lower. The entry compression wave length in the tunnel with hood becomes longer than that of no hood. Maximum pressure gradient in the compression wavefront reduces by the entrance hood. The results of the current work provide useful data for the design of tunnel entrance hood.

QRA를 이용한 철도터널 방재 안전성 평가 (Estimation of Safety in Railway Tunnel by Using Quantitative Risk Assessment)

  • 김도식;김도형;김우성;이두화;이호석
    • 터널과지하공간
    • /
    • 제16권5호
    • /
    • pp.357-367
    • /
    • 2006
  • 최근 신설철도가 계획되거나 선형개량공사가 증가함에 따라 터널 구조물이 장대화되고 있다. 장대터널에서 터널내 열차화재 등이 발생하는 경우 대형사고를 초래할 수 있으므로 터널 방재에 대한 관심이 증가하고 있으며, 이에 따른 터널 방재기준도 더욱 강화되고 있는 실정이다. 따라서 터널계획시 방재기준을 만족하면서 위험도를 최소화할 수 있는 최적 방재시설물 계획이 요구되고 있다. 이와 같이 합리적인 장대터널 방재 설계를 위해서는 열차사고 통계분석 및 피난시뮬레이션을 기초로 한 보다 객관적이며, 정량적인 평가가 필요하다 할 수 있으며, 이를 위해서 본 연구에서는 정량적 위험도 분석기법인 QRA (Quantitative Risk Assessment)를 철도터널에서의 방재설계에 적용하고자 하였다. 대상터널은 연장 약 4.1 km의 산악터널(사례 I)과 연장 약 3.6 km인 도시지역터널(사례 II)로서 두 터널 모두 철도터널 관련 방재기준보다 향상된 터널방재성능이 요구되어, 도시지역 안전기준에 만족하는 합리적인 터널내 방재구조물 계획을 수립하기 위하여 정량적 위험도분석을 실시하였다. 장대터널에서의 갱외탈출로 개념의 사갱 및 수직구 계획을 수립하기 위하여 각각의 경우에 대한 QRA를 실시하고, 장대터널의 방재 안정성을 평가함으로써 실행 가능한 합리적인 수준의 터널 방재설계를 수행하고자 하였다.